HomeMy WebLinkAboutCOMFORT DENTAL - PDP - 19-02 - CORRESPONDENCE - TRANSPORTATION ISSUE (4)Comm '.y Planning and Environmental rvices
Current Planning
City of Fort Collins
July 18, 2003
Mr. Joe Simpson
Alpine Dental
P.O. Box 412
Fort Collins, CO 80522
RE: Comfort Dental P.D.P. - Sidewalk
Dear Joe:
The purpose of this letter is to clarify the obligation to construct a public sidewalk along
the south side of Harmony Road between the east property line of the Comfort Dental
P.D.P. (Current Planning Project File #19-02) and Hogan Drive. This sidewalk would
adjoin property owned by the Poudre Fire Authority and be considered a public sidewalk.
This sidewalk would be 360 feet in length and seven feet in width and is considered to be
an important pedestrian connection to serve the development of the Comfort Dental
P.D.P.
The cost of constructing this walk will be borne by the City of Fort Collins Street
Oversizing Program and Poudre Fire Authority. The cost sharing arrangement is that
Poudre Fire Authority will contribute $4,500 for the "local share" of the sidewalk and the
Street Oversizing Program will pay for the "oversized share" so that the walk meets the
standard for a major arterial street. It is the City's desire to have the sidewalk constructed
by the time the Alpine Dental Clinic receives a Certificate of Occupancy.
If you have any further questions regarding the design, cost or construction of this
sidewalk, please contact me at 221-6750.
Sincerely:
Ted Shepard
Chief Planner
Cc: Dave Stringer, Development Review Supervisor
Matt Baker, Street Oversizing Coordinator
Bob Poncelow, Battalion Chief
281 North College Avenue • PO. Box 580 • Fort Collins, CO 80522-0580 • (970) 221-6750 • FAX (970) 4"16-2020