Loading...
HomeMy WebLinkAboutCOMFORT DENTAL - PDP - 19-02 - SUBMITTAL DOCUMENTS - ROUND 1 - DRAINAGE REPORTAPPENDIX G DRAINAGE AND EROSION CONTROL PLANS I IThe Sear -Brown Group EROSION CONTROL COST ESTIMATE oject: om o en a 5t Forto ins h-repared By: JAM Date: 03/27 CITY RESEEDING COST Unit Total Method Quantity Unit Cost Cost Notes Reseed/mulch 0.69 ac $655 $452 See Note 1. Subtotal $452 Contingency 50% $226 Total $678 Notes: 1. A<=5 ac=$655/ac; A>5 ac=$615/ac. EROSION CONTROL MEASURES Unit Total Number Method Quantity Unit Cost Cost Notes 4 Sediment/Basin Trap 1 0 $400 $400 8 Silt Fence Barrier 740 LF $3 $2,220 38 Gravel Mulch 0.37 ac $1,350 $500 39 Hay or Straw Dry Mulch (1-5% slope) 0.31 ac $500 $155 Subtotal $3,275 Contingency 50% $1,637 Total $4,912 Total Security $4,912 r APPENDIX F EROSION CONTROL COST ESTIMATE f IVA Comfort Dental Sear -Brown Pond A Orifice Calculation 984-002 r Basic Equation: Q=Cd•A•(2g•(hl-h2+r))o.5 Revised Equation: A=Q/(Cd • (2g • (hl - h2 + r))0.5 Input Cd= 0.60 Input g= 32.20 fUs2 Gravitational Constant ' h1= 5022.00 100 year WSEL h2= 5018.88 Invert Elevation of Pipe Q = 0.30 cfs Input r— 1.26 inches Output A= 0.03 ft2 Calculated orifice area 'r— 1.26 Calculated radius (inches) Orifice opening bottom aligned with invert of pipe, difference in head on the orifice measured from the centerline of the orifice opening Orifice Dia. = 2.52 inches 9 r I CLIENT: Project No: 969-00Z I I I I I i I THE SEAR -BROWN GROUP Project: Comm 6er,E J Checked By: By: �T, a4 Date: Sheet: Of: _ _--------- - lap uwK LaEl: 0!;; 2 v H. Design Procedure Form: Extended Detention Basin (EDB) - Sedimentation Facility Sheet 3 of 3 Designer: Jim Allen -Morley Company: Sear -Brown Date: March 12, 2002 Project: Comfort Dental Location: Fort Collins 6. Two -Stage Design A) Top Stage (Dwo = 2' Minimum) Dwo = feet Storage= acre-feet B) Bottom Stage (DBS = Dwc + 1.5' Minimum, Dwo + 3.0' Maximum, DsS = feet Storage = 5% to 15% of Total WOCV) Storage= acre-feet Surf. Area= acres C) Micro Pool (Minimum Depth = the Larger of Depth= feet 0.5 " Top Stage Depth or 2.5 Feet) Storage= acre-feet Surf. Area= acres D) Total Volume: Vol,,, = Storage from 5A + 6A + 6B Vol,', = acre-feet Must be > Design Volume in 1 D 7. Basin Side Slopes (Z, horizontal distance per unit vertical) Z = (horizontal/vertical) Minimum Z = 4, Flatter Preferred 8. Dam Embankment Side Slopes (Z, horizontal distance) Z = 3.00 (horizontal/vertical) per unit vertical) Minimum Z = 3, Flatter Preferred 9. Vegetation (Check the method or describe "Other") Native Grass Irrigated Turf Grass Other: Notes: UDFCD Form, EDB Design Procedure Form: Extended Detention Basin (EDB) - Sedimentation Facility Sheet 2 of 3 Designer: Jim Allen -Morley Company: Sear -Brown Date: March 12, 2002 Project: Comfort Dental Location: Fort Collins iii) Type of Screen (Based on Depth H), Describe if "Other" x S.S. #93 VEE Wire (US Filter) Other: iv) Screen Opening Slot Dimension, Describe if "Other" X : 0.139" (US Filter) Other: v) Spacing of Support Rod (O.C.) 1.00 -' inches Type and Size of Support Rod (Ref.: Table 6a-2) TE 0.074 in. x 0.50 in. vi) Type and Size of Holding Frame (Ref.: Table 6a-2) 0.75 in. x 1.00 in. angle D) For 2" High Rectangular Opening (Refer to Figure 6b): 1) Width of Rectangular Opening (W) W = inches ii) Width of Perforated Plate Opening (Ww c = W + 12") Ww"c = inches iii) Width of Trashrack Opening (Wopen;ng) from Table 6b-1 Wopen;ng = inches iv) Height of Trash Rack Screen (HTR) HTR = inches v) Type of Screen (based on depth H) (Describe if "Other") KlempTm KPP Series Aluminum Other: vi) Cross -bar Spacing (Based on Table 6b-1, KlempTm KPP inches Grating). Describe if "Other" Other: vii) Minimum Bearing Bar Size (KlempTM Series, Table 6b-2) (Based on depth of WQCV surcharge) 4. Detention Basin length to width ratio (LNV) 5 Pre -sedimentation Forebay Basin - Enter design values A) Volume (5 to 10% of the Design Volume in 1 D) acre-feet B) Surface Area acres C) Connector Pipe Diameter inches (Size to drain this volume in 5-minutes under inlet control) D) Paved/Hard Bottom and Sides yes/no UDFCD Form, EDB Design Procedure Form: Extended Detention Basin (EDB) - Sedimentation Facility Sheet 1 of 3 Designer: Company: Date: Project: Location: Jim Allen -Morley Sear -Brown March 12, 2002 Comfort Dental Fort Collins 1. Basin Storage Volume I, = 69.00 % A) Tributary Area's Imperviousness Ratio (i = 1,/ 100) i = 0.69 B) Contributing Watershed Area (Area) Area = 0.44 acres C) Water Quality Capture Volume (WQCV) WQCV = O.27 watershed inches (WQCV =1.0 " (0.91 13 - 1.19 IZ + 0.78 " 1)) D) Design Volume: Vol = (WQCV / 12) ' Area " 1.2 Vol = 01012 acre-feet 2. Outlet Works A) Outlet Type (Check One) X Orifice Plate Perforated Riser Pipe Other: B) Depth at Outlet Above Lowest Perforation (H) H = 1.00 feet C) Required Maximum Outlet Area per Row, (A,) A. = 0`.07` square inches D) Perforation Dimensions (enter one only): i) Circular Perforation Diameter OR D = 0.1200 inches, OR ii) 2" Height Rectangular Perforation Width W = inches E) Number of Columns (nc, See Table 6a-1 For Maximum) nc = 6 number F) Actual Design Outlet Area per Row (A,) A, = 0.07 square inches G) Number of Rows (nr) nr = 3 number H) Total Outlet Area (At) A„ = 0.20 " square inches 3. Trash Rack A) Needed Open Area: At = 0.5 ' (Figure 7 Value) ' A„ A, = 8 square inches B) Type of Outlet Opening (Check One) X < 2" Diameter Round 2" High Rectangular Other: C) For 2", or Smaller, Round Opening (Ref.: Figure 6a): i) Width of Trash Rack and Concrete Opening (Wmm) from Table 6a-1 W„M = 18 ' inches ii) Height of Trash Rack Screen (HTR) HTR = 36 inches UDFCD Form, EDB APPENDIX E WATER QUALITY CAPTURE VOLUME AND .OUTLET STRUCTURE DESIGN a 16 EASTPONDA COMFORT DENTAL: EAST SIDE OF POND A #units=Elevation,ft,Area,ft2,volume,acft,volume,acft ' # Elev Area Cumml Avg Cumml Conic # ft ft2 acft acft 5022.0000 488.5464 0.0133 0.0132 5021.5000 366.4147 0.0084 0.0083 5021.0000 263.2540 0.0048 0.0047 5020.5000 172.8225 0.0023 0.0022 5020.0000 94.9637 0.0007 0.0007 ' 5019.5000 30.7945 0.0000 0.0000 Frfe,6"d Elegy = SoZZ. sa lox �o(,,H,.,e Po„c( � O.oS9$ -� O.O132 = 0, 073 ac•-F% 1 Page 1 WESTPONDA COMFORT DENTAL: WEST SIDE OF POND A #units=Elevation,ft,Area,ft2,volume,acft,volume,acft ' # Elev Area Cumml Avg Cumml conic # ft ft2 acft acft 5022.0000 1639.9108 0.0600 0.0598 5021.5000 1386.6469 0.0426 0.0424 ' 5021.0000 1149.4294 0.0280 0.0279 5020.5000 930.2509 0.0161 0.0160 5020.0000 729.1115 0.0066 0.0065 ' 5019.5000 416.0398 0.0000 0.0000 1 � �ree.%owd EIeJa��, _ So2Z. Sa Q.Oi98 t 6,013Z �.0�3 QC•YT Page 1 75.00 2.50 0.10 0.03 0.07 80.00 2.38 0.10 0.03 0.07 85.00 2.30 0.10 0.04 0.07 90.00 2.22 0.11 0.04 0.07 95.00 2.14 0.11 0.04 0.07 100.00 2.06 0.11 0.04 0.07 105.00 2.00 0.11 0.04 0.07 110.00 1.95 0.11 0.05 0.07 115.00 1.89 0.11 0.05 0.07 120.00 1.84 0.12 0.05 0.06 ----------------------------------------------------- THE REQUIRED POND SIZE = 6.657626E-02 ACRE -FT THE RAINFALL DURATION FOR THE ABOVE POND STORAGE= 90 MINUTES ***** GEOMETRIES OF AN EQUIVALENT CIRCULAR POND ----------------------------------------------------- STAGE CONTOUR CONTOUR POND POND (DEPTH) DIAMETER AREA SIDE SLP STORAGE FEET FEET ACRE FT/FT ACRE -FT ----------------------------------------------------- 0.00 166.53 0.50 3.00 0.00 0.50 169.53 0.52 3.00 0.25 1.00 172.53 0.54 3.00 0.52 1.50 175.53 0.56 3.00 0.79 2.00 178.53 0.57 3.00 1.07 2.50 181.53 0.59 3.00 1.37 ----------------------------------------------------- 03.00 1.0 c DETENTION POND SIZING BY FAA METHOD Developed by Civil Eng. Dept., U. of Colorado Supported by Denver Metro Cities/Counties Pool Fund Study Denver Urban Drainage and Flood Control District, Colorado USER=Kevin Gingery........................................................... EXECUTED ON 03-07-2002 AT TIME 08:42:41 PROJECT TITLE: TYPE IN THE PROJECT TITLE **** DRAINAGE BASIN DESCRIPTION BASIN ID NUMBER = 1.00 BASIN AREA (acre)= 0.44 RUNOFF COEF = 0.86 ***** DESIGN RAINFALL STATISTICS DESIGN RETURN PERIOD (YEARS) = 100.00 INTENSITY(IN/HR)-DURATION(MIN) TABLE IS GIVEN DURATION 5 10 20 30 40 50 60 80 100 120 150 180 INTENSITY 9.9 7.7 5.6 4.5 3.7 3.2 2.9 2.4 2.1 1.8 1.2 1.0 ***** POND OUTFLOW CHARACTERISTICS: MAXIMUM ALLOWABLE RELEASE RATE = .31 CFS OUTFLOW ADJUSTMENT FACTOR = 1 AVERAGE RELEASE RATE = .31 CFS AVERAGE RELEASE RATE = MAXIMUM RELEASE RATE * ADJUSTMENT FACTOR. ***** COMPUTATION OF POND SIZE ----------------------------------------------------- RAINFALL RAINFALL INFLOW OUTFLOW REQUIRED DURATION INTENSITY VOLUME VOLUME STORAGE MINUTE INCH/HR ACRE -FT ACRE -FT ACRE -FT ----------------------------------------------------- 0.00 0.00 0.00 0.00 0.00 5.00 9.95 0.03 0.00 0.02 10.00 7.72 0.04 0.00 0.04 15.00 6.66 0.05 0.01 0.05 20.00 5.60 0.06 0.01 0.05 25.00 5.06 0.07 0.01 0.06 30.00 4.52 0.07 0.01 0.06 35.00 4.13 0.08, 0.01 0.06 40.00 3.74 0.08 0.02 0.06 45.00 3.49 0.08 0.02 0.06 50.00 3.23 0.08 0.02 0.06 55.00 3.05 0.09 0.02 0.06 60.00 2.86 0.09 0.03 0.06 65.00 2.74 0.09 0.03 0.07 70.00 2.62 0.10 0.03 0.07 I t I I I I I i I I I I I I ('CLIENT: Project No: THE Project: Checked By: SEAR -BROWN GROUP k,,By: - Date: Sheet: Of: -A 4- ---- ------ -- - -------- --- -.1 A 3 3 - - ---------- APPENDIX D POND VOLUME r I I 1 I I 15 11 RHEA: HYDRAULIC RESULTS Discharge cfs Peak Flow Period hrs Velocity (fps) Area (sq.ft] Hydraulic Radiusft Normal Depth ft �i 8 1.0 5.71 0.67 0.19 0.24 LINER RESULTS L— Bottom 1 3.0 Width = 2.00 ft 3.0 Not to Scale Reach Material Tye Phase Veq. Type Soil Type Manning's'n' Permissible Shear Stress (psf) Calculated Shear Stress [psf] Safety Factor Remarks Staple Pattern Class Veg. Density Straight C350 3 0.049 8.00 5.02 1.60 STABLE Staple E Default SEAR -BROWN 91 11 II II COMFORT DENTAL Riprap Rundown for 15" RCP in Pond A Updated: 14-Mar-02 "pipe Diameter: D 15 in .discharge: Q 3.76 cfs IlTailwater*: y 0.5 ft (unknown) * Assume that y=0.4*D if tailwater conditions are unknown 1. Required riprap type: ' 2. Expansion Factor: By: J.Gooch 984-002 Checked: Soil Type: Erosion Resistant Soil (Clay) Max Velocity: V 7.7 ft/sec Q/D2.5 = 2.15 < 6 --> use design charts D = 1.25 ft Yt/D = 0.40 Q/D^1.5 = 2.69 d50 = Use 2.23 in ----> 0 in Sct I 1 —> geotextile or minimum riprap gradation. -It Aktlf 51 " Gefej l e &sIn . 1/2tan0 = 5.48 3. Riprap Length: ' At = QN = 0.49 ft2 L = 1/2tane * (At/Yt - D) = -1 ft ' 4. Governing Limits: L> 3D 4 ft increase length to 4 ft 5. Maximum Depth: Depth = 2d50 = 2 (0 in / 12) = 0 ft 6. Bedding: ft Use 1 thick layer of Type II (CDOT Class A) bedding material. ' 7. Riprap Width: Width = 3D = 3 (15 in /12) = 4 ft ' (Extend riprap to minimum of culvert height or normal channel depth.) Summary: geotextile or minimum riprap gradation. Length = 4 ft ' Depth = 0 ft Width = 4 ft Reference: UDFCD USDCM, Vol. 1, Major Drainage, Page MD-105 ' L:\JOBS\984-002\SITE\ENG\DRAINAGE\RIPRAP 151NCHALS II ' Project = COMF Inlet ID = ALL 2' CURB DENTAL:. CURB CUT DESIGN B CUTS IN BASIN 2 IN A SUMP 2 WP Lu WP ign Information (input) ign Discharge on the Street (from Street Hy) Ith of a Unit Inlet Width for Depression Pan ging Factor for a Single Unit ht of Curb Opening in Inches ce Coefficient Coefficient er Depth for the Design Condition e of Throat (see USDCM Chapter 6, Figure ST-5) ber of Curb Opening Inlets As a Weir Total Length of Curb Opening Inlet Capacity as a Weir without Clogging Clogging Coefficient for Multiple Units Clogging Factor for Multiple Units Capacity as a Weir with Clogging As an orifice Capacity as an Orifice without Clogging Capacity as an Orifice with Clogging 1 F Percentage for this Inlet = Qa / Qo = nv Direction Qo = 3A cfs Lu = _.:5.00 ft Wp= 3.00'ft Co = _ '< _ _ 040 H = ; 6.00 inches Cd = - ___0.67 Cw = 2-30' Yd = 0.50 ft Theta = 63.0 degrees No = 1. L = 5'OGL ft Qwi = 8.5 cfs Clog-Coeff = 1,00+ Clog 0 40' Qwa — B 8 cfs Qoi T.1cfs Qoa = 4:2 cfs Qa 4 2, cfs C% % Note: Unless additional ponding depth or spilling over the curb is acceptable, a capture percentage of less than 100% in a sump may indicate the need for additional inlet units. 71r A Z' CA C-� o, 4,Z �t5. IhP�t�uv� } fequ�d�eSS Ol T�wJS� 4�� J - UD-Inlet v1.00, Curb-S 21 Cv-v� �w$s ik B4s , Z / KtJ 4e, hecesso4y c 3%13 2002, 12:24 PM II " GUTTER CONVEYANCE CAPACITY 11 ' Project = COMFORT DENTAL: CURB CUTS INTO POND A Street ID = II II II x� V Side Walk TS Y Qw � Qx �'`� Sz D; t/ Ds K SW T �________________________y <--W><---------Tx--------> Gutter Street Sweet .cmw ' ' Warning 0'1 Design Discharge in the Gutter Curb Height Gutter Width Gutter Depression Street Transverse Slope Street Longitudinal Slope Manning's Roughness Qo = H = W = Ds = Sx = So = N = 3.8 cfs 6,00 inches 1.00ft 2,00 inches 0,0070 fUft 0,0060 ft/ft 0.013 Gutter Conve ance Capacity Gutter Cross Slope Sw = ' '= 0,17 ft/ft ' Water Spread Width T = 22,33 ft Water Depth without Gutter Depression y = O.16 ft Water Depth with a Gutter Depression D == 0,32 ft Spread for Side Flow on the Street Tx = 21.33 ft Spread for Gutter Flow along Gutter Slope Ts = 1.86 ft Flowrate Carried by Width Ts Qws = 0.9 cfs ' Flowrate Carried by Width (Ts - W) Qww = 0.1 cfs Gutter Flow Qw = 0 8 cfs Side Flow Qx = 3 0 cfs tTotal Flow (Check against Qo) Qs = 3.8 Cfs Gutter Flow to Design Flow Ratio Eo = 0,22 ' Equivalent Slope for the Street Se = 0,04 ft/ft Flow Area As = 1,83 sq ft Flow Velocity Vs = 2.07 fps VsD product VsD = 0.67 ft'/s Waming 01: Manning's ri-value does not meet the ;J..,''1}CN4 recY:rnmendeo irlterja, CURB CUT DESIGN, Street Hy 3/13/2002. 12:29 PM I 1 APPENDIX C i 1 STORM DRAINS, CURB CUTS, AND EROSION CONTROL DESIGN 1 1 1 1 E 1 1 1 1 1 F 1 14 1 Rational Method 100 Year Design Storm Conn" Dental Fat Collins 9E4-002 RoLding Flow Time t -Channel It a ff re me, Street p e Den9n Yoee Basins t, L..A" Length Type Slope Velocity Travel (R) le C CCr Intensity Area Rumf1 Runoff Rlnoff Capacity Design Velocity epee Slope Marning's Roughness Size Flow Depth Capacity esign Floe/ omx Flow Depth Average Velocity Mn f t (a) (%) (Ns) (min) Mn) IMr (sic) (cfs ds ds Ids)(Rh) it % 'n' n) N ids) ds In (Ns) Remarks 2 5.0 .. U.0 L•rA ry.E6 O.C+i bU5 9.bE tl.f: rJ 44 0.'ib 3.%E i•.:Yi O; k` 4.%b 37E O.CO J.Lw G.U43 O.g43 tl J v1Y� OW O. LY) Orx1 ii.Lx) O00 0.ry0 oL,i ] 7f.4 .. g.0 41.3E 0."tE OJf '.J1 O.f7 0.!b iL•�1 rJ1'S v,tY) :i.Lx) i1 LW) Of A 0.00 ,,... .. J :.. :. ,...:..??b:tzsS:z;.:: -.... .; ;:::.x.:a..:j;;<;f.% O.0 afA e„� vlx) : •; Sb5 :a:. -. or -.. _ _ rxi .1g r Note. a) Codes the dismal type for velocity cal liallws. PA = Paved. PL = Pa slue 4 Lawns, GW = Grossed Waterway Tbo S. arum Gwap 10.33 PM mao02 M s M M i M M = = s== M M s= M as M Rational Method 10 Year Design Storm Comfort Dental Fat Collins 984-002 Routing Flow Time -Channel Runoff Street pl s D..Ion Point Basins t, Length Type Slope Velocity Travel 4• C Intensity Area Uilact e Runoff Runoff Runoff Capacity Design Velocity a Slope Manning's Roughness Sire Flow Depth Capacity Design Flow Normal Flow Depth Average Velocity LOufi. min (it) (a) M (his) (min) min (inthr) (ae eh (cis) cfs) (eft) Yvs five M 'n' In In) We) 'I i 0.0 %.DV 0.53 Ors 01? C.t31 ii 0ii cat (Ms In (tug) Remarks 2 S.0 U.0 6.00 U,UB 4.87 44a 1.4'7 :i.0s 1.47 9A0 i.UO is C10 0 q.M; .0o) G.C7., C 0O? 0..i0 0�1 QO 1?21 0.?5 3.45 0.'13 (i0 0.11 U'11 U.UL` O:.x1 G.OU O.00 U.UU L.b: 3.43 D.JU D.CU n ..�. 0GU 0.i:•0 D.UG O.LY1 L'.DD 0.^0 J ....:::,:::. :::.:::::: :.: .........n. .......... �.:wd>::L.;:ksk.k'3ss:.;.,.,.rE':n�:Syr;;:rC:•::;.....,...:.:..:.;[:'r.%i•:: :::.:...................n... J.. h. ....� :v. >k.3f2... .....:'b'.+}.{JJJ:Ab ':3#n.:;a¢:.ra:• sse<�: :i:..:,-::.• Note: a) Codes the channel type for velocity calculations. PA - Paved, Pl. • Pasture 6 Lawns, GW = Grassed Waterway TM Ssar-Brown Group 10:32 PM 11r2002 =1= M M s M M= M a= M M M M M= a Im TIME OF CONCENTRATION 100 year design storm Comfort Dental Fort Collins 984-002 1.87(1.1— CCr ),ID— S 0.333 tc= ti+tL Cf = 1.25 SUB -BASIN DATA INITIAL/OVERLAND TIME TRAVEL TIME FI�NALI REMARKS BASIN AREA C LENGTH SLOPE t; LENGTH CHANNEL SLOPE VELOCITY tL tc NO. (ac) (ft) N (min) (ft) TYPE(a) N (ft/s) (min) (min) 1 2 3 4 5 6 7 8 10 12 13 1 0.12 0.53 10 2.00 2.0 0 PA 1.0 1.91 0.0 5.0 To Road 2 0.44 0.69 20 2.00 1.6 180 PA 1.0 1.91 1.6 5.0 To Det Pond 3 0.13 0.25 80 2.00 10.5 150 PA. 1.0 0.9 11.4 Historic Off -Site Flows SITE 0.68 000.00 r0 _........2.72 Ji Note: a) Codes the channel type for velocity calculations. PA = Paved, PL = Pasture & Lawns, GW = Grassed Waterway The Sear -Brown Group 10:31 PM 3/7/2002 TIME OF CONCENTRATION 10 year design storm Comfort Dental Fort Collins 984-002 1.87(1.1— CC f )-JD t 5.0.333 f, = tj+tL C/ = 1.00 SUB -BASIN DATA INITIAUOVERLAND TIME TRAVEL TIME FINAL REMARKS BASIN AREA C LENGTH SLOPE t; LENGTH CHANNEL SLOPE VELOCITY tL t' NO. (ac) (ft) N (min) (ft) TYPE(a) N (f /s) (min) (min) 1 2 3 4 5 6 7 8 10 12 13 1 0.12 0.53 10 2.00 2.7 C. PA 1.0 i.91 O.G S.0 To Road 2 0.44 - 20 2.00 2.7 180 PA. 1.0 1.91 1.6 5.0 To Det Pond 3 0.13 0.25 80 2.00 11.3 150 PA 2.0 -- 0.9 12.2 Historic Off -Site Flows Si..72 r. 0.57 0.25 ?00 2.00 12.6 0 P;. ?A O.fi& .. Existin Site ........... ........ ............ ............... .......... «...............::v.: v::.: •;;.:i::v'ni5: ::C.iy:ii'.ii}iq:............::..::.::.......... ... Note: a) Codes the channel type for velocity calculations. PA = Paved, PL = Pasture & Lawns, GW = Grassed Waterway The Sear -Brown Group 10:30 PM 3/7/2002 M M M M s asl M a M M a* M an Me M; s a Developed Weighted Runoff Coefficients Comfort Dental Fort Collins 984-002 7'i?is shee:i calculates th-e- 00171poS4e "C" val:aes Irw the Rabono.1 h9Fthod. 1 1 0.95 0.25 5,187 0.12 2,096 0.05 2 0.95 0.25 19,121 0.44 12,000 0.28 3 0.95 0.25 5,495 0.13 0 0.00 The Sear -Brown Group = 43.560 ft2 40.4 59.6 0.53 62.8 37.2 0.69 0.0 100.0 0.25 10:29 PM 3/7/2002 M M-M jwsMMMM � M�its � Ms MsMw Existing Weighted Runoff Coefficients Comfort Dental Fort Collins 964-002 T'Ns slieel calculwe.s, [he -COMPOsfte "C" values for 01he Rational -Method, 1 acre = 43.560 ft2 1 0.95 0.25 5,187 0.12 0 0.00 0.00 100.00 0.25 2 0.95 0.25 19,121 0.44 0 0.00 0.00 100.00 0.25 3 0.95 0,25 5,495 ............ 0.13 .......... ...... 0 0.00 0.00 100.00 0.25 10 29 PM The Sear -Brown Group 3/7/2002 Ms m m s m m s� M a� m s a m Ma mw Developed Site Hydrology Comfort Dental Fort Collins 984-002 1 1 0.12 0.53 0.31 0.79 2 2 0.44 0.69 1.47 3.76 3 3 0.13 0.20 0.11 0.29 10:28 PM The Sear -Brown Group 3/7/2002 I Il I 11 r 1 I I APPENDIX B RATIONAL METHOD HYDROLOGY 13 VICINITY MAP SCALE: 1" = 1000' �T Qr i Ei^.TAn Y 3UTPAAN PAR 7C �: AR Lwc sr i L P-R.wxwn r=:R DN pm10 n s ■ r CTRCUT MAN P AY c R d c 4 LAWfNGS FAR O j PAVLP.7N LN Pl V PROJECT SITE g .°BARD `" Tr •7.4ilCC ST ,,. < C j- n WI)AAMONYRD y :YP_ !i IDr ':Y4 ,P ARK x W FLEWNTARY � �Qs P PRAir{1[ST ' i 4 W FAIR WAY.LN ci - FAIR NAY LX. a z 0 a _ T 1 ML> L * MIRA141OM PARK - \33SS O', ` aFT.vr��gec :?AEN ARv 4 v O J J a U! �v Q 1 1 1 1 1 APPENDICES 11 VIII. REFERENCES 1. Storm Drainage Design Criteria and Construction Standards by the City of Fort Collins, Colorado, May 1984, interim revision January 1997. 2. Erosion Control Reference Manual for Construction Sites by the City of Fort Collins; Colorado, January 1991. 10 .1 B. Drainage Concept ' The proposed drainage concepts presented in this report and on the construction plans adequately provide for the transmission of developed on -site runoff to the existing and proposed drainage facilities at the north side of the subject site. The combination of curb and gutter, culverts, curb cuts, and proposed storm drains will provide for the 10-year and the 100-year developed flows to reach the future detention pond at the north edge of this site. The 100-year runoff generated by development of this site ' will be routed to the detention pond and through a staged WQCV outlet structure, which releases the 2-yr historic flow to to the existing irrigation ditch, via a 12" ' HDPE pipe. If groundwater is encountered at the time of construction, a Colorado Department of ' Health Construction Dewatering Permit will be required. C. Stormwater Quality Concept The proposed design has addressed the water quality aspect of stormwater runoff. The grass -lined pond with WQCV will provide an opportunity for stormwater pollutants to filter out of the stormwater before runoff enters the Mail Creek Basin, and ultimately into Fossil Creek Reservoir. D. Erosion Control Concept The proposed erosion control concepts adequately provide for the control of wind and rainfall erosion from Fort Collins Comfort Dental Site. Through the construction of the proposed erosion control concepts, the City of Fort Collins performance standard ' shall be met. The proposed erosion control concepts presented in this report and shown on the erosion control plan are in compliance with the City of Fort Collins Erosion Control Criteria. I 1 9 1 seed the entire project, not the cost of the erosion control methods required for constructions on the site. B. Specific Details A silt fence as shown on the erosion control exhibit will be installed prior to grading. Following construction of the detention pond and outlet structure a sediment dam will be constructed. All other disturbed areas not in a roadway or greenbelt area shall have temporary vegetation seed applied within 30 days of initial disturbance. After seeding, a hay or straw mulch shall be applied over the seed at a rate of 1.5 tons/acre minimum, and the mulch shall be adequately anchored, tacked, or crimped into the soil. Those areas that are to be paved as part of the Fort Collins Comfort Dental project must have a 1-inch layer of gravel mulch applied at a rate of at least 135 tons/acre 30 days after overlot grading is completed. The pavement structure shall be applied within 30 days after the utilities have been installed. If the disturbed areas will not be built on within one growing season, a permanent seed shall be applied. After seeding, a hay or straw mulch shall be applied over the seed at a minimum rate of 1.5 tons/acre, and the mulch shall be adequately anchored, tacked or crimped into the soil. In the event a portion of the roadway pavement surface and utilities will not be constructed for an extended period of time after overlot grading, a temporary vegetation seed and mulch shall also be applied to the roadway areas as discussed above. All construction activities must also comply with the State of Colorado permitting process for Stormwater Discharges Associated with Construction Activity. A Colorado Department of Health NPDES permit has been obtained such that construction grading can continue within this development. VII. . CONCLUSIONS A. Compliance with Standards ' All computations that have been completed within this report are in compliance with the City of Fort Collins Erosion Control Reference Manual for Construction Sites and the Storm Drainage Design Criteria Manual. I 161 L_J I B. Specific Details The NHA @ Fort Collins has been broken down into three sub -basins. SUB -BASIN 1 ' Sub -basin 1 (Qloo = 0.79cfs) is in the future Right of way of Harmony Road and flows undetained to Harmony Road. SUB -BASIN 2 Sub -basin 2 (Qloo = 3.76 cfs) is the majority of the development and flows to the detention pond A. SUB -BASIN 3 Sub -basin 3 (Qloo = 0.29 cfs) remains without additional hard area and releases offsite to the south in its historical condition. DETENTION POND The historic outflow from the site to the irrigation ditch is from Basins 1 and 2. The ' Historic flow to the Ditch is 0301 cfs. The volume required for this pond is 0.066 ac-ft. Refer to the appendix for the Calculations. V. STORMWATER QUALITY A. General Concept wThe quality of the storm water will be improved as on -site flows will enter a grass- lined detention pond, and then be routed through a water quality structure before leaving the site. VI. EROSION CONTROL A. General Concept This development lies within the Moderate Rainfall Erodibility Zone and the Moderate Wind Erodibility Zone per the City of Fort Collins zone maps. There should be minimal to no erosion problems after completion of the Fort Collins Comfort Dental improvements. ' The Erosion Control Performance Standard (PS) during construction for this project was not computed due to the small size of the Project. The erosion control method listed below meets the City of Fort Collins requirements. An erosion control escrow cost estimate of $678 is also included in Appendix F. This represents the cost to re- 1 7 iI 1 III. DRAINAGE DESIGN CRITERIA A. Regulations The City of Fort Collins Storm Drainage Design Criteria is being used for the subject site. B. Development Criteria Reference and Constraints The criteria and constraints are based on the conceptual review comments, which 1 recommend that the 2-year historic rate be released into the exiting irrigation ditch. C. Hydrologic Criteria tThe Rational Method. for determining surface runoff was used for the project site. The 10-year and 100-year storm event intensities; provided by the City of Fort Collins, were used in calculating runoff values. Pond sizing was done using the FAA pond sizing method. These calculations and criteria are included in Appendices B & D, of this report. 1 D. Hydraulic Criteria ' All hydraulic calculations within this report have been prepared in accordance with the City of Fort Collins Drainage Criteria and are also included in the Appendix. E. Variance 1 A variance is requested to allow 0.5 feet of freeboard for the detention Pond. IV. DRAINAGE FACILITY DESIGN A. General Concept The majority of on -site runoff that is produced by the improvements to the proposed Comfort Dental development will surface flow north to the Detention Pond A. Detention Pond A is split on both sides of the entrance drive. The outflow from the detention pond is then routed, via a 12" High Density Poly -Ethylene (HDPE) Pipe, _ to the existing irrigation ditch. The proposed drainage and erosion control plan is included in the back pocket of this report (Appendix G). 1 11 an i I ' FINAL DRAINAGE AND EROSION CONTROL STUDY FORT COLLINS COMFORT DENTAL SITE FORT COLLINS, COLORADO I. GENERAL LOCATION AND DESCRIPTION A. Location The Fort Collins Comfort Dental site is located on the south side of Harmony road as Lot 2, Replat of part of Tract B, Fairway Estates 3rd Filing, Fort Collins, ' Colorado. B. Description of Property The proposed Fort Collins Comfort Dental Site is being proposed as a commercial development within the City of Fort Collins Zoning. The property consists of approximately 0.69 acres of land, of which is currently vegetated with native grasses. The topography generally slopes to the northeast and southeast from a high point near the western Boundary. There is a small concrete lined irrigation ditch adjacent to and south of Harmony Road. The irrigation ditch crosses under and existing driveway through a 24-inch diameter pipe. ' II. DRAINAGE BASINS A. Major Basin Description The NHA @ Fort Collins development lies within Mail Creek Basin. B. Sub -basin Description The area encompassed by the proposed Fort Collins Comfort Dental Site development has been divided into 3 sub -basins for Rational Method calculations. Runoff is routed to an on -site detention pond (Pond A). Pond A will be on the north side of the development. These on -site basins are proposed to be developed with the Comfort Dental and parking lot improvements. These sub -basins are shown on the Drainage and Erosion Control Plan in the back pocket of this report (Appendix G). 1-1 I rAPPENDICIES VICINITY MAP A MRATIONAL METHOD HYDROLOGY B ' STORM DRAINS, CURB CUTS, AND EROSION CONTROL DESIGN C POND VOLUME D WATER QUALITY CAPTURE VOLUME AND OUTLET STRUCTURE DESIGN E ' EROSION CONTROL COST ESTIMATE F DRAINAGE AND EROSION CONTROL PLANS G 1 ' iv M 1 1 1 1 1 1 1 i i 1 1 1 1 1 TABLE OF CONTENTS DESCRIPTION PAGE I. GENERAL LOCATION AND DESCRIPTION 5 A. Location 5 B. Description of Property 5 II. DRAINAGE BASINS 5 A. Major Basin Description 5 B. Sub -basin Description 5 III. DRAINAGE DESIGN CRITERIA 6 A. Regulations 6 B. Development Criteria Reference and Constraints 6 C. Hydrologic Criteria 6 D. Hydraulic Criteria 6 E. Variances from Criteria 6 IV. DRAINAGE FACILITY DESIGN 6 A. General Concept 6 B. Specific Details 7 V. STORMWATER QUALITY 7 A. General Concept 7 B. Specific Details 7 VI. EROSION CONTROL 7 A. General Concept 7 B. Specific Details 7 VII. CONCLUSIONS g A. Compliance with Standards 8 B. Drainage Concept 9 C. Stormwater Quality Concept 9 D. Erosion Control Concept 9 VIII. REFERENCES iii 10 SEAR BROW ' I hereby certify that this report for the final drainage design of the Fort Collins Comfort Dental Site was prepared under my direct supervision in accordance with the provisions of the City of Fort ' Collins Storm Drainage Criteria Manual for the owners thereof. i 1 r [1 1 I I Registered Professional Engineer State of Colorado No. I No SEAR• BROWN April 10, 2002 Mr. Basil Hamdan City of Fort Collins Water Utilities--Stormwater 700 Wood Street Fort Collins, Colorado 80521 ARCHITECTURE 2095outh Meldrum ENGINEERING Fort Colllns,CO 80521 PLANNING 970.482.5922 phone CONSTRUCTION 970.482.6368 fax www.searbrown.com RE: Final Drainage and Erosion Control Study for the Fort Collins Comfort Dental Site Dear Basil: We are pleased to submit to you, for your review and approval, this Final Drainage and Erosion Control Study for the Fort Collins Comfort Dental Site. All computations within this report have been completed in compliance with the City of Fort Collins Storm Drainage Design Criteria. We appreciate your time and consideration in reviewing this submittal. Please call if you have any questions. Respectfully, Sear -Brown Prepared by: Will sign and srimpNvhen final Jim Allen -Morley Project Manager cc: File 984-002 (A) Final Drainage and Erosion 1 Control Study for i 1 Comfort Dental Fort Collins Site i Fort Collins, Colorado 1 April 10, 2002 1 1 1 i � SEAR•BROWN 1