HomeMy WebLinkAboutPREISS SUBDIVISION (619 WHEDBEE ST.), REPLAT - PDP - 16-02 - CORRESPONDENCE -NOTE: This pertains to lot # 101. If the furthest point of the structure exceeds 150 feet from the emergency access
roadway the structure shall be fire sprinklered.
Department: Police
Topic: General
14
no comments
Issue Contact: Joseph Gerdom
Department: Stormwater Utility Issue Contact: Wes Lamarque
Topic: Drainage
10
If any construction is to be done on Lots 101 or 100, then at building permit review a grading and drainage
plan would be required with the utility plan submittal. A drainage report would also be required.
11
Water quality measures would be required with any improvements to the lots per City of Fort Collins
requirements.
12
Since the replat is taking place currently, any future drainage easements needed for improvements to these
lots will have to be granted per separate document or another replat.
Topic: Floodplain
13
Most of Lot 101 was in the 100-year floodplain in the previous Old Town Master Draiange Basin. The floodplain
in this basin is being updated and this area will not be mapped in the floodplain due to smaller flows than our
minimum flow requirement of 200 cfs. This will allow improvements to be done on site without any floodplain
regulations, however the City advises that this property could be flooded in a substantial storm event and
recomends any structures to be elevated as much as possible and to consider other protective measures.
Department: Water Wastewater Issue Contact: Jeff Hill
Topic: Water/Sewer
2
Any construction of a habitable area on lot 101 will require submittal of a utility plan which shows the existing
water and sewer services for lot 100 as well as any proposed services for lot 101 (include all utility easements
for any services which extend across adjacent lots)
Be sure and return all of your redlined plans when you re -submit.
If you have any questions regarding these issues or any other issues related to this project,
please feel free to call me at (970) 221-6750.
Yours Truly,
Bob Barkeen
City Planner
Page 2
._ -
STAFF PROJECT REVIEW
City of Fort Collins
AYRES ASSOCIATES Date: 5/1/2002
C/O BRIAN NELSON
3665 JFK PKWY., BLDG. 2, STE. 200
FORT COLLINS, CO 80525
Staff has reviewed your submittal for 619 WHEDBEE STREET REPLAT, and we offer the
following comments:
ISSUES:
Department: Engineering Issue Contact: Dave Stringer
Topic: Plat
3
Need vicinity map, existing and proposed easements
4
What is rectangle on back of lot 101, is it existing or proposed?
5
Plat should have a name
6
What are the distance and bearings for easements a shown, how can they be located?
7
Show alley behind these lots
8
May need to provide utility plan showing how alley will be improved to serve these lots. At minimum a
variance request will need to be submitted per LCUASS for delay of alley paving
9
Change director of Engineering to City Engineer
Department: Light & Power Issue Contact: Doug Martine
Topic: Electric
1
Light & Power will need site plan for any new building on the 2nd lot. Electric Development Charges will
apply. Applicant should contact Light & Power Engineering at 221-6700.
Department: PFA Issue Contact: Michael Chavez
Topic: Plat
15
Address Numerals- Address numrals shall be visible from the street fronting the property, and posted with a
minimum of 6-inch numerals on a contrasting background. ( Bronze numerals on brown brick are not
acceptable) 97 UFC 901.4.4
16
Water Supply: No residential building can be greater then 400 feet from a fire hydrant. Each fire hydrant must be
capable of delivering 1000 gallons of water per minute at a residual pressure of 20 psi. 97 UFC 901.2.2.2
17
Page 1