Loading...
HomeMy WebLinkAboutLIBERTY COMMON SCHOOL ADDITION - SITE PLAN ADVISORY REVIEW - 11-02 - CORRESPONDENCE -Department: Water Wastewater Issue Contact: Jeff Hill Topic: General 7 As previously indicated, will an increase in service sizes be required for this additional building area? 8 Include the standard general notes pertaining to landscape/utility separation distances and locates on the landscape plans. Department: Zoning Issue Contact: Jenny Nuckols Topic: General 1 Please add additional street trees along Sharp Point Dr 2 Please provide foundation plantings around the new addition 3 On the elevations, show maximum building height Red -lined drawings are available at the Current Planning front desk. This item is scheduled for the April 4, 2002 Planning and Zoning Board Hearing for consideration. If you would like to meet and discuss the comments, please let me know. If you have any questions regarding these issues or any other issues related to this project, please feel free to call me at (970) 221-6750. Yours Truly, Bob Barkeen City Planner Page 3 Department: PFA Topic: General 6 Addition will be required to be fire sprinklered. Issue Contact: Michael Chavez Department: Police Issue Contact: Joseph Gerdom Topic: General 9 Lighting: Location not clear from plan - appears additional light would be advisable in NW area of addition. Department: Right of Way Topic: General 4 No comments. Issue Contact: Ron Mills Department: Stormwater Utility Issue Contact: Basil Hamdan Topic: Easements 21 Please provide a drainage easement for the area covered by the proposed detention pond. Topic: Erosion Control 19 a). Please provide PS, EFF, surety calculations, and project schedule. b). Erosion control plan must have standard erosion control notes. Topic: General 18 Please provide a standard set of utility plans with the appropriate cover sheet, utility plan sheet, drainage sheet, grading and erosion control sheet as well as a detail sheet showing details for all proposed improvements. Topic: Water Quality 20 The current design projects to use a pond with a subdrain outfall to a proposed sidewalk culvert. This design is not typical, since usually we require a standard 40-hour extended detention pond. We would be willing to allow this design on an interim basis provided that a positive outfall across Sharp Point Drive and into the City's Natural Resources property is designed when an easement is obtained from Natural Resources. This would involve the construction of a new culvert under Sharp Point and into the Natural Resources property. A letter agreeing to such a design revision will be needed. Please note that the pond was designed for a 12 hour detention time which is fine for the interim porous landscape detention design provided but the standard City 40-hour extended detention will be required for the revised pond design. Department: Transportation Planning Issue Contact: Tom Reiff Topic: General 10 Identify and label event parking locations and how people will access the facility from their car. (i.e. walkways, location of gates, etc...) 11 Provide and label bike parking location. Page 2 STAFF PROJECT REVIEW City of Fort Collins THE NEENAN CO. Date: 3/18/2002 C/O JOHN B. JAMES 2620 E. PROSPECT ROAD, SUITE 100 FORT COLLINS, CO 80525 Staff has reviewed your submittal for LIBERTY COMMON SCHOOL ADDITION SITE PLAN ADVISORY REVIEW, and we offer the following comments: ISSUES: Department: Current Planning Issue Contact: Bob Barkeen Topic: General 22 Landscaping should be provided adjacent to the new building addition, particularly where the building is visible from Sharp Pointe Drive. Taller plant materials should be chosen to help break up the fapade of the addition. Additional landscaping should be provided in front of the solid wood fence to lessen the impact on the adjacent streets and sidewalks. Landscaping should also be provided adjacent to Sharp Point Drive adjacent to the existing parking lot to provide screening for this lot. Department: Engineering Issue Contact: Sheri Wamhoff Topic: General 12 The legal description reference does not reference the most current plat. The most current plat is Vipont at Prospect Park East being a replat of -Lot 8, Prospect Park East PUD, and Lots 1, 2, and a part of Lot 23, Prospect Industrial Park. 13 The connection of March Court out to Midpoint Drive is a highly desired connection and is needed in order to help the traffic congestion associated with the school use and for general circulation in the area. The problems this site experiences with the drop off and pick up of children will get worse once the parking is eliminated off of Sharp Point Drive. We would like to see the dedication of right-of-way across this property for the future extension. 14 Will need a street cut permit for the work in the row. 15 The applicant will need to dedicate easements for the detention pond and water quality area. 16 Need a set of Utility plans for approval. The Color erosion control plan is nice, but will not have the some look when printed on a mylar and reproduced. The utility plans need to have a cover sheet with General Notes and all applicable construction notes, contain a grading plan, and City signature blocks. - 17 Provide curb gutter and sidewalk detail in the plan set. Will need to repair and/or replace all damage curb gutter and walk. Department: Light & Power Issue Contact: Doug Martine Topic: Landscaping 5 Any additional street trees must be placed a minimum of 40 ft. from any streetlight. Page 1