Loading...
HomeMy WebLinkAboutCENTERPOINT PLAZA BUILDING A - MAJOR AMENDMENT - 35-01B - CORRESPONDENCE -Number: 4 Created: 1/25/2005 [1/25/05] Please add a Plant Note regarding installation of landscaping prior to issuance of a CO. See section 3.2.1(I)(4) for wording This completes staff (and outside reviewing agencies) review and comments at this time. Some red -lined plans from City departments are included with this comment letter. Additional comments and red -lined plans may be forthcoming. Another round of staff review may be necessary. This proposal is subject to the 90-day revision re - submittal requirement (from the date of this comment letter, being February 10, 2005) as set forth in Section 2.2.11(A) of the Land Use Code. Be sure and return all of your red -lined plans when you re -submit. The number of copies of each document to re -submit is shown -on the attached Revisions Routing Sheet If you have any questions regarding these issues or any other issues related to this project, please feel free to call me at 221-6341. Yougrsp Truly, Steve Olt City Planner Page 3 Number: 9 Created: 2/2/2005 [2/2/05] The building is extending beyond the shown building envelope. The building envelope was not shown on the plat, so just revise the building envelope to go out side of the structure. Just be aware that the building envelope can not extend into the easements. Number: 10 Created: 2/2/2005 [2/2/05] Now appear to be showing retaining walls at the south end of the building. If you are we need to see if and how this impacts the grading plans and the temporary pond. Department: Stormwater Utility Topic: Stomnwoter Number: 11 [2/3/05] No comments. Department: Transportation Planning Topic: 6eWJVi Number: 6 [2/1/05] No comments Department: Water Wastewater Topic: 6eneml Number: 5 [1/31/05] No comments Department: Zoning Issue Contact: Wes lamarque Created:2/3/2005 Issue Contact: David Averill Created:2/1/2005 Issue Contact: Jeff Hill Created:1/31/2005 Issue Contact: Jenny Nuckols Topic: Zoning Number: 1 Created; 1/25/2005 [1/25/05] Handicap space needs to be an overall width of 16 ft. and signed as van accessible. Number:2 Created: 1/25/2005 [1/25/05] The building envelope needs to encompass the entire building. The north and south stair structures are not shown within the envelope, nor is the patio area. Please revise. Number: 3 Created: 1/25/2005 [1/25/05] Buildings over 40' in height require a shadow analysis. Page 2 STAFF PROJECT REVIEW Eastpoint Studio LLC Date: 02/10/2005 c/o Don Brookshire 141 South College Avenue, Suite 103 Fort Collins, CO.80524 Staff has reviewed your submittal for CENTERPOINT PLAZA, BUILDING A, MAJOR AMENDMENT - TYPE I, and we offer the following comments: Department: Current Planning Issue Contact: Steve Olt Topic: Building Elevations Number: 12 Created: 2/10/2005 [2/10/05] The building is proposed to be over 40' in height; therefore, need the required documentation submitted for a Building Height Review, per Section 3.5.1(6)(1)(b) of the Land Use Code. Topic: Landscape Plan Number: 13 Created: 2/10/2005 (2/10/05) Landscape comments are on the red -lined Landscape Plan. Topic: Site Plan Number: 14 Created: 2/10/2005 [2/10/05] See red -lined Site Plan for comments. Department: Engineering Issue Contact: Sheri Wamhoff Topic: 6WWM1 Number: 7 Created: 2/2/2005 [2/2/05] No footings or overhangs (eaves) can extend into the easements. This appears to be occurring on the north side and west side of the building. We can also look into an easement vacation along Timberline if you would like for the area where the building overhang is proposed. Number: 8 Created: 2/2/2005 [2/2/05] Need to show the easements - drainage etc. on these plans. Need to be able to verify that the larger building does not extend into the easements. Page 1