Loading...
HomeMy WebLinkAboutCENTERPOINT PLAZA REPLAT - PDP - 35-01C - SUBMITTAL DOCUMENTS - ROUND 1 - PROJECT NARRATIVEC. A fire lane, with an emergency access easement, is required. What is the status of the eAsting private drive into the site? d. The addressing for this new building must meet PFA's requirements. Please contact Carie, at 416-2869, if you have questions about these comments. Pertaining to the questions in the comment.. The location and size of sprinkler connections will be specified at building pemvt phase. The existing private drive adjacent to the east property boundary will be retained, with appropriate emergency access easements dedicated on the plat. Per discussion in conceptual review, it is our understanding an emergency access loop through the site is not required 8. This development request will be subject to the Development Review Fee Schedule that is available in the Current Planning Department office. The fees are due at the time of submittal of the required documents for the appropriate development review process by City staff and affected outside reviewing agencies. Also, the required Transportation Development Review Fee must be paid at time of submittal and this fee is paid directly to the Engineering Department. Understood. 9. This development proposal is subject to all the requirements set forth in the City's LUC, specifically Article 2. Administration (Development Review Procedures), Article 3. General Development Standards, and Article 4. Districts (specifically Division 4.27 - Employment Zoning District). The most pertinent sections of Article 3 (relative to this new office development) are Sections 3.2.1 - Landscaping, 3.2.2 - Parking, 3.5.1 - Architectural Compatibility, and 3.5.3 - Mixed - Use, Institutional and Commercial Buildings. Also, there are Land Use and Development Standards specific to the E District that development on this property will be subject to. Copies of Article 3 and Division 4.27 are available in the Current Planning Department or on the City of Fort Collins website @ www.fcgov.com. Go to Departments, then the Current Planning Department. Understood. 10. The City's Current Planning Department will coordinate the development review process. The required submittal package will be submitted to the Neighborhood & Building Services Department and distributed accordingly to other City departments and outside reviewing agencies involved in development review. The submittal requirements for Project Development Plans and Final Compliance Plans are available on the City's website. Understood 11. The proposed office use in the one new building is permitted in the E District as a Type 1 review and public hearing. See Section 4.27(13)(2)(c)1 of the LUC. The applicant for this development request will not be required to hold a neighborhood information meeting prior to formal submittal of the project. Understood. Centerpoint Plaza 11 e. A storm sewer was installed to eliminate on -site detention by conveying the 100-year runoff directly to Spring Creek. Water guality treatment is provided on -site and must be maintained. The drainage report revision for the site should be reviewed and used to document the water quality treatment. The developer's design engineer will also need to verify that the imperviousness used in the report is not exceeded. Please contact Glen, at 224-6065, if you have questions about these comments. Understood. 5. Janet McTague of the Light & Power Department offered the following comments: a. The City has existing power to the site and street lights are in the area. b. The transformer location must be coordinated with light & Power. Transformers can be located no more than 10' from a paved area that can be accessed by City trucks and equipment. C. The standard electric development charges will apply to this development request d. A C-1 Commercial Form must be filled out to help determine the electric needs for this development. Please contact Janet, at 224-6154, if you have questions about these comments. Comments from Light and Power Department are understood. 6. David Averill of the Transportation Planning Department offered the following comments: a. A Transportation Impact Study (TIS), addressing all modes of transportation, will be required with your PDP submittal. Please contact Eric Bracke of the Traffic Operations Department, at 224-6062, and David Averill of the Transportation Planning Department, at 416-2643, to determine what information will be needed in the TIS pertaining to LOS for vehicle, pedestrian, bicycle, and transit modes of transportation. b. This development proposal will be subject to the Transportation Level of Service Requirements set forth in Section 3.6.4 of the LUC. C. Sidewalks are constructed along both streets bounding this property. d. Handicapped access ramps must be provided and they must be designed and constructed to the standards set forth in the City's LUC. e. Bicycle parking should be provided in compliance with Section 3.2.2(C)(4) of the LUC. Please contact David, at 416-2643, if you have questions about these comments. Understood. Thanks! Carte Dann of the Poudre Fire Authority offered the following comments: a. The building must be fire sprinklered and equipped with a Knox Box. Where is the location and what is the size of the sprinkler connection? b. The building must be within 300' of a fire hydrant. Centerpoint Plaza 10 it A Development Agreement and a Development Construction Permit will be required for development on this property. Development on this property will be responsible for the repair and/or replacement of any damaged existing curb, gutter, and sidewalk around the site. M. Development on this property will be responsible for the undergrounding of any existing overhead utilities along or through the property. n. The required Transportation Development Review Fee must be paid at time of submittal of the PDP. This fee is paid directly to the Engineering Department. Please contact Randy to determine the actual amount of fee to be paid. Please contact Randy, at 221-6605, if you have questions about these comments. Comments from the engineering department are understood and implemented with this application. In a previous development plan application, PRPA authorized parking and drainage within their easement This wi0be reconfirmed as part of this application. Given the changes in easements, a replat is include with this application. 3. Roger Buffington of the Water/Wastewater Department offered the following comments: a. There is an existing 8" water main in Midpoint Drive and an existing 6" water main extending south from Midpoint Drive in the drive to the east. b. There is an existing 30" sanitary sewer main in the railroad right-of-way to the south and an existing 8" sanitary sewer main extending south from Midpoint Drive in the drive to the east. C. Plant investment (development) fees and water rights will apply to this development request. They will be collected at the time of issuance of building permits. d. The City's water conservation standards for landscaping and irrigation systems will apply to this development request. Please contact Roger, at 221-6854, if you have questions about these comments. Thanks/ 4. Glen Schlueter of the Stormwater Utility offered the following comments: a. The site in on Stormwater Inventory Map #12K. A copy of the map can be obtained from the Utility Service Center at 700 Wood Street. b. The design of this site must conform to the drainage basin design of the Cache La Poudre River Master Drainageway Plan, as well as the City's Design Criteria and Construction Standards. C. The City-wide development fee is $3,070 per acre ($0.0705 / sq. ft.) for new impervious area over 350 square feet. No fee is charged for existing impervious area on the site. This fee is to be paid at the time of issuance of building permits. d. A drainage and erosion control report and construction plans are required and they must be prepared by a Professional Engineer registered in the State of Colorado. Centerpoint Plaza g. This proposed development is in an area that is not in the City's Residential Neighborhood Sign District. All signage will be reviewed by the Zoning Department, against the Sign Code, at the time of a building permit application. h. Any trash enclosure in this development must be designed and constructed to accommodate recycling and match the materials on the building. Please contact Jenny, at 416-2313, if you have questions about these comments. The comments from the Zoning Department are understood and incorporated into the application mateiiaix 2. Randy Maizland of the Engineering Department offered the following comments: a. The standard utility plan submittal requirements will apply to this development request. b. Street oversizing fees will apply to this development request. The fees are based on vehicle trip generation for the proposed land use in the development plan. Please contact Matt Baker of Engineering, at 224-6108, for detailed information on the fees. The fees will be collected at the time of issuance of building permits. C. The Larimer County Road Impact Fees will apply to development on this property. d. A Transportation Impact Study (TIS), addressing all modes of transportation, will be required with your Project Development Plan (PDP) submittal. Please contact Eric Bracke of the Traffic Operations Department, at 224-6062, and David Averill of the Transportation Planning Department, at 416-2643, to determine what information will be needed -in the TIS pertaining to Level of Service (LOS) for vehicle, pedestrian, bicycle, and transit modes of transportation. e. This development will be subject to the requirements set forth in the Larimer County Urban Area Street Standards (LCUASS). Any public improvements associated with this new development must be built according to LCUASS. f. The new parking drive aisle configuration may require an additional off -site access easement to connect to the existing off -site access easement at the southeast comer of this site. g. The Platte River Power Authority (PRPA) has a "no build" easement across the southerly portion of this property. This development will need to get pemussion from PRPA to build any improvements over the easement. h. This development is responsible for a repay for a Special Improvement District (SID) assessment. Please contact Matt Baker of Engineering, at 224-6108, for information on the SID assessment. I. Please contact Carie Dann of the Poudre Fire Authority (PFA), at 416-2869, for their emergency access needs. PFA may require that this development dedicate the existing off - site private drive on the east side as an Emergency Access Easement. j. A subdivision plat Is not required as part of this submittal to the City for development review because it was previously platted as Lot One of Centerpoint Plaza. Any changes in easements, vacations of existing easements, or new easements determined to be necessary on the property may be done through separate documents or by replat of the property. Centerpoint Plaza Planning Rationale and Assumptions This proposed commercial building addition is a critical component to the completion of this site. With the adjacent uses and the site served by Timberline Road, a major arterial, it is anticipated the site will attract a variety of professional office uses. It is anticipated that employees and clientskustomers will find it convenient to use alternative modes of transportation when accessing this site. Land Use Conflicts The site is in an urban setting and does not present any land use conflicts to be mitigated. The proximity of the Burlington Northern Railroad and the Platte River Power Authority transmission lines are not anticipated to be a concern given the commercial nature of uses anticipated for this site. Neighborhood Meeting Response It was determined during the conceptual review that a neighborhood meeting was not warranted for this development Anticipated Development Schedule Project Plan Approval August 2007 Final Compliance Plan Approval January 2008 Start Land Development March 2008 Response to Conceptual Review Comments 1. Jenny Nuckols of the Zoning Department offered the following comments: a. This property is in the E - Employment District. The proposed office use is permitted in this District, subject to an administrative (Type 1) review and public hearing. b. All non-residential buildings in the E District shall be limited to 4 stories in height. C. The maximum parking allowances for non-residential uses are set forth in Section 3.2.2(K)(2) of the LUC, specifically the table in Section 3.2.2(K)(2)(a). There are Alternative Compliance and Exception to the General Office Parking Standard measures for non- residential uses available in the Land Use Code (LUC). b. At least 1 van accessible parking space and a certain number of handicapped parking spaces are required in this development. The number of spaces and definition of van accessible are found in Section 3.2.2(K)(5)(d) of the LUC. C. Bicycle parking must be provided in the development and it must satisfy the requirements set forth in Section 3.2.2(C)(4) of the LUC. d. The building in this development will be subject to the requirements set forth in Section 3.5.3 - Mixed -Use, Institutional and Commercial Buildings of the LUC relating to the "build - to" line standards. e. The required amount of parking lot interior landscaping is set forth in Sections 3.2.1(E)(5) and 3.2.2(M) of the LUC. The required (minimum) amount is either 6% or 10%, depending on the number of parking spaces in a lot. In excess of 100 spaces requires 10% interior landscaping. f. Landscaping requirements, including street trees around the site, must be provided in accordance with Section 3.2. l of the LUC. Centerpoint Plaza Policy ED-1.7 Redevelopment/Infill. There will be future infill and redevelopment of existing employment centers. As non -compatible businesses vacate, new development planned for Employment Districts should be designed to complement the character of the surrounding area. Policy ED-1.8 Site Design. The design character of employment facilities should be reflective of a business park or campus setting, compatible with adjoining uses, with full landscaping of parking, perimeter and building edges to buffer the impacts of large facilities. Recreation, parks and open space areas should be incorporated into the design, as well as pedestrian linkages to City trails. This project proposal is essentially an infill project, completing the previously approved first building on the site. Addition of a second commercial building changes the character of the site from an isolated 2.5 story commercial building to that of a mini -campus setting. PRINCIPLE ED-2: Employment Districts will be accessible to the community's multi -modal transportation system. Policy ED-2.1 Access. Street access to and within Employment Districts should be designed to serve multi - modes of transportation, and provide multiple entry and exit points to disperse traffic. Policy ED-2.2 Parking. Parking and other vehicle use areas will be located in the interior of blocks, or in other secondary areas, so that they do not interfere with pedestrian connections. Trees and other landscaping will be provided within parking lots, along with pedestrian paths connecting buildings. Parking areas will be screened from adjacent streets with berming and landscape planting. Policy ED-2.4 Links to Transit. Employment Districts will be connected to the citywide transit system. Transit stops and ride -sharing facilities will be designed for each area and linked to high -frequency service. Shopping areas will be conveniently located and designed so as to encourage walking by employees. This site is accessible to the community's multi -modal transportation system, Timberline Road construction recently completed and the addition of the new Transfort bus route # 17 serving the immediate vicinity. Landscape and Circulation Elements Centerpoint Plaza is bounded by public streets on the west (Timberline. Road) and north (Midpoint Drive). Access to the site is from three points of access off a private drive connecting to Midpoint Drive. The landscape design serves to appropriately buffer the on -site parking and to create a pleasing streetscape to the adjacent public streets. The on -site detention pond is integrated with the landscape design. The landscape buffer on the southern portion of the west boundary and the south boundary is within the Platte River Power Authority easement which restricts landscape material mature height. In response to this restriction, a mix of taller shrubs and shorter ornamental trees used in place of canopy trees. Ownership and Maintenance Midpoint and Timberline LLC owns and maintains all elements other than the individually owned condo spaces, including • On -site shared parking and drive aisles • All pedestrian walkways • Common signage • All landscape plants and materials Employment Projection Total employment is anticipated to be approximately 175 employees. This includes approramately 70 employees represented in the eadsting building, with an additional 105 employees represented in the proposed building. This employment projection is highly dependent on the final configuration of buildings and type of professional employment this development attracts. Centerpoint Plaza PRINCIPLE CAD-3: Commercial developments create a powerful impression of the City, both individually and taken together as a whole. While corporate franchises and chain stores will remain vital and recognizable, commercial developments will be designed to contribute to Fort Collins' distinct visual quality and uniqueness. Policy. CAD-3.1 Modification of Standardized Commercial Architecture. Commercial buildings will demonstrate a reflection of local values with site -specific design. Standardized architectural prototypes will be modified, if necessary, so that the City's appearance remains unique. Development will not consist solely of repetitive design that may be found in other communities. Policy CAD-3.2 Compatibility with Surrounding Development. Proposed commercial buildings must contribute to the positive character of the area. Building materials, architectural details, color range, building massing, and relationships to streets and sidewalks will contribute to a distinctive local district, corridor, or neighborhood. This is essentially the second phase of a previously approved Project Development plan which recently expired. The proposed commercial building will be compatible with the existing building architecture, resulting in the site to appear fully developed as a mini -campus. PRINCIPLE ECON-1: The City will pursue a balanced and sustainable economic development program. Policy ECON-1.5 Maintain and Expand City Revenue Base. The City will ensure that commercial uses that generate the sales and use tax revenues which support the City's financial base are maintained and expanded. The City will also explore other options to expand and diversify its revenue base, including targeted annexations of existing commercial corridors, such as the Mulberry Corridor, as well as revenue sharing agreements with other communities. Centerpoint Plaza is in an area zoned Employment. The proposed development will make a positive contribution to the City's revenue base and Is fully aligned with the purpose of the Employment zone district. The site plan increases the commercial floor space opportunity from 21,800 square feet to a total of 55,600 square feet, a 255% increase. PRINCIPLE ED-1: Employment Districts will be major employment centers in the community. These districts will also include a variety of complementary uses to meet the needs of employees, such as business services, convenience retail, lodging, child care, recreation, housing and restaurants. By design, they will encourage non -auto travel, car and van pooling, telecommuting and transit use. Their attractive appearance should allow them to locate adjacent to residential neighborhoods and along primary entryways into the community. Policy ED-1.1. Range of Employers. Employment Districts will vary in size and structure to meet the requirements of a range of employers, from small businesses to those that need relatively large parcels of land to accommodate their facilities. Policy ED-1Z. Primary Uses. Primary uses in an Employment District will include: a. Research facilities, testing laboratories, offices and other facilities for research and development b. Light industrial uses c. Hospitals, clinics, nursing and personal care facilities d. Regional, national or international headquarters of a services -producing organization e. Vocational, business or private schools and universities f. Professional offices g. Finance, insurance and real estate services h. Other uses of similar character Policy ED-1.6 District Design. Developments will form a coherent, attractive business park setting in each District. The organizing element of a District will either be a clear, unifying network of streets and sidewalks, or a system of campus -like outdoor spaces with connecting walkway spines. The pattern will focus on common destinations, particularly transit stops, day care facilities, and convenience shopping centers. Centerpoint Plaza Policy T-2.1 Transit System. The City's public transit system will be expanded in phases to provide integrated, high -frequency, productivity -based transit service along major transportation corridors, with feeder transit lines connecting all major district destinations, consistent with adopted transit plans. Policy T-2.2 Transit Stops. Transit stops will be integrated into existing and future business districts and Neighborhood Commercial Centers in a way that makes it easy for transit riders to shop, access local services, and travel to work. Transit stops should be provided no more than 1/4 mile walking distance of most residences to the extent feasible. The design and location of transit stops should function as an integral part of these destinations and provide adequate lighting, security, pedestrian amenities and weather protection. PRINCIPLE T4: Bicycling will serve as a practical alternative to automobile use for all trip purposes. PRINCIPLE T-5: The City will acknowledge pedestrian travel as a practical transportation mode and elevate it in importance to be in balance with all other modes. Direct pedestrian connections will be provided from places of residence to transit, schools, activity centers, work and public facilities. Policy T-5.1 Land Use. The City will promote a mix of land uses and activities that will maximize the potential for pedestrian mobility throughout the community. Policy T-5.2 Connections. Pedestrian connections will be clearly visible and accessible, incorporating markings, signage, lighting and paving materials. Other important pedestrian considerations include: a. Building entries as viewed from the street should be clearly marked. Buildings should be sited in ways to make their entries or intended uses clear to and convenient for pedestrians. b. The location and pattern of streets, buildings and open spaces must facilitate direct pedestrian access. Commercial buildings should provide direct access from street comers to improve access to bus stop facilities. Shopping areas should provide for pedestrian and bicycle connections to adjoining neighborhoods. c. Creating barriers which separate commercial developments from residential areas and transit should be avoided. Lot patterns should be provide safe and direct pedestrian connections from residential areas to schools, parks, transit, employment centers, and other neighborhood uses. d. Direct sidewalk access should be provided between cul-de-sacs and nearby transit facilities. Policy T-5.3 Continuity. The City will provide a safe, continuous and understandable pedestrian network incorporating a system of sidewalks, crossings and trails throughout the community. Bridges and crossings should be provided over railroads, rivers, drainageways, and other features that may be major barriers to a continuous pedestrian network. Where bridges and crossings are appropriate, impacts to wildlife and plant communities should be mitigated. Policy T-5.4 Sidewalks. Sidewalks will be designed, constructed, and maintained to provide safety, comfort, and a "walkable" community. New development will follow adopted design standards for sidewalk design. Older, existing streets will be retrofitted to provide improved, widened, or detached sidewalks in conjunction with capital improvement or maintenance projects. Centerpoint Plaza benefits from many of the transportation principles and polices. The site is on the west border of a grouping of uses. Transfort route 17 now serves this general area, providing a transit stop within easy walking distance of the site. Timberline Road provides adequate bicycle lanes, promoting alterative modes of transportation to the site. PRINCIPLE CAD-1: Each addition to the street system will be designed with consideration to the visual character and the experience of the citizens who will use the street system and the adjacent property. Together, the layout of the street network and the streets themselves will contribute to the character, form and scale of the City. Policy CAD-1.3 Streetscape Design. All new streets will be functional, safe and visually appealing. Shade trees, landscaped medians and parkways, public art, and other amenities will be included in the streetscape. Policy CAD-1.4 Street Tree Design. Street trees should be used in a formal architectural fashion to reinforce, define and connect the spaces and corridors created by buildings and other features along a street. Canopy shade trees will constitute the majority of tree plantings, and a mixture of tree types will be included, arranged to establish partial urban tree canopy cover. Existing trees will be preserved to the maximum extent feasible. Centerpoint Plaza Planning Objectives Centerpoint Plaza is a 2.34 acre commercial development within an E - Employment Zone District. There is an existing 2.5 story office building on site. This application's objective is to expand the site to include a second 48,000 square foot 2.5 story commercial building, fully utilizing the site. With the presence of an existing commercial building on site, this project was planned with the following design objectives: • Match the architecture of the existing building to present a consistent "look and feel" from Timberline Road and Midpoint Drive . • Orient the new building to allow easy pedestrian access between buildings The Platte River Power Authority power transmission line runs the length of the southern property boundary. PRPA has an easement, extending approximately 100 feet into the site, which restricts height of landscape materials and lighting fixtures. Given this restriction, shorter ornamentals and shrubs will be used in some cases typically requiring canopy trees. The resulting site plan achieves these objectives. The proposed building is rotated 90 degrees to the existing building, with a pedestrian walkway connecting the two buildings. With the second building, proposing a additional 33,800 square feet, the site is fully utilized while providing adequate parking and access. Principles and Policies Specific principles and policies of the Fort Collins City Plan that are addressed by The Center at Rigden Farm are as follows: PRINCIPLE LU-1: Growth within the City will promote a compact development pattern within a well- defined boundary. Policy LU-1.1 Compact Urban Form. The desired urban form will be achieved by directing future development to mixed -use neighborhoods and districts while reducing the potential for dispersed growth not conducive to pedestrian and transit use and cohesive community development. Centerpoint Plaza is zoned E — Employment. This project is bounded on the west by Timberline Road, a major arterial, with the Burlington Northern Railroad and Platte River Power Authority transmission lines on the south property boundary. Given the surrounding uses and features, combined with the unique triangular shape of the south portion of the site, the addition of the second commercial building strongly supports the promotion of compact development patterns. PRINCIPLE T-1: The physical organization of the city will be supported by a framework of transportation alternatives that balances access, mobility, safety, and emergency response throughout the city, while working toward reducing vehicle miles traveled and dependence upon the private automobile. Policy T-1.1 Land Use Patterns. The City will implement land use patterns, parking policies, and demand management plans that support effective transit, an efficient roadway system, and alternative transportation modes. Appropriate residential densities and non-residential land uses should be within walking distance of transit stops, permitting public transit to become a viable alternative to the automobile. Policy T-1.2 Multi -Modal Streets. Street corridors will provide for safe, convenient, and efficient use of all modes of travel, including motor vehicles, transit, bicycles, and pedestrians. PRINCIPLE T-2: Mass transit will be an integral part of the City's overall transportation system. Centerpoint Plaza Property Description Centerpoint Plaza is located on the south east comer of Timberline Road and Midpoint Drive. The total site area is t2.34 acres. The required street right-of-way has been dedicated. There is an existing office building on site. The previously approved Project Development Plan the specified this second phase of development has expired. The purpose of this application is to gain re -approval of this second phase. Legal Description: BEING A REPLAT OF LOT 1, CENTERPOINT PLAZA LOCATED IN THE NORTHWEST QUARTER OF SECTION 20, TOWNSHIP 7 NORTH, RANGE 68 WEST OF THE 6TH PRINCIPAL MERIDIAN, CITY OF FORT COLLINS, COUNTY OF LARIMER, STATE OF COLORADO, BEING MORE PARTICULARLY DESCRIBED AS FOLLOWS: BASIS OF BEARINGS: THE WEST LINE OF THE NORTHWEST QUARTER SAID SECTION 20, AS BEARING NORTH 00003'29" EAST, WITH ALL BEARINGS HEREIN RELATIVE THERETO. COMMENCING AT THE NORTHWEST CORNER OF SAID SECTION 20, THENCE SOUTH 00°0329" WEST ON SAID WEST SECTION LINE, A DISTANCE OF 553.50 FEET; SOUTH 89°5631" EAST, A DISTANCE OF 95.50 FEET TO A POINT ON THE SOUTHERLY RIGHT OF WAY OF MIDPOINT DRIVE AS SHOWN ON THE PLAT OF CENTERPOINT PLAZA RECORDED AT RECEPTION NUMBER 2003-0128022 OF THE LARIMER COUNTY CLERK AND RECORDERS OFFICE, SAID POINT BEING THE POINT OF BEGINNING; THENCE NORTH 8905631" WEST ON SAID SOUTHERLY RIGHT OF WAY, A DISTANCE OF 218.15; THENCE SOUTH 00002'08" EAST, A DISTANCE OF 534.29 FEET TO A POINT ON THE NORTHERLY RIGHT OF WAY OF THE COLORADO AND SOUTHERN RAILROAD; THENCE ALONG SAID NORTHERLY RIGHT OF WAY, 341.66 FEET ALONG A CURVE CONCAVE TO THE NORTHEAST HAVING A CENTRAL ANGLE OF 6°57'15", A RADIUS OF 2814.93 FEET AND A CHORD WHICH BEARS NORTH 45°3334" WEST, 341.45 FEET TO A POINT ON THE EASTERLY RIGHT OF WAY OF TIMBERLINE ROAD; THENCE NORTH 00°03'29" EAST ON SAID EASTERLY RIGHT OF WAY, A DISTANCE OF 270.47; THENCE 39.27 FEET ALONG A CURVE CONCAVE TO THE SOUTHEAST HAVING A CENTRAL ANGLE OF 90000'00", A RADIUS OF 25.00 FEET AND A CHORD WHICH BEARS NORTH 45003'29" EAST, 35.36 FEET TO THE POINT OF BEGINNING. THE ABOVE -DESCRIBED TRACT OF LAND CONTAINS 2.34 ACRES, MORE OR LESS, AND IS SUBJECT TO ALL EASEMENTS AND RIGHTS OF WAY OF RECORD OR EXISTING. Centerpoint Plaza 2 Project Directory Developer and Applicant Midpoint and Timberline, LLC Engineer Partners and/or officers: Stantec, Inc. Kevin Frazier 209 South Meldrum Fort Collins, CO 80521 Owners Contact: Jim Allen -Morley Midpoint and Timberline, LLC (970) 482-5922 2121 Midpoint Drive, Suite 302 (970) 482-6368 (fax) Fort Collins, CO 80525 Partners and/or officers: Traffic Consultant Kevin Frazier Delich Associates 2272 Glenhaven Drive Building A, LLC Loveland, CO 80538 2121 Midpoint Drive, Suite 302 Contact: Matt Delich Fort Collins, CO 80525 (970) 669-2061 Partners and/or officers: (970) 669-5034 (fax) Kevin Frazier Lighting Consultant Site Planning and Project Lead Illumination Planning Vignette Studios, LLC 2408 Tamarac Drive 144 N Mason, Suite 2 Fort Collins, CO 80521 Fort Collins, CO 80524 Contact: Tom Rorabaugh Contact: Don Tiller (970) 482-2277 (970) 472-9125 (970) 482-4884 (fax) (970) 494-0728 (fax) Centerpoint Plaza Table of Contents Tableof Contents............................................................................................................................................i ProjectDirectory ............................................................................................................................................ ] PropertyDescription...................................................................................................................................... 3 PlanningObjectives....................................................................................................................................... 4 Principlesand Policies................................................................................................................................ 4 Landscape and CirculationElements .......................................................................................................... 7 Ownership and Maintenance...................................................................................................................... 7 EmploymentProjection.............................................................................................................................. 7 Planning Rationale and Assumptions.......................................................................................................... 8 LandUse Conflicts..................................................................................................................................... 8 NeighborhoodMeeting Response.................................................................................................................. 8 Anticipated Development Schedule................................................................................................................ 8 Response to Conceptual Review Comments.................................................................................................. 8 Centerpoint Plaza Centerpoint Plaza Project Development Plan Supporting Documentation May 16, 2007