HomeMy WebLinkAboutCENTERPOINT PLAZA BUILDING A - MAJOR AMENDMENT - 35-01B - SUBMITTAL DOCUMENTS - ROUND 2 - ROUTING SHEETProject: Date:
Planner: Traffic Operations: Engineer:
Items Requested
Redlinedems Being Returned
p;
a
a
fu
j
v
c
.�
Other Items Required
;;
Ln
a
a
3
c
_
v
Other Items being
Returned
Engineering
Engineering Pvmt.
Light & Power
`
PFA
`cam
Stormwater
Technical Services
Traffic Operations
Transfort
Transportation Planning
Water/Wastewater/FCLWD
TOTALS (This Side)
Add to reverse side
Other:
y,•
Note: All redlined items should be returned with the resubmittal/revisions.
Please call 221-6750 to schedule a resubmittal
�r�r��ir�Frrtnnf
REVISION ROUTING SHEET I C-.eoL%A Z.
ITEM :
MOM
T-
i
DATE RECEIVED:
H
a
°
w
a
z
z
a
as
z
az
Zz
e m.
F
Z
oy
a
FILE: PROJECT PLANNER
ADVANCE PLANNING
BUILDING INSPECTION
CDOT
COMCAST
DITCH COMPANY
FORESTRY
NATURAL RESOURCES
PARK PLANNING
POLICE - JOE GERDOM
POST OFFICE
W EST
R.O.W. PLANNING
RAILROAD: UP or BNSF
REA/DOE/PRPA
SCHOOLS: POUDRE / THOMPSON
STREETS
WATER CONSERVATION
XCELENERGY
ZONING
TOTAL THIS SIDE
TOTAL OTHER SIDE
TOTAL BOTH SIDES