Loading...
HomeMy WebLinkAboutGARTH COMMERCIAL PLAZA - MODIFICATION OF STANDARDS - 20-02A - CORRESPONDENCE -_._- ------ ----- _ W Troy Jones Re Garth Commercial Ph Additional Modification _um _ _ ,._ _ Page 1 From: Troy Jones To: "kim@cityscapeud.com".GWIA.FC1 Subject: Re: Garth Commercial Plaza - Additional Modification Kim, You're certainly welcome to take the modification as a stand alone. This would require two more hearings however. One in front of P&Z for the modification, and one in front of a hearing officer for the project itself. I would recommend just lumping the modification with the project and have P&Z be the only hearing. I'd recommend designing the project with two scenarios, one with the modification, one without. It seems that if the project can be graded in such a way that the civil engineering isn't much different between the two scenarios, it may not be much additional work to approach it this way. If you want to shoot for December 19th, this is the schedule of events: by Wed, 11/20 - you submit formal application for modification request Fri, 11/29 - my staff report due Wed, 12/4 - P&Z packets to printer Mon, 12/9 - P&Z packets delivered to board members Fri, 12/13 - P&Z worksession Thu, 12/19 - P&Z Hearing Troy >>> Kim Straw <kim @ cityscapeud.com> 10/29/02 02:44PM >>> Troy - Wanted to discuss potential scheduling of this additional modification. I'm going to advise Mr. Holter that it seems best to apply for the modification prior to moving to PDP with the amount of engineering work, etc., that needs to be done with that application. What timeline would we need to meet to make the December 19th PZB meeting? I called about concept reviews, and was told the 18th is the earliest possible. Do we need to go through another concept review meeting, or can the previous one suffice, and we can move straight into the modification application? It seems unlikely that anything significant will be brought up at conceptual review beyond what comments were already provided. Just trying to get a better feel for the schedule on this. Please reply or call me at 226-4074. Thanks! Kimberly Straw, AICP Project Manager Cityscape Urban Design, Inc. 3555 Stanford Rd. #105 Fort Collins, CO 80525 970.226.4074 ph kim @citvscaoeud.com