HomeMy WebLinkAboutCENTERPOINT PLAZA BUILDING A - MAJOR AMENDMENT - 35-01B - CORRESPONDENCE -Number: 4 Created: 1/25/2005
[1/25/05] Please add a Plant Note regarding installation of landscaping prior to
issuance of a CO. See section 3.2.1(I)(4) for wording
This completes staff (and outside reviewing agencies) review and comments at this
time. Some red -lined plans from City departments are included with this comment
letter. Additional comments and red -lined plans may be forthcoming. Another round of
staff review may be necessary. This proposal is subject to the 90-day revision re -
submittal requirement (from the date of this comment letter, being February 10,
2005) as set forth in Section 2.2.11(A) of the Land Use Code. Be sure and return
all of your red -lined plans when you re -submit. The number of copies of each document
to re -submit is shown -on the attached Revisions Routing Sheet
If you have any questions regarding these issues or any other issues related to this
project, please feel free to call me at 221-6341.
Yougrsp Truly,
Steve Olt
City Planner
Page 3
Number: 9 Created: 2/2/2005
[2/2/05] The building is extending beyond the shown building envelope. The building
envelope was not shown on the plat, so just revise the building envelope to go out side
of the structure. Just be aware that the building envelope can not extend into the
easements.
Number: 10 Created: 2/2/2005
[2/2/05] Now appear to be showing retaining walls at the south end of the building. If
you are we need to see if and how this impacts the grading plans and the temporary
pond.
Department: Stormwater Utility
Topic: Stomnwoter
Number: 11
[2/3/05] No comments.
Department: Transportation Planning
Topic: 6eWJVi
Number: 6
[2/1/05] No comments
Department: Water Wastewater
Topic: 6eneml
Number: 5
[1/31/05] No comments
Department: Zoning
Issue Contact: Wes lamarque
Created:2/3/2005
Issue Contact: David Averill
Created:2/1/2005
Issue Contact: Jeff Hill
Created:1/31/2005
Issue Contact: Jenny Nuckols
Topic: Zoning
Number: 1 Created; 1/25/2005
[1/25/05] Handicap space needs to be an overall width of 16 ft. and signed as van
accessible.
Number:2 Created: 1/25/2005
[1/25/05] The building envelope needs to encompass the entire building. The north
and south stair structures are not shown within the envelope, nor is the patio area.
Please revise.
Number: 3 Created: 1/25/2005
[1/25/05] Buildings over 40' in height require a shadow analysis.
Page 2
STAFF PROJECT REVIEW
Eastpoint Studio LLC Date: 02/10/2005
c/o Don Brookshire
141 South College Avenue, Suite 103
Fort Collins, CO.80524
Staff has reviewed your submittal for CENTERPOINT PLAZA, BUILDING A,
MAJOR AMENDMENT - TYPE I, and we offer the following comments:
Department: Current Planning Issue Contact: Steve Olt
Topic: Building Elevations
Number: 12 Created: 2/10/2005
[2/10/05] The building is proposed to be over 40' in height; therefore, need the
required documentation submitted for a Building Height Review, per Section
3.5.1(6)(1)(b) of the Land Use Code.
Topic: Landscape Plan
Number: 13 Created: 2/10/2005
(2/10/05) Landscape comments are on the red -lined Landscape Plan.
Topic: Site Plan
Number: 14 Created: 2/10/2005
[2/10/05] See red -lined Site Plan for comments.
Department: Engineering Issue Contact: Sheri Wamhoff
Topic: 6WWM1
Number: 7 Created: 2/2/2005
[2/2/05] No footings or overhangs (eaves) can extend into the easements. This
appears to be occurring on the north side and west side of the building. We can also
look into an easement vacation along Timberline if you would like for the area where
the building overhang is proposed.
Number: 8 Created: 2/2/2005
[2/2/05] Need to show the easements - drainage etc. on these plans. Need to be able
to verify that the larger building does not extend into the easements.