Loading...
HomeMy WebLinkAboutEAGLE CLIFFS - PDP - 22-02 - CORRESPONDENCE - REVISIONS (3)North Star Design, Inc. Response to City Comments Eagle Cliffs 114-20 August 15, 2002 86 Redlines have been addressed. 89 Turn around has been provided. 90 Ram s have been revised. 38 Flowline profiles have been modified as requested. 39 See comment 38. 40 Elbow is detailed with spot elevations 94 Notes are revised 29 Horizontal control plan has been added . 31 Easements are nearly completed. 92 Grading has been revised along Lema . 93 Soils report does not show groundwater — we have not provided basement grades for this reason. 71 An underdrain system is now shown on the south lot lines. 95 Silt fence has been added along the pipe corridor. 91 Legend ahs been changed — note has been added.