HomeMy WebLinkAboutPOUDRE FIRE AUTHORITY STATION #14 - FDP - 14-02A - SUBMITTAL DOCUMENTS - ROUND 1 - REVISIONSg urban design, inc. The trash enclosure must be of similar materials as the building. 3.5.1(1)(2) So noted. Thank you. The trash enclosure will be of similar material as the building. Be sure and return all of your redlined plans when you re -submit. So noted. Thank you. Carter Urban Design, Inc. 6 Topic: Site Plan urban design. inc. 12 Relocate the trash enclosure to eliminate any site distance issues for cars backing out of the stalls along the 24' access easement? The trash enclosure location is a product of the need to provided screening for the required backup generator while keeping the generator within 100 feet of the point of connection to the building. The point of connection is in the northeast corner of the building. Department: Zoning Issue Contact: Peter Barnes Topic: Zoning 1 Remove monument sign "picture" from site plan. The sign code will regulate what size, material, color, etc. will be allowed. Sign "picture" has been removed from plan set. 2 Building can be setback no more than 15' from the Westchase ROW line per 3.5.3(B)(2)(a) & (b). While the lot fronts on 3 streets, the building must be built to at least 2 of the streets, and to a street corner. In other words, meeting the build -to -line requirement on Timberline and Carmichael, as they have done, does not meet the Code. Westchase needs to be one of the streets involved. A Planning and Zoning Board modification was granted on May 2, 2002 to allow the building to stay in it's proposed location. 3 Should a pedestrian walkway connection be provided to Westchase Rd. and Timberline Rd. also, in addition to the one they show to Carmichael? No pedestrian walkway connection to Westchase or Timberline roads will be provided due to the request of the Poudre Fire Authority and their concern with safety. 4 They've shown a building envelope, but they need to dimension it. The building envelope has been dimensioned. 5 They need to indicate how tall the exterior pole lights are, and also that they will be down directional, etc. The electrical engineer has provided this information. Department: Police Topic: landscaping Issue Contact: JosephGwcMFMgn, inc. 27 Lighting: Inadequate levels (below .7fc) around patio area create a potential security/safety issue. So noted. Thank you. Landscaping: Plan shows doors at SW comer of building - obscured by Austdan Pine. Suggest lower plant materials to provide visual access. So noted. Thank you. This set of doors access the lawn mower storage only Department: Stormwater Utility Issue Contact: Basil Hamdan Topic: Building floor elevation 15 The landscape plan calls for a building Finish Floor elevation of 4930, while the grading plan calls for a 4930.2 elevation, please reconcile. So noted. Thank you. The elevations have been reconciled. Topic: Erosion Control 16 Sediment/Erosion Control Comments Westchase Block 11, Lot 1 Poudre Fire Authority April 11, 2002 Plan is OK. Thank you. So noted. Thank you. Topic: Grading Plan 14 Please add a concrete pan running from the high point on the west side of the buiding to the north parking lot. Department: Transportation Planning Issue Contact: Tom Reiff Topic: landscaping 10 Are trees located in the ultimate location for a 4-lane arterial? If not relocate proposed trees to their ultimate location. The trees, sod and required irrigation within the Timberline right-of-way are being installed by Alpine Gardens. The Poudre Fire Authority is only providing landscaping and irrigation for the site and for the right-of-way of Westchase and Carmichael. 4 Com@Q o urban design, inc. Topic: Modification 32 As you know, a modification is required to section 3.5.3(B)(2)(a) to locate the building where you have requested. I have received the request, and it will be decided upon together with the whole project's approval at the May 2nd Planning and Zoning Board Hearing. So noted. Thank you. Department: Engineering Issue Contact: Susan Joy 26 Move the trees closer to the sidewalk and to their ultimate location. That way if the street widens in the future or a right hand turn lane goes in, they won't have to be relocated. The trees, sod and required irrigation within the Timberline right-of-way are being installed by Alpine Gardens. The Poudre Fire Authority is only providing I�Indscaping and irrigation for the site and for the right-of-way of Westchase and Carmichael. Department: Light & Power Topic: General 8 No issues at this time. Thank you. Issue Contact: Janet McTague 9 Transformer needs to be fed from vault on Carmichael Street So noted. Thank you. Department: Natural Resources Topic: General 7 No issues at this time. So noted. Thank you. Issue Contact: Doug Moore Department: PFA Issue Contact: Ron Gonzales Topic: Site Plan 28 Building is out of access; and shall be fire sprinkleredd. So noted. Thank you. 3 36 urban design, inc. See handwritten comment sheets from City Forestry, Fort Collins - Loveland Water District, Traffic Operations, and Excel Energy. Handwritten comments noted and addressed. 37 Please submit the requested revisions for final compliance review. See the revision routing sheet enclosed with the comments. Noted. Thank you. Topic: landscaping 33 Who installs the 4 streets along Timberline? They are shown on your landscape plan and also on the original Westchase PUD landscape plan. The trees, sod and required irrigation within the Timberline right-of-way are being installed by Alpine Gardens. The Poudre Fire Authority is only providing landscaping and irrigation for the site and for the right-of-way of Westchase and Carmichael. Topic: lighting plan 29 The lighting plan is missing some information. See the orange circled areas on the redlined lighting plan. Section 3.2.4(D)(8) of the LUC specifies that lighting cannon spill 20 feet past the property line at levels that exceed 0.1 foot candles as a result of on -site lighting. Pleasp extend spot lighting analysis to show the light readings for all areas 20 feet beyond the property lines. The lighting plan has been modified by the Electrical Engineer. 30 This is a residential neighborhood, so we want to ensure that the site is does not create a light -pollution nuisance. Judging by the light levels at the driveway cut along Carmichael Street, the on -site lighting is too bright. Please reduce the wattage or change out fixtures so that the on -site lighting doesn't have light spillage off the site. The lighting plan has been modified by the:Electrical Engineer. 31 The lighting fixtures on the poles must be down -directional cut-off fixtures in accordance with 3.2.4(D)(3) of the LUC. The lighting plan has been modified by the Electrical Engineer z May 14, 2002 Troy Jones City of Fort Collins Community Planning and Environmental Services P.O. Box 580 Fort Collins, CO 80522 urban design, inc. 3555 Stanford road, suite 105 fort collins, colorado 80525 (970) 226-4074 fax (970) 226-4196 e@cityscapeud.com RE: Poudre Fire Station No. 14 - PDP — Final Compliance Plans — Response to PDP Comments Dear Troy; Included below are the comments received from City Staff regarding the Project Development Review for this Fire Station No. 14. An explanation of how issues have been addressed follows each comment. Applicant's engineer will submit response to engineering comments. ISSUES: Department: Current Planning Issue Contact: Troy Jones Topic: General 34 Coordinate signal requirements at Westchase Road and Timberline Road with Eric Bracke. As per Eric Bracke, the signal will be coordinated at a later date between the Poudre Fire Authority and the City of Fort Collins. 35 The screening of the parking from the street sidewalk along the southern edge of the project and the pedestrian scale design in the southeast corner of the site plan are crucial in order to create pedestrian frontage along Carmichael as part of the neighborhood center. Additional screening has been provided to buffer the parking lot along the southern edge of the project. Additionally, the Poudre Fire Authority has agreed to add a public space behind the fire station to increase the human scale of the project as it relates to Carmichael Street.