HomeMy WebLinkAboutWAFFLE HOUSE - PDP - 17-02 - SUBMITTAL DOCUMENTS - ROUND 2 - ROUTING SHEETProject:
Planner: Traffic Operations:
Engineer: k_ &be .Itloy-e--,
Date:
Itemi Requested , ,`"
Site I land Plat Utility Drainage Rpt Other Itemi Required
Redlined Items Being Returned
Site land I Plat Utility Drainage R t Other Itemi Being Returned
Engineering
X
X
Stormwater
—
r �{ \-
Water/Waitewate
Traffic Operations
Trani. Planning
—
Tramfort
Natural Resources
Park Planning
—
Totals
-;
Other:
—4-
Hote: All redlined items should be returned with the resubmittal/ Mimi.
r
Revisions Routing Sheet„,.
Oil
.,
FILE: PROJECr PLANNER
B=ING INSPECTION
• •
m�������aa���
�����
mADVANCE
PL-VNINING
NVATER CONSERVATION
PUBLIC SERVICE
m
STATE HIGHWAY DEPARTMENT
RAILROAD: UP or BN/CS
mmm���s
mmmmm��
iiiii�