Loading...
HomeMy WebLinkAboutB.U.H. SUBDIVISION (651 WHEDBEE & 420 E. LAUREL) REPLAT - PDP/FDP - 8-02 - CORRESPONDENCE -so no "development' changes are proposed. The only problem I see is that the name of the plat on the submitted sheet needs to reflect that this is a replat of part of lot 1, Block 156. This item may be scheduled for an administrative hearing. A tentative date has been set for April 18, 2002. A revised plat will need to be submitted prior to this hearing. Be sure and return all of your redlined plans when you re -submit. If you have any questions regarding these issues or any other issues related to this project, please feel free to call me at (970) 221-6750. Yours Truly, Bob Barkeen City Planner Page 2 �STAFF PROJECT REVIEW City of Fort Collins JOSEPH MACK Date: 4/3/2002 420 EAST LAUREL FORT COLLINS, CO 80524 Staff has reviewed your submittal for 651 WHEDBEE & 420 EAST LAUREL REPLAT, and we offer the following comments: ISSUES: Department: Engineering Issue Contact: Dave Stringer Topic: General 3 This needs to be titled A" Replat of Show existing and proposed easements 4 At time of building construction the City will require a Development Agreement and Utility Plans showing any required improvements such as alley improvements if required, service line connections and etc. Department: Natural Resources Topic: General 8 No issues at this time. Issue Contact: Doug Moore Department: PFA Issue Contact: Michael Chavez Topic: General 7 Prior to any construction on either of these lots a detailed site plan must be submitted to Poudre Fire Authority for our review. Department: Police Topic: General 9 No comment. Issue Contact: Joseph Gerdom Department: Stormwater Utility Issue Contact: Wes Lamarque Topic: Stormwater Utility 5 If construction is to take place on the lots, then at time of building permit the City will require grading and drainage plans and a drainage report. An erosion control plan is needed as well. Department: Water Wastewater Issue Contact: Jeff Hill Topic: General 6 Field locate and provide a utility easement for the existing sanitary sewer service which serves lot 2. A utility plan will be required for any new construction which occurs on the proposed lot 1. Department: Zoning Issue Contact: Peter Barnes Topic: Zoning 1 A variance was granted by the ZBA on 12-13-01 to reduce the required lot area from 5000 sf to 4295 sq. ft. for the proposed Lot 2, in order to facilitate this proposed replat. A home already exists on each proposed lot, Page 1