HomeMy WebLinkAboutVIALE COLLEGIO - PDP - 1-02 - DECISION - FINDINGS, CONCLUSIONS & DECISIONViale Collegio PDP
Administrative Hearing
Findings, Conclusions, and Decision
September 12, 2002
Page 7 of 7
DECISION
The Viale Collegio Project Development Plan #1-02, is hereby approved by the
Hearing Officer without condition.
Dated this 26th day of September 2002, per authority granted by Sections
1.4.9(E) and 2.1 of the Land Use Code.
Cameron G10ss-
Current P,I'anning Director
Viale Collegio PDP
Administrative Hearing
Findings, Conclusions, and Decision
September 12, 2002
Page 6 of 7
Based on the City Traffic Operations staff testimony, the Applicant's Traffic
Memorandum and the evidence presented on the issue of traffic impacts
affecting the abutting alley and nearby intersections, the Hearing Officer is
convinced that conflicts between bicycles, pedestrians and vehicles within the
area is an existing problem which will not deteriorate in any significant manner by
the traffic generated by the Project. Traffic projections provided in the applicant's
Transportation Memorandum are based on actual traffic counts. The Hearing
Officer acknowledges and appreciates that residents have provided careful
thought in the framing of their concerns; however, the weight of evidence
presented by the Applicant and corroborated by the City staff, supports a finding
of compliance with the Transportation Level of Service Requirements
Although the Hearing Officer finds that many of the concerns raised by
opponents of the PDP are insightful and might potentially improve the
acceptance of the PDP by the neighboring landowners, the PDP must be judged
under the existing applicable regulations of the Fort Collins Land Use Code. The
regulations provide sufficient specificity to determine that the Applicant and
Owner have designed the PDP in conformance with the applicable regulations.
There is no authority for the Hearing Officer to mandate that the Applicant or
Owner exceed the minimum requirements of the Land Use Code in designing the
development.
SUMMARY OF CONCLUSIONS
A. The Viale Collegio Project Development Plan is subject to administrative review
and the requirements of the Land Use Code (LUC).
B. The Viale Collegio Project Development Plan complies with all applicable district
standards of Section 4.14 of the Land Use Code, (CC) Community Commercial
zone district.
C. The Viale Collegio Project Development Plan complies with all applicable
General Development Standards contained in Article 3 of the Land Use Code.
Viale Collegio PDP
Administrative Hearing
Findings, Conclusions, and Decision
September 12, 2002
Page 5 of 7
Solar Access, Orientation, Shading
As mentioned, public testimony indicated a concern over the perceived shading
impacts the project would have to the adjacent building and site to the south.
The Hearing Officer finds that the Project is in conformance with the solar access
standards specified in this section. At our latitude within the Northern
Hemisphere, shadows cast over the winter months project toward the north. The
existing building to the north has no windows, openings or solar collection
system, so the building would not be directly impacted by the loss of sunshine.
The building to the south would not be significantly impacted by shadows during
the majority of the year based on the sun's altitude over the horizon.
Building and Project Compatibility
Section 3.5.1 of the LUC requires that new developments be compatible with the
established character of the area. Pursuant to this section, the proposed building
includes architectural details that scale the building such that each floor matches
the elevation of that on adjacent buildings. The development is built close to the
street, virtually matching the setback of abutting buildings.
The Applicant testified at the hearing that the project is consistent with the
purpose of the CC zoning district which encourages multi -story buildings that
provide a mix of residential and nonresidential uses and where offices and
dwellings are encouraged to locate above ground -floor retail and services.
Design Standards for Mixed Use Buildings
The staff report outlines the Project's conformance with Section 3.5.3 concerning
the design of mixed -use buildings. Specifically, the proposal provides compatible
building massing, minimum wall articulation, appropriate architectural "base" and
"top" treatments, and a recessed main floor building entrance off of College
Avenue.
Transportation Level of Service Requirements
Section 3.6 of the LUC imposes standards for all modes of transportation. The
Staff Report indicates that the Project is in compliance with Section 3.6 of the
LUC.
A common issue repeatedly raised by many opponents involved adverse traffic
conditions in the area of College and Laurel, and at the alley and Laurel
intersection, and a general perceived lack of safety for bicycles and pedestrians.
The opponents specifically expressed concern about high traffic speeds along
the alley and adjacent intersections that create safety problems for all users.
Viale Collegio PDP
Administrative Hearing
Findings, Conclusions, and Decision
September 12, 2002
Page 4 of 7
3. Compliance with Article 3 of the Land Use Code — General Development
Standards
The project development plan complies with all applicable sections of Article 3 of
the LUC as explained below.
Landscaping and Tree Protection. The staff report outlines the Project's
compliance with Section 3.2.1 concerning landscaping and tree protection and
there was no evidence introduced at the hearing to contradict the Staff Report.
The City Forester has deemed one tree present on the site "significant". Loss of
this tree will be mitigated through planting of one tree on -site and one tree off -
site. Such mitigation is occurring in compliance with Section 3.2.1(I)(7).
Parking and Access. The staff report outlines the Project's compliance with
Section 3.2.2 concerning access, circulation and parking. The Applicant and City
staff testified at the hearing that the Project provides residential off-street parking
spaces exceeding the number required under the LUC.
Some area residents expressed concern that vehicles associated with the
project, both on a temporary (during construction and with on -going delivery
vehicles) and permanent basis, would park illegally in nearby private parking lots.
Also, comments were received about a perceived lack of parking for visitors to
the Project. One resident stated that the City's parking standards are inadequate
given the relative lack of available on -street parking. While these comments
about parking demand are insightful and might potentially improve acceptance of
the project by the neighborhood, the Hearing Officer has no authority to the
mandate that the Applicant provide additional off-street parking spaces beyond
that number required under the LUC.
Evidence and testimony provided by the Applicant also indicates that access to
the site from College Avenue and through the alley to the east meets applicable
standards. The driveway approach from College Avenue (a State Highway)
complies with the CDOT design standards for 20-foot curb radii. Testimony
further indicated the alley is at the platted 20 foot width, and is paved in a
continuous section at this width, except for two specific locations where power
poles encroach approximately one foot into the alley right-of-way. A neighboring
property owner testified that the alley was of inadequate width for safe
maneuvering of vehicles in and out of the Project from the alley. It appears,
based on this information, that the issue of safe vehicular access has been
adequately addressed to the satisfaction of the Hearing Officer and City staff.
Therefore, based on the evidence presented at the hearing, the Project complies
with Section 3.2.2 of the LUC.
Viale Collegio PDP
Administrative Hearing
Findings, Conclusions, and Decision
September 12, 2002
Page 2 of 7
ZONING DISTRICT: CC — Community Commercial District.
STAFF RECOMMENDATION: Approval
NOTICE OF PUBLIC HEARING: Evidence presented to the Hearing Officer established
no controversy or facts to refute that the hearing was
properly posted, legal notices mailed and notice
published.
The Hearing Officer, presiding pursuant to the Fort Collins Land Use Code, opened the
hearing at approximately 6:05 p.m. on September 12, 2002 in the City Council
Chambers at 300 La Porte Avenue, Fort Collins, Colorado.
HEARING TESTIMONY, WRITTEN COMMENTS AND OTHER EVIDENCE:
The Hearing Officer accepted during the hearing the following evidence: (1) Planning
Department Staff Report; (2) application, plans, maps and other supporting documents
submitted by the applicant and the applicant's representatives to the City of Fort Collins;
and (3) a tape recording of public testimony provided during the hearing. The LUC, the
City's Comprehensive Plan (City Plan), and the formally promulgated policies of the City
are all considered part of the evidence considered by the Hearing Officer.
The following is a list of those who attended the meeting:
From the City:
Bob Barkeen, City Planner
Ward Stanford, Traffic Engineer
Susan Joy, Development Review Engineer
From the Applicant:
Jim Hillhouse, Hillhouse Architects
Jeff Couch, Civil Engineer
From the Public:
John Mark, 719 Remington
Dr. Joseph Simpson, DDS and Ingrid Simpson, 718 S. College
Joe and Carolyn Knapp, 641 Remington
Lisa Steketee, 632 Remington
4'
Community Planning and Environmental Services
Current Planning
City of Fort Collins
CITY OF FORT COLLINS
ADMINISTRATIVE HEARING OFFICER
TYPE I ADMINISTRATIVE HEARING
FINDINGS, CONCLUSIONS AND DECISION
ADMINISTRATIVE HEARING DATE: September 12, 2002
PROJECT NAME:
CASE NUMBER:
APPLICANT:
OWNER:
HEARING OFFICER:
PROJECT DESCRIPTION:
Viale Collegio Project Development Plan
#1-02
Hillhouse Architects
C/o Jim Hillhouse
8897 Gander Valley Lane
Windsor, CO 80550
Venturpro, LLP
706 South College Avenue
Fort Collins, CO 80525
Cameron Gloss
Current Planning Director
The Applicant has submitted a Project Development Plan (referred to herein as the
"Project" or the "PDP") proposing a three-story, 29,500 sq.ft., mixed -use building located
at 706 South College Avenue, a half block south of Laurel Street. The project would
include 5,500 sq.ft. of ground floor retail area, 12,200 sq.ft. of office lease area located
on the second floor of the building and 20 one - bedroom efficiency apartment units
located on the third floor of the building. Parking would be provided by a ground -level
parking lot behind the first story and covered by the upper level office and residential
units. The parking lot will provide 33 off-street spaces, two of which will be handicap
accessible. The project would be accessed from College Avenue and the adjacent alley
to the east.
SUMMARY OF HEARING OFFICER DECISION: Approval
281 North College Avenue • P.O. Box 580 • Fort Collins, CO 80522-0580 • (970) 221-6750 = FAX (970) 416-2020
Viale Collegio PDP
Administrative Hearing
Findings, Conclusions, and Decision
September 12, 2002
Page 3 of 7
Written Comments:
None
FACTS AND FINDINGS
1. Site Context/Background Information
The surrounding zoning and land uses are as follows:
N: CC — retail, indoor recreation
S: CC — medical office/clinic
E: NCB — single family residential
W: CSU — Colorado State University
The property was annexed in 1873 as part of the City of Fort Collins Annexation.
2. Compliance with Article 4 and the CC — Community Commercial Zoning
District Standards:
The Project Development Plan complies with all applicable requirements of
Article 4 and the CC zone district. The Staff Report summarizes the PDP's
compliance with these standards and no specific evidence was presented to
contradict or otherwise refute the compliance with Article 4 or the CC District
Standards. In particular, the proposed multi -family residential, office, retail,
restaurants and other similar uses are permitted within the CC zone district
subject to an administrative review. Further the project provides two different
land use types, one of which is residential. See Section 4.14(D)(2) of the LUC.
According to the staff report, the Project is also in conformance with Section
4.14(E)(1) standards relating to building orientation, Section 4.14(E)(1)(b) that
requires a central feature or gathering place, and Section 4.14(E)(1)(c) calling for
integration of transit stops to the existing transit service.
While there was no direct testimony or evidence presented at the public hearing
to contradict the Project's compliance with these standards, the testimony of Dr.
and Mrs. Simpson (owners of property abutting to the south), identified concern
over the proposed building height.
The Hearing Officer finds that the proposed three story building with a height of
39'-11" is within the City's permitted maximum of five stories and 40 feet (not
subject to special height review). While a lower building height may be desired
by neighboring property owners, there is no basis in Article 4 of the City's LUC
upon which the Hearing Officer could require a reduction in the project's height.
1