Loading...
HomeMy WebLinkAboutCENTERPOINT PLAZA REPLAT - PDP - 35-01C - CORRESPONDENCE - LETTER OF INTENT (5)SPRING CREED CENTER PUD D= 3-14'22" R= 705.39' LOT 6 LOT 5 LENGTH-- 39.88' I CH=N88'27'D2"W 39.88' • MIDPOINT DRIVE �� (RIGHT OF WAY VARIES) - S86 14'39"E UNKNO I I _ _� - . _ . __ 32' PROPERTY. LINE — — \ I L , all, oli I O W LOT ia F 1119 I ` I , \ ,N' O m' • \ �°� I LOTI //o 9 ( LOT 2 PROPOSED ACCESS. EMERGENCY z ACCESS. DRAINAGE & PROPERTY YNE I I I UTILITY EASEMENT V (0.29 ACRES) J _ S89'46'19" --------- e-._SOO'00'02"E- - / 23.64' II o, ?', N LOT 3 PROPOSED L ACCESS, EMERGENCY ACCESS. DRAINAGE & 3 UTILITY EASEMENT P OPER i SINE I i �� O l� `�% : (0.09 ACRES) �,��. Go 1 `\ O •,�.* 01 LOT 3 1134'03'47" \-R4 ENGTH 28.87' —CH=N67'01'54"E �'^ 1 FEPICTION ONLY, OIT A ES IS OGALDDESCRIPTION. N 0 100' 150' 200' 1:1001 �%%mj%m%1 22870f\active 187010600\cvl design\drawing\exhibit\Offsite Easement.dwg June, 2007 2 7-06— 1 03: Bv: d 1870106W Stantec Consulting Inc. KDAN FRASIER N 209 South Meldrum Street CENTERPOINT PLAZA Fort Collins CO U.S.A Rjure Na = 80521 H 970.482.5922 Tore Stodw 970.482.6368 OFFSITE EASEMENT EXHIBIT 08/07/07 13:13 FAX 303 227 1384 GYPSUM PRODUCTS 11001 09.07.07 KeviuFraziiier 2121 NfidW C_ O 8052S� 302 .- Fort Collins, Dear Kevin, Please accept dais as a leW of iz�t to sip an access, int pla�Y �' dry and utility easement a�eut for purPoses of the C ambit The easema� lots 2 project, as illustrated in the attaobed offsite Ease�m�en Lately 0 38 acres and. 3 of the Centerpoint plaza and includes a total of app Signed by: HO)igm Amer County re=s) Gypm ptoppd&es, LLC (this is the owner per 1400 Ease 61 st Strect Denver, CO $0216 F�X•d t 3�3.�/319y 1%PG4L"KV"K a n d x c a p e A r c h i t r c t u r c S i t e P l a n n i n g Ci r a p h i c August 9, 2007 Sheri Langenberger Steve Olt City of Fort Collins - Zoning 281 North College Fort Collins, CO 80521 Dear Sheri and Steve, 1 am working to gain approval to proceed with public hearing on the Centerpoint Plaza Replat PDP. We received comments from our initial submittal on June 5, 2007. Jim Allen -Morley told me that engineering would approve the plans once a letter of intent was received from the adjacent land owner for an access, emergency access and utility easement. Please review the attached letter of intent and give me a call or email to confirm if it meets your requirements. If it does, I will schedule a review with Steve to verify the changes he requested meet his requirements so that we can proceed with our hearing. ' cerely, Don Tiller\ 144 North Mason Street Suite 2 • tort Collins, Colorado 80524 (970) 472-9125 • rax: 070) 494-0728