HomeMy WebLinkAboutWHITE SUBDIVISION (FORMERLY MAIL CREEK PARK SUB.) - REPLAT - 21-02 - SUBMITTAL DOCUMENTS - ROUND 2 - ROUTING SHEETProject: $%4vhov%y e.A�rk SA-Ckvls;.v. Date: S q 1 10-11
Planner: T11 T"^cS Traffic Operations:
Engineer: D11— 54+ i—"�
Items Requested
Redlined Items Being Returned
a
J
a
?
v
.ib
0
Other Items Required
Y
J
a
?
v
0
Other Items being
Returned
EngineeringX
Stormwater
Water/Wastewater/FCLWD
Traffic Operations
Transportation Planning)(
Transfort
Engineering Pvmt.
Light & Power
X
Technical Services
PFA
`
4
TOTALS
Other:
Note: All redlined items should be returned with the resubmittal/revisions. I
REVISION ROUTING SHEET-- PVIUL;-'-
ITEM 2 - 0244 S„bd %A 5(ww —
DATE RECEzVED:
a
c
`�
r
�z
r
FILE: PROJECT PLANNER
ZONING
BUILDING INSPECTION
FORESTRY
POLICE - JOE GERDOM
ADVANCE PLANNING
STREETS
R.O.W. PLANNING
WATER CONSERVATION
POST OFFICE
W EST
XCELENERGY
SCHOOLS: POUDRE / THOMPSON
AT & T DIGITAL CABLE
CDOT
DITCH COMPANY
RAILROAD: UP or BNSF
REA/DOE/PRPA
NATURAL RESOURCES
PARK PLANNING
J
�
5
TOTAL
S