Loading...
HomeMy WebLinkAboutIMPORT AUTO SALES, TOWING & STORAGE - PDP - 15-02B - CORRESPONDENCE - (3)I ' , V Be sure and return all of your redlined plans when you re -submit. Once we have met about the fence and you have paid the fees for the dedications of right- of-way and easements, I will be ready to schedule your administrative hearing. If you have any questions regarding these issues or any other issues related to this project, please feel free to call me at (970) 221-6206. Sincerely, Anne H. Aspe City Planner Page 3 e Number: 6 Created: 10/30/2007 [10/30/07] Please show any existing driveway curb cuts on the west side of Red Cedar to verify that minimum standard driveway spacing will work. Submit a variance request for any spacing less than 50 feet CL to CL. List on Note 48 of the General Notes if a variance is requested. Number: 7 Created: 10/30/2007 [10/30/07] Please show and label a type II barricade at the new sidewalk terminus on the south end. Number: 8 Created: 10/30/2007 [10/30/07] The drainage outfall to Conifer street should be through a standard LCUASS or Stormwater approved curb chase drain. Since there is existing C&G on Conifer, a standard chase drain can be constructed in the ultimate location for future sidewalk. Please show and call out on the plans with adequate spot elevations. Add the appropriate detail on sheet 4. Number: 9 Created: 10/30/2007 [10/30/07] See redlines for any other minor comments related to drafting or labeling as well as easement dedication options. We will need either a signed deed of dedication or letter of intent from the owner of Lot 9 prior to scheduling a hearing. All other plan related issues can be resolved with Final Compliance. Department: PFA Issue Contact: Carle Dann Topic: Fire Number: 10 Created: 11 /5/2007 [11/5/07] ACCESS: Will the gate be locked during non -business hours? If so, we will need to determine how emergency access through the gate will be provided. Please contact me so we can determine this. Department: Zoning Issue Contact: Jenny Nuckols Topic: Zoning Number: 1 Created: 10/18/2007 [10/18/07] No comments Department: Stormwater-Water-Wastewater Issue Contact: Wes Lamarque Topic: Stormwater Number: 12 Created: 11 /7/2007 [11/7/07] The detention being proposed is about 20% less than the required volume calculated in our office. Please revise calculations and provide the additional volume in the proposed detention pond. Number: 13 Created: 11 /7/2007 [11/7/07] A drainage easement is required for the limits of the detention pond and the outfall swale south to the existing right-of-way. Number: 14 Created: 11 /7/2007 [11/7/07] Please show the floodplain boundary on the drainage and grading plans. Number: 15 Created: 11 /7/2007 [11/7/07] Additional comments may follow during final compliance. Page 2 STAFF PROJECT REVIEW City of Fort Collins Jerry Robinson Date: 11/7/2007 Stewart & Associates 103 South Meldrum Street Fort Collins, CO 80521 Staff has reviewed your submittal for IMPORT AUTO SALES, TOWING & STORAGE PDP - TYPE I, and we offer the following comments: ISSUES: Department: Current Planning Issue Contact: Anne Aspen Topic: General Number: 11 Created: 11 /7/2007 [11/7/07] 1 have concerns about the height, materials and design of the fence. I understand the owner wants to screen the vehicles from the neighbors and avoid complaints. I'd like for you and me to meet briefly with Gary Lopez to discuss ways to accomplish the screening without generating complaints on the fence! Ideas that I have to explore before the meeting include lowering the fence to 8 feet, using a more decorative partly open panel for the top section, and/or setting the fence back from the property line and adding landscaping to buffer. Please contact me to arrange this meeting. Department: Engineering Issue Contact: Randy Maizland Topic: Engineering Number: 2 Created: 10/30/2007 [10/30/07] Deeds of dedication: ROW and easement deeds of dedication were submitted without review fee payment. I have done a preliminary check of the easement documents however, the legal descriptions will not be reviewed by our survey division until all fees have been paid. The following dedications are needed for this project: 3 foot ROW dedication (submitted), 9 foot Utility Easement behind the ROW (nothing submitted), on -site Drainage Easement for the detention pond (nothing submitted), and an off -site Drainage & Utility Easement (submitted). To cut down on fees, you may combine the on -site & off -site easement into one document if you wish since they are connected and can be described in one legal description. Please submit 3 or 4 revised easement documents for review with the appropriate review fees and County recording fees. Please see the red -line Check Prints and Utility Plan comments attached for clarification. Number: 3 Created: 10/30/2007 [10/30/07] Site Plan - Please show all existing and proposed easements (on & off -site) on the Site Plan drawing. Number: 4 Created: 10/30/2007 [10/30/07] Please show and label all existing and proposed easements by separate document on the Utility Plan set, see redlines for clarification. Number: 5 Created: 10/30/2007 [10/30/07] Call out the new driveway and H.C. ramps with the LCUASS standard. Please add the H.C. ramp standard to the Details on sheet 4. Page 1