HomeMy WebLinkAboutPOUDRE SCHOOL DISTRICT 2004 HIGH SCHOOL - SITE PLAN ADVISORY REVIEW - 43-01A - CORRESPONDENCE - MEETING COMMUNICATION (3)D 22.10 Scope: George: We need to resolve how much site work we are to design and build. Are we doing any of the City Park's ball field(s)? D 22.11 Grading: George: RB+B likes to keep a minimum slope of 2%. Soccer field may be a challenge; need to resolve if it will be artificial turf or not. D 22.12 Planting: Angie: We may have several different types of grasses for the fields. D 22.13 Irrigation: Pete: We need to keep the irrigation on the perimeter of the non -assigned ball fields. Also, watch the locations of wet areas and area drains (safety / usability). D 22.14 Tennis: George: Need to review the locations of the tennis courts. They are currently quite a ways from the Gym and PE. D 22.15 Webster Farm Ed: The District needs to decide what it wants to do with the Webster farm buildings. Pete: I'd like to see the barn used for the Facilities Department (storage, vehicles,... ). This would give us a central place in the south part of town. Ed: The house may be a good construction office, if its not too far from the building. D 22.16 Storm Bruce: Can we look at ways to have the water re -infiltrate the ground, rather that sending all Drainage of it directly to the pond? George: We have successfully used drywells at several schools. Tom O: We can also look at french drains, bioswales, etc. Bruce: We need to look at a detailed soils report. D 22.17 Community Mike: What does the District need to do in regards to neighbor hood presentations? Meetings Ted: Run ads in the paper announcing "Community" meetings for the Southeast area. Let's include City Parks, and have Planning there as an'invitee'. D 22.18 Mike: We need an 11 x 17 site plan for internal use. BHA to prepare by next Tuesday. D 22.19 Parking Ted: I'd like to encourage the District to find multi -uses for the parking lot(s), such as basketball, roller -hockey, etc. Take a look at what was done at the Cinemark theater. ACTION ITEMS Item I Who: I ITask: A 22.1 BHA Prepare an 11 x 17 Site Plan and get it to Mike. A 22.2 Designers: Meet next week to diagram the concept site drainage. A 22.3 All Note: The modified Conceptual Review work session has been scheduled for Monday, August 13th from 9:30 am until 12:00 PSD 2004 High School 2 Site Design Team 0 PSD New 2004 High School Meeting Minutes Site Design 7/27/01 DISCUSSION ITEMS Item I Issue I Who: IDiscussion D 22.1 Design GB: George reviewed the current site plan. We are now showing a soccer field within the running track. This puts the soccer parking to the north, entering off of Rock Creek. It is time to start getting the City's input / feedback. D 22.2 Property Ed: The District does not as of this date, have a contract with City Parks. There is discussion taking place over who will own and who will maintain the pond D 22.3 Easements Bruce: Still discussing the detention at the northeast corner of the site. There is a RB+B temporary easement in place. The City may be okay with us diverting water to the south, since it is all in the same drainage basin. BHA has a copy of TST's grading plans for Rock Creek Drive. Mike: We want to keep the grading as 'natural' as possible. This is the sustainable approach. D 22.4 Pavements Russ: Gravel Pave at the soccer/track stadium sounds great, but we need to have a surface that will allow us to pick up a lot of trash after an event. Mike: Also, Storm Drainage Department is not convinced that this surface will remain permeable over time. Pete: Perhaps we need to discuss these issues with the facilities people in Vail, where its been down for 5 years or so. D 22.5 Roadway Mike: It is the District's intention to keep this as a private drive, built to City standards. Bruce: Some radii may not meet City standards. Need to meet with Light & Power and Streets Department to discuss the road. Ted: Must have on -street bike ways, or a 10' wide bike path close by. D 22.6 Bus loop Tom C: The layout looks fine, but a few turning radii will need to be reviewed. PSD should have student / traffic load data next week. Tom O: The bus loop will need to meet City standards where it meets Rock Creek. George: We need to finalize the entrance point, so that the information can be given to TST. Also, need to give this information to Matt Delich for the traffic study. D 22.7 Neighbors / Mike: Any calls received by any consultants from neighboring / outside parties are to be Community directed to Mike. D 22.8 Northwest Ted: Label the area in the northwest corner as a "future phase". Could remain agricultural. George: Need to review how that area will be handled as far a drainage. D 22.9 City's review Ted: We will set up a special, modified Conceptual Review. Bruce: Let's get some plans in front of the departments prior to the review meeting, so that we are not starting from scratch. PSD 2004 High School 1 Site Design Team PSD New 2004 High School Meeting Minutes Meeting Number: 22 Date: July 27, 2001 [Click on "Sheet2" below for the minutes] Meeting Purpose: Site Design Review Attendees: Distribution: Ed Holder PSD Mike Spearnak PSD Russ Tichardson PSD John Little PSD Tom Chaffin PSD Jim Knauer PSD Pete Hall PSD All Attendees Bill Franzen PSD Gary Bamford PSD Submitted by: Corky Bradley, AIA Proj. Mgmt Architect Grounds Proj. Mgr. Transportation Carpentry Facilities George Brelig RB+B Corky Bradley RB+B Angela Milewski BHA Bruce Hindee BHA Ted Shepard Planning Tom Ochwat Nolte These minutes are the interpretation and recollection of RB+B Architects,lnc. Please inform the author of any additions, deletions, or corrections within 5 days or at the next regularly scheduled meeting. Corrections will be made in subsequent meeting minutes. [Click on "Sheet2" below for the minutes] 7/31/01 RB+B