HomeMy WebLinkAboutSEVEN OAKS ACADEMY'S LITTLE ACORNS - FDP - 48-01A - SUBMITTAL DOCUMENTS - ROUND 1 - ROUTING SHEETProject Name: �.nren D"-S 16PC)El1�Yf5 LTIZZ k'o/z&J5 File#:
4a
City of Fort Collins FINAL COMPLIANCE ROUTING SHEET
THIS PROJECT HAS BEEN SCHEDULED FOR PUBLIC HEARING ON �7�CLr�,6� �/, �' �� THE FOLLOWING TABLE LISTS
SUBMITTAL REQUIREMENTS FOR FINAL COMPLIANCE FOR THIS PROJECT.
A FINAL COMPLIANCE FEE OF $1000.00 IS REQUIRED AT THE TIME OF SUBMITTAL UNLESS OTHERWISE WAIVED OR REDUCED.
FEE WAIVER/REDUCTION APPROVAL AMOUNT DATE
*WHEN FINAL PLAT MYLARS ARE SUBMITTED, A CERTIFICATE OF TAXES DUE SHOWING A ZERO BALANCE MUST ALSO BE
SUBMITTED. THIS CAN BE OBTAINED AT LARIMER COUNTY OFFICE OF TREASURY, 200 WEST OAK STREET, FORT COLLINS, CO.
¢
F,
n
¢
Q
.a
z0
mwa
n
�a
v�
¢�
Qr�
w�cn
zwz
Qom°"
¢cL
�¢¢w
E i
.¢1
Q
¢a
z
��
cG
OQ
FILE: PROJECT PLANNER
ENGINEERING
X
7�
X
ve u
X
7f s
ZONING
Z 4-
BUILDING INSPECTION
LIGHT & POWER
TECHNICAL SERVICES
STORM WATER
WATER & WASTEWATER/FCLD
TRAFFIC OPERATIONS
TRANSPORTATION PLANNING
NATURAL RESOURCES
ADVANCE PLANNING
TOTAL
CITY PLANNER:
DATE
DEVELOPMENT REVIEW ENGINEER: �" L/�� DATE
4AI)vx a,,A : l we k ZZ, ZDaZ
Project Name: %-d HKJ ttC^0672 j LiM&- z4GofIyS - File
(Min ev'r
Cily o(Pnrt Collins APo�� FINAL COMPLIANCE ROUTING SHEET
THIS PROJECT HAS BEEN "va,cv c� FOR PUBLIC HEARING ON P'!/ftGy o7-/F a Od a THE FOLLOWING TABLE LISTS
SUBMITTAL REQUIREMENTS FOR FINAL COMPLIANCE FOR THIS PROJECT.
A FINAL COMPLIANCE FEE OF $1000.00 I5 RE ED AT PE TIME OF SUBMITTAL UNLESS OTHERWISE WAIVED OR REDUCED.
E�WAIVER EDUCTION APPROVAL AMOUNT 4V I f DATE 3• u • e Z-
*WHEN FINAL PLAT MYLARS AZE SUBMITTED, A C TIFICATE OF TAXES DUE SHOWING A ZERO BALANCE MUST ALSO BE
SUBMITTED. THIS CAN BE OBTAINED AT LARIMER COUNTY OFFICE OF TREASURY. 200 WEST OAK STRFFT FnRT rnl I TNK rn
F
U
z
a
Z
zO
�Z
��
w
<Qx
as
Q
QOw
�d
E-
a
p�
¢Q
C)
¢
z
O�
a z
F-w-
F-
�z
WH
E-,
o2
FILE: PROJECT PLANNER
x
ENGINEERING
x
X
ZONING
BUILDING INSPECTION
LIGHT & POWER
TECHNICAL SERVICES
STO RM W ATE R
)C
)C
WATER & WASTEWATER/FCLD
X
TRAFFIC OPERATIONS
TRANSPORTATION PLANNING
NATURAL RESOURCES
ADVANCE PLANNING
TOTAL
CITY PLANNER:
DEVELOPMENT REVIEW ENGINEER:
O S- 6'ek • 73 L✓R-1rf' DATE .3 --2-2 - Oa