Loading...
HomeMy WebLinkAboutVERIZON WIRELESS FTD COLLINDALE - PDP - PDP140021 - CORRESPONDENCE -• Comment Number: Comment Originated: 01/06/2015 01/06/2015: System Modification charges may apply if an existing transformer needs to be resized to service load. The existing transformer is an open delta bank and we will need to discuss existing services and new service voltage requirements to be sure we can utilize this configuration otherwise a new transformer may need to be installed eliminating the existing open delta bank. Comment Number: 2 Comment Originated: 01/06/2015 01/06/2015: Please fill out a C-1 forth and send a digital copy to jspaulding@fcgov.com to coordinate billing and construction requirements. Department: PFA Contact: Jim Lynxwiler, 970.416.2869, ilynxwiler0poudre•fire.org Topic: General Comment Number: 1 Comment Originated: 12/24/2014 12/24/2014: EMERGENCY ACCESS EASEMENT The EAE needs to connect to a public way. Details of the proposed fire access road were not included but referenced to Sheet 22.2. Department: Stormwater Engineering Contact: Dan Mogen, , dmoaenCaft-gov.com Topic: Drainage Report Comment Number: 1 Comment Originated: 12/19/2014 12/19/2014: The drainage letter states "the increased permeability of the crushed rock compared to the grass." For future reference, this is not correct; gravel has a runoff coefficient of 0.5 while the runoff coefficient for grass ranges from 0.1-0.35. Department: Technical Services Contact: Jeff County, 970.221.6588, jcounty(lfcoov.com Topic: General Comment Number: 1 Comment Originated: 12/30/2014 12/30/2014: A complete plan set will need to be reviewed prior to approval. Comment Number: 2 12/30/2014: All plan sheets must be 24"06" when filed. Comment Number: 3 12/30/2014: There are line over text issues. See redlines. Comment Originated: 12130/2014 Comment Originated: 12130/2014 Page 2 of 2 Community Development and Cityof Neighborhood Services Fort 281 North College Avenue Collins PO Box 580 Fort Collins, CO 80522 970.221.6760 970.224.6134 - fax fcgov. com/developmentreview January 09, 2015 Becky Siskowski Centerline Solutions for Verizon Wireless 25671 County Road 151/2 Johnstown, CO 80534 RE: Verizon Wireless FTC Collindale Golf Course, PDP140021, Round Number 1 Please see the following summary of comments from City staff and outside reviewing agencies for your submittal of the above referenced project. If you have questions about any comments, you may contact the individual commenter or direct your questions through the Project Planner, Noah Beals, at 970-416-2313 or nbeals@fcgov.com. Comment Summary: Department: Planning Services Contact: Noah Beals, 970.416.2313, nbealsbD7.fcaov.com Topic: General Comment Number: 1 Comment Originated: 12/29/2014 12/29/2014: Can the applicant please provide a response to the comments and questions that were received during the neighborhood meeting? Comment Number: 2 Comment Originated: 12129/2014 12/29/2014: Can the monopine be designed to appear fuller and less symmetrical and more organic? Comment Number: 3 Comment Originated: 12/29/2014 12/29/2014: Is the fence area the extent of the leased area? Please show the landscaping for the entire leased area. Department: Engineering Development Review Contact: Sheri Langenberger, 970-221-6573, slanpenbercer(a).fcgov.com Topic: General Comment Number: 1 Comment Originated: 12129/2014 12129/2014: No Comments. If Utility plans/ grading plans are provided then Engineering will need to review and sign those plan sheets. Department: Light And Power Contact: Jim Spaulding, 970.416.2772, jspauldingftfcaov.com Topic: General Page 1 of 2