HomeMy WebLinkAboutWAFFLE HOUSE - FDP - 17-02A - SUBMITTAL DOCUMENTS - ROUND 1 - ROUTING SHEETPlanner: C rIO— m
Engineer: � tk tit cx)�—s:
Traffic Operations:
Date: St 2 I. o Z
Items Requested
Site land Plat Utility Drainage Rpt Other Items Required
Engineering �
Redlined Items Being Returned
Site land Plat Utility Drainage R t Other Items Being Returned
k X
Stormwater
X
Rattr/Waittwater
x
Traffic Operalions
—
Trans. Planning
Tran*rt
—
Natural Resources
Park Planning
—
Totals
i 1WIT.r1�•I[;�—�•'=—piawom�.���apl'�1"��a�
-I -
Note: All redlined items should be returned with the mubmittal/ revislom,
Routing Sheet
1/ I 1
t
FILE: PROJECT PLANNER
1
IN0
1
INmWATER
��
m
CONSERVATION
•
MIMINIM
PUBLIC SERVICE
IN
m
SCHOOLS: POUDRE/THOINIPSON
m
MINIM
STATE HIGHWAY DEPARTMENT
WIN
mmmm
•
.®------.--
MIN
MIMMIMMINI�
I■-®m----.-.-IN
mommomm
IN
WIN
a•.-�%i2
1.��
m
mmom
rim
IN