HomeMy WebLinkAboutBENNETT ROAD BUNGALOWS - PDP - 42-01 - SUBMITTAL DOCUMENTS - ROUND 2 - ROUTING SHEETProject: FcnyitR RCY d $unocd oyg5 . 2j/. O
Date:
Planner: rev{ (> I+ Traffic Operations: Engineer: I r..�,e /U Dore_
Items Requested
Redlined Items Being Returned
m
J
fO
a
�
v
y
°
0
Other Items Required
°y-'
�'
a
v
C "
0
Other Items being
Returned
Engineering
X
x
Ins+
Stormwater
X
Water/Wastewater
a
Traffic Operations
I
Transportation Plannin
/ c
Cbi<hMev�S
Transfort
u ccr�n�u,cP-
Natural Resources
Park Planning
TOTALS
Other:
Note: All redlined items should be returned with the resubmittal/re
/46f,
visions.
REVISION ROUTING SHEET-- 9-
ENGINEERING PAVEMENT
•
MiiiimiimmiLIGHT
i
& POWER
TECHNICALiQriii�ii��ii
• •
iliii�i�ii��ii
ADVANCE PLANNING
R.O.W. PLANNING
WATER CONSERVATION
POST OFFICE
'_�iii�ii��ii
alkavi
PUBLIC SERVICEAT
& T DIGITAL CABLE
..
DITCH COMPANY
RAILROAD: UP or BNSF
------------
------------