Loading...
HomeMy WebLinkAboutCOMFORT DENTAL - PDP - 19-02 - CORRESPONDENCE - (5)Please be aware that there is a new design standard for ADA access ramps. Please contact the City's Engineering Dept. for the required drawings and include within the utility plans. Be sure and return all of your redlined plans when you re -submit. If you have any questions regarding these issues or any other issues related to this project, please feel free to call me at (970) 221-6750. Page 7 2- Address numeral location shall be confirmed prior to the issuance of a Certificate of Occupancy. 3- The proposed location of the fire hydrant meets PFA requirements. Topic: Site Plan 48 . Required Access: A fire lane is required. The fire lane shall be visible by painting and signage, and maintained unobstructed. 97 UFC 901.2.2.1; 901.3; 901.4.2; 902.2.1; FCLUC 49 Address Numerals: Address numerals shall be visible from the street fronting the property, and posted with a minimum of 6-inch numerals on a contrasting background. (Bronze numerals on brick are not acceptable) 97 UFC 901.4.4 Department: Stormwater Utility Issue Contact: Wes Lamarque Topic: Drainage 78 In the report, please request a variance for not detaining sub -basin 1(along Harmony). The City will support a variance due to site restraints and very little impervious area being added to this basin. Topic: Erosion/Sediment Control 79 Second Review January 17, 2003 1. There is still no clear note on the plans indicating that all disturbed areas are to be seeded and mulched (per your report). 2. Certain of the Larimer County Urban Area Street Standard notes contradict City of r Fort Collins standard erosion control notes. Please remove any that do. 3. Previous note #4 has not been addessed 4. Your plan shows silt fence around the entire site, where is the construction access? 5. What is the erosion control for the sidewalk on Harmony east of the site? Department: Transportation Planning . Issue Contact: Tom Reiff Topic: Site Plan 77 Page 6 9/20/2: The Developer/Owner info must be shown on the cover sheet of the Utility Plans. 1/13/3: Still missing the Developer/Owner telephone numbers. 51 9/20/2: The off -site sidewalk needs to be designed to standard where it terminates at Hogan. Please see redlines and C3-1866 for the improvements that went in with the Harmony Shopping Center development. 1/13/03: Show the existing ramp at Hogan and tie the temporary asphalt sidewalk into it (see redlines). Provide contour and grading information for a minimum of 50' from the project limits. How does the proposed tie into the existing and will you need a permenant slope easement? The grade from the BOW must be flat or nearly flat for a minimum of 2' before sloping. 69 1/13/3: Repeat comment, Sheet CS001: Please contact Bob Zakely for the information that must be provided on line 14 under General Construction Notes. 70 1/13/3: See sheet CS002 for CDOTs redlines. 71 1/13/3: All comments on sheet CS100 are repeat. See redlines. Corrections to the latest Legend are also requested. 72 1/13/3: See sheet CS200 & CS201 for corrections to labeling. Department: Light & Power Issue Contact: Doug Martine Topic: Electric 1 The nearest available power is on the north side of Harmony Rd., approximately 350 ft. west of this site. Assuming that boring Harmony Rd. is possible, the developer will be responsible for costs of the bore (in addition to normal electric development charges). Also, the developer will be required to provide off site easements along the south side of Harmony, west approximately 350 ft. Department: PFA . Issue Contact: Michael Chavez Topic: General 67 The previous comments dated 6-3-02, still pertain to this proposed project. 1- A fire lane is required. In addition to the standard requirements of painting and signage, the fire lane shall also be platted as an "Emergency Access Easement" on the final plat. Page 5 CDOT highway access permit is required. CDOT also stated that the proposed drive must lie within the existing driveway configuration to avoid any A -Line issues. As long as you are not changing the location, CDOT will not require that you change the A -Line. In addition, the entrance must be designed to City standards. See detail 7- 29B for the high volume drive. Your driveway can be 24' - 36' wide with a 25' curb return radii - see 8.2.9 of LCUASS. The driveway must also meet state separation requirements of 400' from Hogan, PCR to-PCR. It appears that you are approximately 390' from Hogan and that is acceptable, per Tess Jones with CDOT. She will not require a waiver. Please show this and dimension the separation on your plans, however, so that the actual distance can be verified. Harmony Road is designated as a 6-lane arterial on the Master Street Plan. The ROW requirements per detail 7-1 F of LCUASS is 141' total ROW plus an additional 12' for the Accel/Decel lane, and 15' utility easement either side. Since Harmony Road is a State Highway, additional ROW is required because the State does not count the median's gutter pan as part of the travel lane. Your project will be required to dedicate their half of an arterial street section plus the additional 15' utility easement. The total ROW required from the middle of the median is 83.5' plus the 15' utility easement. This figure is arrived by adding 9.5' for half of the median, 1' for the median's pan, 12' travel, 12' travel, 12' travel, 12' accel/decel lane, 8' bike lane, 10' parkway, and a 7' sidewalk. CDOT: Repeat: Please provide the separation distance between Hogan and the proposed driveway entrance. Please see original comment above. Can put this on the utility sheet or the off -site sidewalk improvements page - whichever is easier. CURB RETURN RADII: The curb return table referenced above for the driveway entrance was correct, however, I incorrectly stated that the radii must be 25'. The correct radii according to the table is 20'. 1 apologize for the inconvenience and additional work I know I have caused you, but the design will need to be changed and coordinated among the different plan sets. 1/13/3: Tess Jones with CDOT reviewed the TIS from the Loveland site and felt that it was sufficient enough to complete the permit application for this project. Until the ROW and utility easements are dimensioned off the median as requested, it cannot be confirmed that the ROW/easements shown are correct. 9/20/2: Please dimension the ROW and BOW from the median - I can't tell if where the ROW is or if we have enough. Also, please label all existing utility easements as existing. 1/13/3: Your response states that this information was placed on CS200 but it is still not shown.. Please provide this information as requested. Page 4 Topic: Utility Plans 21 5/15/2: Provide a CDOT signature block. 9/20/2: CDOTs signature block must be provided on each sheet as well as the cover sheet. Also, provide CDOTs general notes. Please email me at sjoy@fcgov.com and I will email those notes to you. 1/13/3: The cover sheet still needs the CDOT signature block. 23 5/15/2: Drawing Index: Change the sheet name for pages CS601 and 602 to match the individual sheets. 9/20/2: Changes made as requested, however; now sheet CS602 only has LCUASS details. Please remove the words "Detention Pond Outlet Structure" 1/13/3: Repeat. CS602 on the index does not match the title given on the individual sheet. Please correct the index to read "Details." 24 5/15/2: Dedicate an access easement for the property to the east. Since you are not replatting, all ROW, utility and temporary construction easements must be dedicated by separate document and the plans cannot be signed off/approved until those are obtained. A letter of Intent on deeded easements must be provided prior to the Type I hearing. (It appears that you will need to obtain temporary construction easements from both of the neighboring properties to do the ditch piping and sewer connections). 9/20/2: This comment still stands. A cross connection to the property to the east (PFA) is required per the Harmony Corridor Access Control Plan, however, it does not need to be constructed at this time. Please dedicate a "Public Access Easement" through the parking lot as shown in the redlines allowing for future cross access. One temporary construction easement is still needed to construct the off - site sidewalk connection. The ditch easement needs to be abandoned or vacated and a new drainage easement must be dedicated in its place. Please contact stormwater for their requirements. 1/13/3: Repeat_ Please provide all permanent and temporary easements by separate document as described above. You will need at the very least, a Letter of Intent from the property owners to the west saying that they will grant the temp construction easement to install the sewer line. I have received the letter from PFA regarding the off -site sidewalk public access easement but it is unclear from the plans whether you will need a slope easement as well. However, if you will be providing LOls only, please be aware that none of the plans will be approved until all easements are recorded and/or received. Page 3 20 5/15/2: Coordinate comments from the utility plans. 55 9/24/2: Show and label the Public Access Easement through the parking lot - see utility plan comments. 1/13/3: Lineweight is too faint to read. 73 1/13/3: Please label all existing easements as "existing" and proposed easements as "proposed". 74 1/13/3: Please show and label the existing utility easement on the west property line. Topic: Site Plan 16 5/15/2: Coordinate comments from the Utility Plans. 58 9/24/2: Note #22 - Insert the word "Existing." 1/13/3: Repeat comment. 59 9/24/2: Please label all existing easements as "existing" and proposed easements as "proposed". 1/13/3: Repeat comment. 64 9/24/2: Show the off -site sidewalk improvements. The Site Plan must match the utility plans. 1/13/3: Repeat comment. 75 1/13/3: Please show and label the existing utility easement on the west property line. 76 1/13/3: The access easement through the parking lot is too faint to read. Page 2 STAFF PROJECT REVIEW City of Fort Collins RUDD & ASSOC. ARCHITECTS Date: 1/22/2003 C/O MIKE RUDD OR ANDY LEMMER 13050 W. 43RD DR. #200 GOLDEN, CO 80403 Staff has reviewed your submittal for COMFORT DENTAL PDP - TYPE I, and we offer the following comments: ISSUES: Department: Engineering Issue Contact: Susan Joy Topic: General 68 A summary of outstanding items that must be provided prior to scheduling a public hearing: A public access and temporary construction easement or a Letter of Intent for the off -site sidewalk. This must be labeled as a "Public Access Easement" on all plan sets and dedicated that way. Do not call it a Pedestrian Easement as requested in the previous 2 submittals. Also, if you are permanently changing the grade on the PFA property, you will need a slope easement as well (LOI for hearing). Provide the off -site temporary construction easement for the sewer connection on the west side of the property. All easements or will require an exhibit clearly showing the easement being dedicated or being obtained from neighboring properties as well as the legal description of the easement. All ROW must be dedicated by separate document and include an exhibit/legal description. All ROW on Harmony must be dedicated to CDOT and the City of Fort Collins. Suggest replatting the property due to the number of easements and ROW being dedicated. This would really simplify the paperwork for you. 80 1/15/03: Coordinate the various plan sets so they present the_ same information. Topic: Landscape Plan 19 5/15/2: Show and label all easements and ROW. 9/24/2: Label the 10' parkway, ROW, and utility easement as "proposed" instead of "future" as shown now. These are being dedicated with this project. Show the off - site sidewalk improvements, this set must match the utility plans. Page 1