Loading...
HomeMy WebLinkAboutWAFFLE HOUSE - FDP - 17-02A - SUBMITTAL DOCUMENTS - ROUND 1 - ROUTING SHEETPlanner: C rIO— m Engineer: � tk tit cx)�—s: Traffic Operations: Date: St 2 I. o Z Items Requested Site land Plat Utility Drainage Rpt Other Items Required Engineering � Redlined Items Being Returned Site land Plat Utility Drainage R t Other Items Being Returned k X Stormwater X Rattr/Waittwater x Traffic Operalions — Trans. Planning Tran*rt — Natural Resources Park Planning — Totals i 1WIT.r1�•I[;�—�•'=—piawom�.���apl'�1"��a� -I - Note: All redlined items should be returned with the mubmittal/ revislom, Routing Sheet 1/ I 1 t FILE: PROJECT PLANNER 1 IN0 1 INmWATER �� m CONSERVATION • MIMINIM PUBLIC SERVICE IN m SCHOOLS: POUDRE/THOINIPSON m MINIM STATE HIGHWAY DEPARTMENT WIN mmmm • .®------.-- MIN MIMMIMMINI� I■-®m----.-.-IN mommomm IN WIN a•.-�%i2 1.�� m mmom rim IN