HomeMy WebLinkAboutSEVEN OAKS ACADEMY'S LITTLE ACORNS - FDP - 48-01A - CORRESPONDENCE -Department: Zoning Issue Contact: Jenny Nuckols
Topic: General
12
Label building envelope, dimensions and footprint, covered entrys should be included.
14
Show back-up distance in new parking lot area
18
Note the distance between the new building and the existing
23
Is there a sidewalk along the private drive. Check with eng for their standards.
Be sure and return all of your redlined plans when you re -submit.
If you have any questions regarding these issues or any other issues related to this project,
please feel free to call me at (970) 221-6750.
Yours Truly,
TED SHEPARD
City Planner
Page 3
General
This facility shall comply with PFA Administrative Policy 86-13 for Day Care Facilities. Contact Ron Gonzales for
a copy.
49
FIRE PROTECTION
The building exceeds 5000 square feet, and shall be fire contained or fire sprinklered. Utility plans indicate a
fire sprinkler system is to be installed.
Topic: utility plan
43
WATER SUPPLY
A hydrant is required within 300 feet of structure and shall deliver 1500 gpm @ 20 psi.
Department: Police
Topic: Site and Landscape
50
Lighting plan not clear on illumination at entrances.
Department: Stormwater Utility
Topic: Drainage Report
75
Please provide copies of Exhibit 4A in the report.
Issue Contact: Joseph Gerdom
Issue Contact: Basil Harridan
Please submit two additional signed and stamped copies of the report for approval.
Topic: Easements
69
Please provide copies of the drainage easements that are to be dedicated by separate document for all
detention ponding areas.
Topic: Utility Plans
74
Please show a side view of the proposed outlet box, as delineated on the reclined utility plans.
Please address all comments on the reclined utility plans. Since these comments are of minor importance,
we are now ready for mylars.
Department: Transportation Planning Issue Contact: Tom Reiff
Topic: Site and Landscape
24
(Repeat comment 3-5-02) Install a 5 foot attached walkway along the eastern edge of the property parallel
to the private drive and connects to the sideway in front of the southern parking spaces (see site plan red
lines). The sidewalk is necessary to provide pedestrian connectivity internal to all uses within the center and to
provide safe access to businesses from surrounding residences.
Department: Water Wastewater Issue Contact: Jeff Hill
Topic: General
71
No Comments Ready for Mylars
Page 2
STAFF PROJECT REVIEW
City of Fort Collins
V.F. RIPLEY ASSOC. Date: 4/5/2002
CATHY MATHIS
401 W. MOUNTAIN AVE. #201
FT. COLLINS, CO 80521
Staff has reviewed your submittal for SEVEN OAKS ACADEMY'S LITLE ACORNS PDP/FC
#48-01/48-01 A, and we offer the following comments:
ISSUES:
Department: Engineering Issue Contact: Sheri Wamhoff
Topic: General
66
please submit copies of the drainage easements that need to be dedicated by separate document. These
will need to be received in final format with filing fees prior to acceptance of the mylars for signature by the
City.
72
Add to the legend on sheet 6 that the diagonally hatched areas are' areas where easements are to be
provided by separate document' or some language to that effect.
73
Sheet 4, 5, 6, 7, 9. Remove building envelope label. The plat does not define the area outside of the
easements as the building envelope. In fact there are no notes on the plat regarding the building envelope
or its boundaries.
Department: PFA Issue Contact: Ron,Gonzales
Topic: General
44
ADDRESS
The address is required to be visible from the street fronting the building, with minimum 6 inch numerals on a
contrasting background.
45
FIRE ALARM SYSTEM
A complete fire alarm system is required to be installed in accordance with NFPA 72, Fire Alarm Code.
46
KNOX BOX
A knox box key box is required to be located at the front door.
47
KITCHEN FIRE PROTECTION
A hood/duct fire protection system may be required in the kitchen
Page 1