HomeMy WebLinkAboutVIALE COLLEGIO - PDP - 1-02 - REPORTS - RECOMMENDATION/REPORT W/ATTACHMENTSViale Collegio, Project Development Plan #1-02
Type I Administrative Review
Page 5
spaces for every 1,000 sq.ft. of lease area. This would yield a
maximum of 41 spaces for the office use. General retail has a
maximum of four spaces for every 1,000 sq.ft. of floor area. This
would yield a maximum number of off-street parking spaces of 14
for the ground level commercial. Both of these uses would have
three parking spaces, well below the maximum number permitted.
3. Section 3.2.3, Solar Access, Orientation, Shading
The building immediately to the north of this site is lower than the
proposed building. The proposed building will likely cast a shadow
over a portion of the building during the winter months, however the
building to the north does not have any windows or other openings
along the southern property line which may be impacted by the loss
of sunshine.
Buildings within the Community Commercial zone district are
exempt from the shading requirements within Section 3.2.3 of the
Land Use Code.
4. Section 3.2.4, Site Lighting
A photometric plan has been submitted in conjunction with the
PDP. This plan shows compliance with both on and off -site lighting
standards within the LUC.
B. Division 3.3, Engineering Standards
Section 3.3.2, Development Improvements
Prior to the approval of the final compliance plans, a development
agreement will be drafted detailing the improvements required by
the applicant as part of the building permit process, and the timing
of installation of such improvements.
2. Section 3.3.5, Engineering Design Standards
The PDP has been reviewed pursuant to the adopted design
standards in place for water, sewer, storm drainage, electric,
walkways and streets which will serve this development.
C. Division 3.4, Environmental, Natural Area, Recreational and Cultural
Resource Protection Standards
Section 3.4.1, Natural Habitats and Features
The property is not included or adjacent to a mapped natural area
as identified on the City of Fort Collins Identification of Natural
Areas, nor does the property contain any natural wetlands or wet
meadows.
Viale Collegio, Project Development Plan #1-02
Type I Administrative Review
Page 2
and Division 2.4 — Project Development Plan located within Article 2 —
Administration; and the design standards located within Article 3 — General
Development Standards; and the standards located in Section 4.14, Community
Commercial (CC) of Article 4 — Districts.
COMMENTS:
Background
The surrounding zoning and land uses are as follows:
N: CC — retail, indoor recreation
S: CC — office, clinic
E: NCB — single family residential
W: CSU — Colorado State University
The property was annexed in 1873 as part of the City of Fort Collins Annexation.
2. Division 4.14 of the Land Use Code Community Commercial Zone District
The use of multi -family residential, office, retail, restaurants and other similar
uses are permitted within the CC zone district subject to an administrative review
(Type 1).
The PDP meets the applicable Development standards as follows:
A. Section 4.14(D)(2) Secondary Uses
All residential uses, except mixed -use dwellings in multi -story, mixed use
buildings, shall be considered secondary uses in this zone district. Viale
Collegio includes at least two different land use types, one of which is
residential, the other will be office, retail or possibly restaurant. The uses
are included within a multi -story building, three stories in height.
B. Section 4.14(E)(1)(a) Site Planning, Building Orientation
The building includes 5,500 sq.ft. of ground floor commercial area with two
entrances facing onto the adjacent public sidewalk for College Avenue.
Building entrances are provided to the parking areas, however they are
not the primary entrances.
C. Section 4.14(E)(1)(b) Site Planning, Central Feature or Gathering Place
The site plan includes gathering areas in front of the building, along the
College Avenue sidewalk. These areas include expanded patio areas,
benches, low walls and canopy trees. These areas can provide for outdoor
seating, and with additional temporary outdoor furniture, may provide
areas for outdoor eating and gathering.
Mr. Jim Hillhouse Page 3 September 18, 2001
We trust that this information will assist you in obtaining the City of Fort Collins' approval of
this proposed development. Please contact me should you need any additional assistance.
Respectfully submitted,
LSC Transportation Consultants, Inc.
d:•a�� PUe�
By: U�04 O
Dave L. Rub ., P.E.
DLR/wc ti•.• %
Enclosures: Table 1
Figures 1-3
Traffic Counts
Computer Analyses
\\Server\d\LSC\Projects\2001\011150\Report\F-PPS.wpd
Mr. Jim Hillhouse Page 2 September 18, 2001
day traffic volumes as well as weekday morning and evening peak -hour traffic volumes
expected to be generated by the proposed development. As shown in Table 1, the proposed
development is expected to generate 482 daily vehicle -trips. Of this total, 40 trips will take
place in the morning peak -hour (21 entering and 19 leaving) while in the evening peak -hour
the number of trips is expected to be 43 (16 entering and 27 leaving). Being located next to
the Colorado State University campus, some of these trips will probably not be vehicular trips.
Some of the residents of the apartments will probably walk. Therefore, what is presented here
is the worst case scenario.
It is assumed that 20 percent of the traffic visiting the proposed development will come from
the east and south, ten percent will access the site to and from the west, and the remaining
50 percent will access the site to and from the north. Figure 3 depicts the assignment of site -
generated traffic at the intersection of College Avenue and Laurel Street based on the peak -
hour traffic generation information contained in Table 1 and the distribution percentages
discussed earlier.
The specific phasing for the intersection of College Avenue and Laurels Street is being used
to conduct this assessment. The average cycle length is approximately 100 seconds with 25
seconds devoted to Laurel Street and 75 seconds devoted to College Avenue. All approaches
have a protected phase; however, during the field inspection, it did not appear that the arrow
was working for Laurel Street. Northbound and southbound traffic on College Avenue begins
the cycle. This runs for 45 seconds. The next phase lasts for 20 seconds and is devoted to
only northbound traffic. The last phase for traffic on College Avenue is for southbound left -
turning traffic and it lasts for ten seconds only if there is a vehicle in the turn lane. The
remaining 25 seconds of the total cycle is devoted to traffic on Laurel Street. None of this
phase is allocated to left turning traffic.
Based on this information, the morning peak -hour operates at a good Level of Service (LOS "C")
with an average vehicle delay of 22 seconds per vehicle. The evening peak -hour operates at
an acceptable Level of Service (LOS "D") with an average vehicle' delay of about 40 seconds.
When traffic from the proposed development is added to the existing background peak -hour
traffic volumes, there is no change in the Level of Service for either the morning or evening
eak-hours. The average delay increases by less than one second per vehicle.
Based on our analysis, the traffic impacts from the proposed Poudre Property Services develop-
ment are minor and can be easily accommodated by the existing roadway system.
LSC TRANSPOicTATION CONSULTANTS, INC.
1889 York Street
Denver, CO 80206
(303) 333-1105
FAX (303) 333-1107
E-mail: Isc@lscden.com
Web Site: http://www.Iscden.com
I
4C.
September 18, 2001
Mr. Jim Hillhouse
Hillhouse Architects
8899 Gander Valley Lane
Windsor, CO 80550
Re: Poudre Property Services
Fort Collins, Colorado
(LSC #011150)
Dear Mr. Hillhouse:
LSC Transportation Consultants has completed the analysis of the traffic impacts of the
proposed Poudre Property Services development located at the southeast corner of the inter-
section of College Avenue and Laurel Street in the City of Fort Collins, Colorado. The site
already has a building located on it. This building is going to be removed and replaced with
a 21,000 square -foot, mixed use, three-story building. Figure 1 depicts the location of the site
with respect to the surrounding roadway system.
The City of Fort Collins was contacted to determine what needed to be included in the
analysis. After discussing the proposed development with Erik Bracke, it was agreed that an
analysis of the existing signalized intersection at College Avenue and Laurel Street was all that
would be needed. The analysis would assess the performance of this intersection with and
without the traffic from the proposed development.
Existing morning and evening peak -hour traffic counts were collected at the intersection of
College Avenue and Laurel Street. The raw traffic count data is attached to this report.
Figure 2 depicts the existing traffic volumes as well as lane geometry for this signalized inter-
section.
The existing site has two ways for traffic to enter and leave it. There is a right-in/right-out
access point onto College Avenue and an access from the alley. The alley access leads to
Laurel Street which is about 100 feet to the north. No changes are proposed to these two
access points.
The proposed development, as currently envisioned, is to contain 20 apartments, 4,700 square
feet of retail development, and 12,500 square feet of general office development. Based on this
information and the trip generation rates published by the Institute of Transportation
Engineers (ITE) in Trip Generation, 1997, Table 1 displays the estimated average annual week-
—T;a►
*SW
a���
W-ro
mow. 9a.,O"
Cmma7 .7��
A3.1
0e MH M.en v�a+ +.M
OI't9T !
� u•. Ra
Ow. aev�noa
O.H 21"AT'04 _
Z
WWa� o�U
O a��
U
Dim
r
® r
A2.1
PmO�16!!A
ftofillc; o o EIAJ-W—Fo-I
m
No Text
`Jw•ro
----------
0u *Plx PL/dl
,.P
/1
LEGEND
.IY�lym a
W�IWIIYP �1Y
arr s n. rain uvm IAl1� m arM
4r �Y YY�
LAND USE SUWAARY
Libri iNDM.
YYD(LrY� Yp\V
In1 /I� IIi V.
1.�lA ICY \l�V.
.IY�lym a
W�IWIIYP �1Y
arr s n. rain uvm IAl1� m arM
4r �Y YY�
LAND USE SUWAARY
Libri iNDM.
YYD(LrY� Yp\V
In1 /I� IIi V.
1.�lA ICY \l�V.
----------------- .---------------
Z� ow
— _ _ _ _ _ — — — — — — — T — — — — _ _ _ — _ _ — —
%i0�:•a�w�r�w
•wwnsr��wswir
'wa��rw�w+r�w
tl
w@M"— am s "M"01
VIAL.CO GIO
rw.�r c�,aor•olr nAN
A 1®M(r. !M T M 6A' IM H Or IOr►A1a ILL Q lm /. elaaa G1
LIMY Or R fLLL14 aaLollAaa- YM ►aIIIM lGl/lJ! AVMs
ao> M worn raw lwtlr�lm ►RVYAo°I.bU1n aura
1r? .. )
� 1
W
Z LY
1:
• � 1
t
X4993 9
- •1
• -_-fir
4
rm Am
�
��o
E2—
°
�6'"•ii
- ,
I
I
� Smw Rem
1r
P'War I
Pr ry2
�•001
ZIP 80514
'
g;
5a 8
rwa Fort Colll
S
' ZN' 110521 w•.wr A
_ ..
v N
TI I
••
g$yy
• MOON• I�
— w -
41
tl +
it
VICINITY MAP �.
PROPOSAL SUMMARY
PP,�
SITE SIZE, I40k ISO'• 21o" SF.
- Ai. -�
C7 7.4
.40 ACRES
+
BUILDING 6E- la" SP.
g m 5
n.
..
BUILDING Iff16HT941- II'
HE16W,
o M
BUILDINS TYPE, MU® USE
�itl'c �1 DENSITY OF DMLINS UNITS, 40 UNITS fz7
44TOTAL BEDROOMS: I BEDROQL N E!'NFr*IGIES
OVERALL DENSITY. 40 D.U/A
ESTIMATED TOTAL FLOOR AREA 94,AW SP.
ESTIMATED RATIO- FLOOR AREA/LOT 6122, Ibb-1 _ g
X TIRE OF LAW UM. Ca+"ITY caM��TAI
�— SPACE AREA: O ACRES
PARKINS
AREAS 590 5.
(v_ MKINb AREA, SA09 S.F.
v PUBLIC STREET R16W OF WAY AREA. O SF. r�►a ®�
' ��,wo1 LADNAPBD A Orn AREI'Mb SP. TOTAL ea►r. ww ml a wn
I , 'ACTIVE RECREATIONAL USE' AREA O 5i, q
+ OrF STREET PARKIN&, 605T, 91 SPALES, ALL FULL SIZE C I
.. ••- RAWWAPPED- 2 SPAT%
BICYOL6 2 RACKS- SS WACEb
i.._.... _ MOTORCYC ll 5 SPACES
V
T �J��IL�p', ,,/I1�Iy, /�/f�/■ 7,,II�.`/Il�/'/1
V IALE LLEGI1J
W
�••
Evo
ella?Me.O01I 11aCR ncelllr eefre f0l•NR«R LAQ
y
rsn • 01 __
�
1.`
!.f
•
Z1 i ✓ M .� J' .�
.� �.
oo� /
:�
•tlY. Ems. T.II�W
f l
e Snow Rem
Prwnyf
4
Awe,SFi ! wrrry3
•e�«``o,
,„ '
�f� .„., Fort Col l i
a
DIRECTOR OF PLANNING
_ ZIP xos=I
rn
.rrnavI Ir M..ln.n ap iannm e.rm. cln.r Pon aim.. c.:.na..
iM1l.
'rX- _ ex.P M
IOW
oln.n,.rel. mn•
Forl Culln
•• �.� .Mn. � ._ Oownlow
.~
y a
d
wpoeo on Ir00N•I y
OWNER'S CERTIFICATION
':eIw,rr,llldooe +•• -� T
n.l p.yry.l.ns.. 1.•«.x. N.n.n. e. n.n.r a✓a«w•w. w..pw.
..nm.n. v:.nmm.n..•nm.n.wwrnn.
, ,`w �_
•�� .d9{ ' -- --
�n.,,n o... LL '
�
e d
.,.you n a e +wLr 3• ~
e
VICINITY MAP .,
PROPOSAL SUMMARY
` "°
o $
',,or
917E SIZE: 140Sr 150'• 21p00 SF.
CS
.4D ALINES
dJILDIN6 cOvERASE: I6015 S.F.
IIULDINS NEWT
Yq
M1.•ry rllnu.
IBULDINS Tyre,
(DENSITY OF DMIELLINS UNITS, 4M LN XW 5
0
.7U U
TOTAL BEDROOMS: I BEDROOM, IS CFFIcICNGCS
OVERALL DENSITY: 40 DUJA.
g
...n..
ESTIMATED TOTAL FLOOR AREA: SMA50 S.P.
ESTIMATED RATIO- FLOOR ARFMOT SIZE: Ized
NATURE OF LAND M, WM*MI MTY COMMERCIAL
OPEN 51"ACE ARIA, 0 AUMS
rn. c.nnn.nn e.ml'..
DRIVEMAY AREA. boll SF.
PARKINS AREA: 5W5 5.11.
PLOLIG STREET RISNT OF MAY AREA O 5F.
®®0
LANDSCAPG7 AREA 1TS6 5F. TOTAL naeo ea.rw erin arwe
ACTNE RECREATIONAL LEE, AREA O SF.
aFF STREET PARKINS: & TI 51 5PACM, ALL MAL SIM
C 1
NANDICMI'M 2 SPACES
BICYCLE: 2 RAGCS• 55 5PACES
MOTORCYCLE: 5 SPACES
Viale Collegloo
College Avenue Elevation
ITT117 F
I A
m Street
MOM
RaW
No Text
Viale Collegio, Project Development Plan #1-02
Type I Administrative Review
Page 7
3. Section 3.6.6, Emergency Access
This project will allow for adequate emergency access to the
building within the site. All of the building walls are within 150 feet
of a public street.
F. Division 3.7, Compact Urban Growth Standards
Section 3.7.2, Contiguity
The overall site is 100 percent contiguous to existing urban
development.
2. Section 3.7.3, Adequate Public Facilities
The provision of adequate public facilities for transportation, water,
wastewater, storm drainage, fire and emergency services, and
electrical power will be in place prior to the issuance of a building
permit, or adequate security posted for any such improvement not
in place prior to the issuance of a building permit.
4. Neighborhood Information Meeting
Due to the limited size and scale of the proposed PDP, a neighborhood meeting
was not held for this application.
FINDINGS OF FACT/CONCLUSIONS
After reviewing the Viale Collegio Project Development Plan #1-02, staff makes the
following findings of fact and conclusions:
1. The proposed land uses are permitted in the Community Commercial zone
district.
2. The Project Development Plan complies with all applicable district standards
of Section 4.14 of the Land Use Code, Community Commercial zone district.
3. The Project Development Plan complies with all applicable General
Development Standards contained in Article 3 of the Land Use Code.
RECOMMENDATION:
Staff recommends approval of the Viale Collegio Project Development Plan, #1-02.
Viale Collegio, Project Development Plan #1-02
Type I Administrative Review
Page 6
Storm run-off from the site will follow historic quantity and patterns
before entering into public storm drainage system.
D. Division 3.5, Building Standards
Section 3.5.1, Building and Project Compatibility
The, project is adjacent to existing commercial buildings, to the
north and south of the site. The building to the north is two stories
in height, while the building to the south is a single story building.
The proposed building includes architectural details that scale the
building down so each floor matches the adjacent building. The
buildings will have a similar setback, built up to the front property
line. The building is less than 40 feet in height, and is not subject to
the special height review modifications. The PDP is not proposing
any outdoor storage or loading areas, all trash collection areas are
greater than 20 feet from public transportation facilities.
2. Section 3.5.3, Mixed Use, Institutional and Commercial Buildings
The building mass is divided into smaller elements, both
horizontally and vertically. Awnings, overhangs, material changes,
windows and balconies will add to the architectural character of the
building. The proposed building includes base and top treatments
and recessed main -floor building entrances off of College Avenue.
Primary entrance to the building is provided from the College
Avenue sidewalk, without crossing a vehicle path or parking area.
The building has an established "build to line", which aligns with the
adjacent buildings on either side of the site.
E. Division 3.6, Transportation and Circulation
1. Section 3.6.1, Master Street Plan
This PDP is in substantial compliance with the City of Fort Collins
Streets Master Plan.
2. Section 3.6.4, Transportation Level of Service Requirements
A traffic memorandum was completed to document the traffic
impact within the immediate vicinity, focusing on the intersection of
College Avenue and Laurel Street. The analysis found that College
Avenue and Laurel Street intersections would operate at morning
peak hour of a level of service "C", and evening peak hour at a level
of service "D". This is no change to the current level of service
standards. The daily increases would be less than one second per
vehicle at this intersection.
Viale Collegio, Project Development Plan #1-02
Type I Administrative Review
Page 4
The parking lot is located at the ground level, behind the first level
retail and will be covered by the second story office, and will act
much like a parking structure. A low screen wall will be provided
along College Avenue for the portion of the parking that is visible
from the public right-of-way Shrubs will be planted along the
southern portion of the lot adjacent to the property to the south. The
parking lot is not visible from the north, the adjacent building runs
the length of the lot.
All new landscape elements will follow utility separation
requirements and street light separation. The existing landscaping
provides adequate separation from public utilities and street lighting
as well.
The access from College Avenue is one-way entering the site. Site
distance for traffic is limited to visibility of pedestrians on the
sidewalk while cars are turning into the site. The access onto the
rear alley does not require sight distance to be measured. A
minimum three foot setback is required for all structures off of the
alley.
2. Section 3.2.2, Access, Circulation and Parking
Walkways within the site are aligned to take direct access from the
adjacent public sidewalk and parking areas to the entrances of
buildings. Parking areas have been separated from pedestrian
sidewalks to avoid conflicts. Bicycle parking will be provided
adjacent to the sidewalk along College Avenue.
The parking lot is similar to a parking structure. The lot is enclosed
on two sides by buildings, and covered by the second floor above.
The lot includes 31 regular spaces, two van -accessible handicap
spaces and additional five motorcycle spaces. The lot can be
access from either College Avenue, or from the alley along the rear
of the site. All off-street parking areas will be located within the
property served by the parking. Parking areas will be paved and
striped in conformance with City standards.
The proposed building includes 20 — one -bedroom units with
commercial and office space. The City of Fort Collins Land Use
Code requires a minimum of 1.5 spaces for each one -bedroom unit
within a multi family project. This will yield 30 spaces for the
residential component of this project. Parking for commercial and
office uses are based on a maximum number of sites, rather than a
minimum number. The maximum number of spaces for office is 3
Viale Collegio, Project Development Plan #1-02
Type I Administrative Review
Page 3
D. Section 4.14(E)(1)(c) Site Planning, Integration of Transit Stops
This site is directly accessible and visible from existing transit services
provided along South College Avenue and East Laurel Street. These
stops will remain upon the development of this project.
E. Section 4.14(E)(2)(c) Block Requirements, Building Height
The existing building is less than 20 feet in height, and is non -compliant
with the current zoning. The proposed building is three stories in height,
with a maximum height of just under 40 feet.
3. Article 3 of the Land Use Code — General Development Standards
The Project Development Plan complies with all applicable General Development
Standards as follows:
A. Division 3.2, Site Planning and Design Standards
1. Section 3.2.1, Landscaping and Tree Protection
Landscaping will be provided within the front of the building
adjacent to College Avenue and a planting bed along the southern
portion of the site. The landscape plan provides a variety of canopy
trees, ornamental trees, shrubs and ground covers. The landscape
plan has been designed to use plants to enhance the public spaces
of the building and public sidewalk. All plant materials are of
adequate size and diversity as required by this section.
Canopy street trees and ornamental street trees already exist along
College Avenue. These trees include two - 40" and one - 12" caliper
elm trees and two medium size crabapple trees. All of these trees
will remain, One additional crabapple tree will be planted within the
tree lawn.
There are several existing trees on the lot. Approximately three
trees would be removed as part of the development of this site.
One of these trees, a walnut tree, is considered to have significant
community value, as determined by the City Forester, and will need
to be mitigated. Since the remaining areas to be landscaped are
not large enough to accommodate additional trees, this tree will be
mitigated off -site, within a 1/4 mile. The remaining two trees do not
require mitigation.
The landscape plan has been reviewed with the City of Fort Collins
Water Conservation standards a found to comply with those
regulations.
ITEM NO.
MEETING DATE Z BZ
STAFFTpbd{/�C�h
Citv of Fort Collins HEARING OFFICER
STAFF REPORT
PROJECT: Viale Collegio,
Project Development Plan - #1-02
[Type I Administrative Review]
APPLICANT: Hillhouse Architects
C/o Jim Hillhouse
8897 Gander Valley Lane
Windsor, CO 80550
OWNER: Venturpro, LLP
706 South College Avenue
Fort Collins, CO 80525
PROJECT DESCRIPTION:
Viale Collegio is a project development plan for a three-story, 39,500 sq.ft., mixed -use
building located at 706 South College Avenue, a half block south of Laurel Street. The
project would include 5,500 sq.ft. of ground floor retail area, 12,200 sq.ft. of office lease
area located on the second floor of the building and 20 one - bedroom efficiency
apartment units located on the third floor of the building. Parking would be provided by a
ground -level parking lot behind the first story and covered by the upper level office and
residential units This parking lot will provide 33 off-street spaces, two of which will be
handicap accessible. The site would be accessed from College Avenue and the
adjacent alley to the east.
The property is currently developed with a two-story mutli-family residential building and
a former bank with four drive through lanes. This is the current office for Poudre
Property Management. The property is zoned CC — Community Commercial District.
RECOMMENDATION: Approval
EXECUTIVE SUMMARY:
This project has been reviewed in accordance with the applicable requirements of the
Land Use Code (LUC) and was found to be in substantial compliance with the following:
The process located in Division 2.1 — General Procedural Requirements, Division
2.2 — Common Development Review Procedures for Development Applications,
COMMUNITY PLANNING AND ENVIRONMENTAL SERVICES 281 N. College Ave. P.O. Box 580 Fort Collins, CO 80522-0580 (970) 221-6750
PLANNING DEPARTMENT