Loading...
HomeMy WebLinkAboutGARTH COMMERCIAL PLAZA - FDP - 20-02C - CORRESPONDENCE -Please see other minor redlined comments on the plans. Topic: SedimenUErosion Control Number: 126 Created: 8/28/2003 t. There are notes but no BMP's shown on the plan. 2. Your report still states that " ... The foundation will be installed prior to overlot grading for erosion control." I still don't understand. Department: Water Wastewater Issue Contact: Jeff Hill Topic: Utility Plan Number: 123 Created: 8/22/2003 No comments Be sure and return all of your redlined plans when you re -submit. If you have any questions regarding these issues or any other issues related to this project, ase feel f ee to call me at (970) 221-6750. ours ruly, Tr Jo Is Cit Pla ner Page 3 Correct the overlapped label. Number: 119 Created: 8/21 /2003 The easements shown on the site plan do not match the easements shown on the utility plans. Topic: Utility Plan Number: 51 Created: 3/14/2003 Update all the old details to the new details. Provide details 701, 707, 708, 710, 1601, 1602, 1606, and the Greeley detail for the truncated domes now required for all access ramps. See attached. 6/27/3: Repeat comment but do not include the Greeley detail. The City has determined that they will use our standard detail until further notice. 8/21 /3: All details have been added to the detail sheet, however, the ped ramps on Mason are not designed in accordance with 707 and 1606. All plan sets (landscape, site, and utility) need to be revised to show the ramps correctly. Also, the transition from the sidewalk to the ramp on the south end of the property needs to be widened as shown on the redlines to allow people room to maneuver. As shown, the ramp hangs off to the side of the sidewalk, making it difficult for people to access (especially those in wheelchairs). See redlines. Number: 93 Created: 6/26/2003 Grading Sheet: Provide the statement per Appendix EA III.E. 8/21 /3: Please correct the statement to read: The top of the foundation elevations shown are the minimum elevations required for protection from the 100- year storm. Number: 98 Created: 6/26/2003 Sheet 2 - The manhole is located too close to the pedestrian access ramp in the NW corner. How will this work? 8/21 /3: Your response is acknowledged. Please provide a note stating requiring that the placement of the manhole will not interfere with either the pedestrian access ramp or the curb and gutter. Number: 120 Created: 8/21 /2003 Change the Emergency Access Easement to read: 20' Emergency Access Easement' Number: 121 Created: 8/21 /2003 From the Appendix E4 checklist (repeat from last round) - need to station the driveway on the south side or dimension it from some point so that they can locate it out in the field. Number: 122 Created: 8/21 /2003 Sheet 7 - See redlines. Dimensioning and various labeling. Department: Stormwater Utility Issue Contact: Wes Lamarque Topic: Drainage Number: 31 Created: 3/14/2003 Drainage easements are required for both detention ponds and both storm sewers. An off -site drainage easement is required for the storm sewer that is on the property to the south, as well as a temporary construction easement. Repeat Comment 6/25/03 - Reminder for final plan approval. 8/26/03 - Will remove comment after easements are received. Number: 124 Created: 8/26/2003 Please correct water quality outlet structure invert elevation on the plans, see redlined plan set. Number: 125 Created: 8/26/2003 Page 2 STAFF PROJECT REVIEW Citvof Fort Collins CITYSCAPE URBAN DESIGN Date: 08/29/2003 KIM STRAW 3555 STANFORD RD. #105 FT. COLLINS, CO 80525 Staff has reviewed your submittal for GARTH COMMERCIAL PLAZA PDP & FINAL COMPLIANCE - TYPE I (LUC) #20-02B/C, and we offer the following comments: ISSUES: Department: Current Planning Issue Contact: Troy Jones Topic: General Number: 117 Created: 6/26/2003 The Engineering and Stormwater comments still need to be resolved. You can bring In mylars that have the Issues all resolved, but be advised, if any Issues aren't adequately addressed, we will give the mylars back for revisions. Department: Engineering Issue Contact: Susan Joy Topic: General Number: 100 Created: 6/26/2003 See Appendix E6 for scanability requirements. 8/21 /3: Appendix E6 is available online at <www.fcgov.com> for your review. The site and landscape plans look good, but sheets 3 and 4 of the utility plans are unscanable. Please call me if you have any questions after reading these requirements (221-6605). Topic: Landscape Plan Number: 49 Created: 3/14/2003 Show all existing and proposed utility and drainage easements. 6/27/3: Repeat comment. Coordinate with the site and landscape plans and see comment 81 under "General." 8/21 /3: Repeat comment. The easements shown on the landscape plan do not match the easements shown on the utility plans. Number: 117 Created: 8/21 /2003 Correct the Emergency Access Drive label to read "20' Emergency Access Drive" and remove the word "new". Number: 118 Created: 8/21 /2003 Remove the word "new" in all proposed easements, see redline. Topic: Site Number: 78 Created: 6/26/2003 Relabel the 20' Fire Lane to read "20' Emergency Access Drive." 8/21/3: Repeat comment. Number: 115 Created: 8/21 /2003 Remove the word "new" in the proposed easements as redlined. Number: 116 Created: 8/21/2003 Page 1