Loading...
HomeMy WebLinkAboutWHITE SUBDIVISION (FORMERLY MAIL CREEK PARK SUB.) - REPLAT - 21-02 - CORRESPONDENCE - (4)30 "City of Fort Collins" missing in legal description. Be sure and return all of your redlined plans when you re -submit. If you have any questions regarding these issues or any other issues related to this project, please feel free to all me at (970) 221-6750. Y u rs Tru y, P� i TRO J ES i City, Plan er Page 2 STAFF PROJECT REVIEW City of Fort Collins JERRY WHITE Date: 08/01/2002 5590 OVERHILL DRIVE FORT COLLINS, CO 80526 Staff has reviewed your submittal for MAIL CREEK PARK SUBDIVISION, and we offer the following comments: ISSUES: Department: Current Planning Issue Contact: Troy Jones Topic: General 31 - The project is ready for hearing. We have received the mailing labels, and only need to coordinate with Dr. White's availability before we finalize the time. The hearing will be conducted in the conference room at 281 North College Avenue. After the hearing, the last step that we will need is the final version of the drawings be submitted on 24"x36" mylar. Be sure that all the revisions requested on this comment letter be integrated onto that final mylar version. Department: Engineering Issue Contact: Dave Stringer Topic: Plat 26 Is the easement shown along the south property line an exclusive power easement or a general utility easement? Site and Plat don't call them the some. Identify easement the some on both documents and identify the type of easement correctly. Department: Stormwater Utility Issue Contact: Wes Lamarque Topic: Drainage 28 Please provide a drainage easement for Mail Creek up to the 100-year WSEL on the plat. Department: Transportation Planning Issue Contact: Tom Reiff Topic: General 23 Please be aware that future elements (bike and pedestrian trails) of the Mason St. Transportation Corridor are planned near this area. It is important to work closely with Kathleen Reavis from the Transportation Planning Dept. during the preliminary engineering stage of the corridor's planning process. 25 The title given to the railroad line (Colorado & Southern) is incorrect. The company that runs the railroad line is actually the Burlington Northern Santa Fe Railroad. Please correct label. 27 The current proposal shows parking on the east side of the site in the railroad easement. How will the parking. be accessed? Will there be a driveway entrance from Harmony as part of the street improvements? If access is allowed, please relocate the proposed trash enclosure to the other parking lot to improve circulation for trash trucks.. Department: Technical Services Issue Contact: Jim Hoff Topic: Plat 29 Boundary and Legal Close. Page 1