HomeMy WebLinkAboutWHITE SUBDIVISION (FORMERLY MAIL CREEK PARK SUB.) - REPLAT - 21-02 - CORRESPONDENCE - (5)Department: Light & Power Issue Contact: Doug Martine
Topic: Electric
2
There are existing electric facilities within this site. These facilities must be located and surveyed by the
developer, and a 6 ft. (min.) easement included on the plat to encompass these facilities.
Department: PFA Issue Contact: Michael Chavez
Topic: Plat
7
If any construction is to take place on either of these lots a detailed site plan must be submitted for review prior to
construction.
8
1 would suggest a name change "Harmony Park" already exists.
Department: Right of Way Issue Contact: Ron Mills
Topic: General
3
It appears that a decision was made for the ROW dedication to avoid the existing building footprint.
Department: Stormwater Utility Issue Contact: Wes Lamarque
Topic: Drainage
9
In the 100-year storm, the mail creek drainage,which runs through the site, does inundate the southern building
slightly, as documented in the 1993 floodplain model report by RBD, Inc. This is just for your information. If you
want more information about flood protection measures to the building, please call Marsha Hilmes-Robinson at
221-6700.
Department: Technical Services Issue Contact: Jim Hoff
Topic: Plat
14
Legal and plat DO NOT CLOSE.
15
The City has a park named "Harmony Park." This plat should have a different name.
Department: Water Wastewater Issue Contact: Terry Ferril
Topic: General
13
The Fort Collins - Loveland Water District and the South Fort Collins Sanitation District have reviewed the project
and have no objection or comment.
Department: Zoning
Topic: General
1
NO COMMENT
Issue Contact: Jenny Nuckols
Be sure and return all of your redlined plans when you re -submit.
If you have any questions regarding these issues or any other issues related to this project, please feel free to
call me at (970) 221-6750.
ours �Truly,
%ner
ONE
it
Page 2
STAFF PROJECT REVIEW
Citv of Fort Collins
JERRY WHITE Date: 05/09/2002
5590 OVERHILL DRIVE
FORT COLLINS, CO 80526
Staff has reviewed your submittal for HARMONY PARK SUBDIVISION, and we offer the following comments:
ISSUES:
Department: Building Inspection Issue Contact: Rick Lee
Topic: General
16
No Uniform Building Code Concerns for this submittal.
Department: Current Planning Issue Contact: Troy Jones
Topic: General
10
Be aware that in the future the pedestrian/bicycle path associated with the Mason Street Transportation Corridor
may be located along the west side of the railroad tracks within the railroad right-of-way. If and when this occurs,
the city will need to possibly negotiate with you a reconfiguration of the portions of your site within the area
leased from the railroad.
11
Transportation Planning staff and Current Planning staff would like to.go over the Mason Street Transportation
Corridor information with you at some point so you can better anticipate how it may affect your site in the future.
This meeting need not be contingent upon the approval of this plat.
12
Once the comments have been addressed (see also the attached comment sheets from Technical Services &
Excel Energy) we can schedule the item for a type 1 hearing. We do not need another formal round of review,
however we will need a couple of weeks to review revisions once you have addressed all comments. This can
be accomplished through an informal review. Please submit 5 copies of the revised plat for directly to Troy
Jones in Current Planning. These revision need to be made within 90 days of the date of this letter.
19
You will be required to provide a copy of "Certificate of Taxes Due" with the mylar of the subdivision plat when it
is brought to the City's Current Planning Department for recording. The certificate may be obtained from the
Larimer County Treasurer's Office and must reflect a zero (0) balance before the City will accept the mylar.
Larimer County is requiring this document, showing no outstanding property taxes, before they will record
subdivision plats.
Department: Engineering
Topic: Plat
Issue Contact: Dave Stringer
5
Portion of existing building precludes City from getting full r.o.w. next to it. Matt Baker can still do proposed
Harmony Road improvements as shown. Plat boundary around building is okay as shown.
Show all existing and proposed easements with ties. Do you need plat note about vacation and rededication of
easements?
Department: Excel Energy Issue Contact: Len Hilderbrand
Topic: General
17
If utilities are requested for lot 2, the 30' access easement will need to be changed to include utility easement.
18
If possible, extend 15' utility easement across entire north frontage of lot 1.
Page 1