HomeMy WebLinkAboutWHITHAM PROPERTY - ODP - 24-02B - SUBMITTAL DOCUMENTS - ROUND 1 - CORRESPONDENCE-CONCEPTUAL REVIEWd. The developer/applicant should coordinate any regional
bicycle/pedestrian trail crossing of the railroad tracks with the
railroad company.
e. There could be lots of rise to East Vine Drive for the Greenfields
Drive extension, depending on where the alignment of street ends up
to be.
Please contact Peter, at (970)221-6754, if you have questions about these
comments.
9. This development request will be subject to the Development Review Fee
Schedule that is available in the Current Planning Department office. The
fees are due at the time of submittal of the required documents for the
appropriate development review process (overall development plan, project
development plan, final compliance) by City staff and affected outside
reviewing agencies. However, development proposals (PDP's, OOP's) may be
approved only after the required rezoning of the property (from T -
Transition to something other) is approved by City Council.
10. This development proposal is subject to the requirements as set forth in the
City's LUC, specifically Articles 2. Administration (Development Review
Procedures), Article 3. General Development Standards, and Division 4.21 -
Harmony Corridor Zoning District. Copies of Article 3 and Division 4.21 are
available in the Current Planning Department or on the City of Fort Collins
website @ www.fceov.com. Go to Departments, then the Current Planning
Department.
11. The City's Current Planning Department will coordinate the development
review process. The required submittal package will be submitted to this
department and distributed accordingly to other City departments and
outside reviewing agencies involved in development review.
12. The proposed ODP is subject to a Type II, Planning and Zoning Board review
and public hearing. The developer/applicant for this development request
must hold a neighborhood information meeting prior to formal submittal of
the ODP. This is set forth in Section 2.2.2 of the LUC. The required
notification area is set forth in Section 2.2.6 of the LUC. Please contact
Steve Olt, at (970)221-6341, to assist you in setting a date, time, and
location for the meeting.
b. Whatever additional street right-of-way (ROW) is needed for the
ultimate ROW width (115') for East Vine Drive along the frontage on
this property must be dedicated with the Project Development Plan
(PDP).
C. The collector street along the west property line, as shown on the
concept plan, is not shown on the City's Master Street Plan or the
Proposed Street Network in the adopted East Mulberry Corridor Plan
to go all the way north from East Mulberry Street to East Vine
Drive. This is because of the existing railroad tracks right at East
Vine Drive. If this street is connected to East Vine Drive the
Transportation Department would favor an at -grade crossing of the
railroad tracks.
d. The access street shown into Parcel 8 from East Vine Drive should be
a right-in/right-out access.
e. Please contact Mike Herzig of the Engineering Department for
information on the proposed Greenfields Drive crossing of the
railroad. Mike can be reached at (970)221-6605.
f. This development request must provide for a good bicycle/pedestrian
trail network within the project.
Please contact Tom, at (970)416-2040, if you have questions about these
comments.
8. Peter Wray of the Advance Planning offered the following comments:
a. The development plans should provide good buffer (distance and
visual/noise mitigation) between the residential uses and the railroad
tracks.
b. The proposed neighborhood center location is somewhat flexible.
C. The proposed neighborhood park site should be coordinated with the
City's Parks Planning Department. They can be reached at (970)221-
6360.
C. Because this property is within 500' of the Cooper Slough, a natural
habitat and/or feature, it will be necessary to prepare and submit to
the City of Fort Collins an Ecological Characterization Study, per
Section 3.4.1(1))(1) of the LUC.
d. A Wetland Boundary Delineation must be prepared and submitted to
the City of Fort Collins, per Section 3.4.1(D)(2) of the LUC.
e. As set forth in Section 3.4.1(E)(3) of the LUC, there is a 300' buffer
zone standard for the Cooper Slough.
f. A Fugitive Dust Control Permit will be required and this permit is
issued by the Larimer County Environmental Health Department.
Please contact them directly to discuss this requirement.
g. Bicycle/pedestrian trails should not be in the Cooper slough buffer
zone.
h. There is an existing Redtail hawk nest to the southwest of this
property that may have some impact on proposed development on this
property.
Natural Resources has a concern about development on this property
having a rise in temperature effect on the Cooper Slough.
Please contact Doug, at (970)224-6143, if you have questions about these
comments.
7. Tom Reiff of the Transportation Planning Department offered the
following comments:
a. A Transportation Impact Study (TIS), addressing all modes of
transportation, will be required with your Project Development Plan
(PDP) submittal. Please contact Eric Bracke of the Troffic
Operations Department, at (970)224-6062 and Tom Reiff of the
Transportation Planning Department, at (970)416-2040 to determine
what information may be needed in the TIS pertaining to Level of
Service (LO5) for vehicle, pedestrian, bicycle, and transit modes of
transportation.
f. The land west of the railroad tracks currently drains to the south. If
it is desired to drain it directly to the east then the effects of that
short cutting needs to be analyzed or limit it to the historic release
rate of the land on the east side of the railroad. Another option is to
obtain an easement to the south to where the runoff has historically
entered the Cooper Slough.
g. Beware of high groundwater in the area, especially in relation to the
detention pond bottom, so as to avoid the need to install a de -
watering system in the future.
Please contact Glen, at (970)224-6065, if you have questions about these
comments.
5. Rob Irish of the Light & Power Department offered the following
comments:
a. There are existing City of Fort Collins electric facilities on the north
side of East Vine Drive.
b. The standard electric development charges will apply to this
development request.
C. The water levels in this area may necessitate pad -mounted electric
facilities.
Please contact Rob, at (970)224-6167, if you have questions about these
comments.
6. Doug Moore of the Natural Resources Department offered the following
comments:
a. Native plant materials and grasses should be incorporated in the
Landscape Plan for the development. The use of bluegrass should be
minimized.
b. If prairie dogs exist on this property they must be relocated or
humanely eradicated prior to any construction occurring on -site,
including overlot grading. This is set forth in Section 3.4.1(N)(5) of
the LUC.
b. The ODP will be subject to the requirements set forth in Section
3.6.3 - Street Patterns and Connectivity Standards in the Land
Use Code and the collector & arterial streets network established
with the adopted East Mulberry Corridor Plan.
C. A Transportation Impact Study (TI5), addressing all modes of
transportation, will be required with your Project Development Plan
(PDP) submittal. Please contact Eric Bracke of the Traffic
Operations Department, at (970)224-6062 and Tom Reiff of the
Transportation Planning Department, at (970)416-2040 to determine
what information may be needed in the TIS pertaining to Level of
Service (LOS) for vehicle, pedestrian, bicycle, and transit modes of
transportation.
Please contact Katie, at (970)221-6750 or (970)221-6605, if you have
questions about these comments.
3. Jeff Hill of the City's Water/Wastewater Department indicated that
sanitary sewer and water utilities will be served by the Boxelder Sanitation
District. and the East Lorimer County (ELCO) Water District. Please
contact them directly for their requirements.
4. Glen Schlueter of the Stormwater Utility offered the following comments:
a. The site is located in the Cooper Slough/Boxelder Drainage Basins,
where there presently are no new development fees.
b. The site is on Stormwater Inventory Map #14G. A copy of the map
can be obtained from the Utility Service Center at 700 Wood Street.
C. The standard drainage and erosion control report and construction
plans are required and they must be prepared by a professional
engineer registered in the State of Colorado.
d. An easement from the site to the low flow channel of the Cooper
Slough is required for the site drainage outf all.
e. Water quality extended detention is required to treat the runoff.
�1
I,
CONCEPTUAL REVIEW STAFF COMMENTS
City of Fort Collins
MEETING DATE: April 14, 2003
ITEM: Whitham Property, Overall Development Plan
APPLICANT: BHA Design, Inc.
c/o Roger Sherman
4803 Innovation Drive
Fort Collins, CO 80525
LAND USE DATA:
Request for an Overall Development Plan (ODP) containing 679 - 1105 residential
dwelling units, a 3 - 5 acre neighborhood center, and a 1 acre (+) neighborhood park
site on a property that is 160 acres in size. The property is located on the south
side of East Vine Drive between Timberline Road and Interstate Highway 25 and is
directly west of the Cooper Slough drainage basin. Railroad tracks run diagonally
northwest.- southeast through the middle of the property. It is currently zoned T
- Transition in the City of Fort Collins. The property must be rezoned before a site
specific development plan can be approved by the City; and, the expressed intent
of the applicant is to submit a rezoning request for LMN - Low Density Mixed -Use
Neighborhood Zoning.
COMMENTS:
1. Jenny Nuckols of the Zoning Department indicated that the ODP, when and
if the property is rezoned, will subject to a Planning and Zoning Board (Type
II) review and public hearing. Please contact Jenny, at (970)416-2313, if you
have questions about her comment.
2. Katie Moore of the Engineering Department offered the following
comments:
a. The property fronts on East Vine Drive, which is designated as a 4-
lane arterial street on the City of Fort Collins Master Street Plan. A
total of 115' of right-of-way width is required for East Vine Drive.
COMMUNITY PLANNING AND ENVIRONMENTAL SERVICES 281 N. College Ave. P.O. Box 580 Fort Collins, CO 80522-0580 (970) 221-6750
CURRENT PLANNING DEPARTMENT
Community Planning and Environmental Services
Current Planning
City of Fort Collins
April 18, 2003
BHA Design, Inc.
c/o Roger Sherman
4803 Innovation Drive
Fort Collins, CO 80525
Dear Roger,
For your information, attached is a copy of the Staffs comments concerning the request
for the Whitham Property, Overall Development Plan, which was presented before the
Conceptual Review Team on April 14, 2003.
This is a request for an Overall Development Plan (ODP) containing 679 - 1105
residential dwelling units, a 3 - 5 acre neighborhood center, and a 1 acre (+)
neighborhood park site on a property that is 160 acres in size. The property is located on
the south side of East Vine Drive between Timberline Road and Interstate Highway 25
and is directly west of the Cooper Slough drainage basin. Railroad tracks run diagonally
northwest - southeast through the middle of the property. It is currently zoned T -
Transition in the City of Fort Collins. The property must be rezoned before a site specific
development plan can be approved by the City; and, the expressed intent of the applicant
is to submit a rezoning request for LMN - Low Density Mixed -Use Neighborhood
Zoning.
The comments are offered informally by Staff to assist you in preparing the detailed
components of the project application. Modifications and additions to these comments
maybe made at the time of formal review of this project.
If you should have an .e, hording. these coMmerts or the next steps in the
y d y questions reb aatb . these ep
review process, please feel free to call me at 221-6341.
S' cerely,
Seve01,
Project Planner
cc: Stormwater Utility
Streets
File
281 North College Avenue •. PO. Box 580 • Fort Collins, CO 80522-0580 • (970) 221-6750 • FAX (970) 416-2020
7. Transportation Planning Department
a. A Transportation Impact Study (TIS) is included with this submittal.
b. The existing ROW width for East Vine Drive is 60 feet. This project
will dedicate an additional 27.5 feet of ROW to accommodate the
southern half of the street section.
c. We have indicated an "At Grade" crossing of the railroad tracks for
the collector at the northwest corner of the property. We understand
that this connection may no be possible because of the railroad's
desire to minimize crossing.
d. The access into Parcel B has been labeled as "Right-In/Right-Out
Access" per the comment.
e. We will contact Mike Herzig to discuss the proposed Greenfields
Drive crossing of the railroad tracks.
f. A combination of on and off-street bicycle/pedestrian trails will be
provided with the development. The exact trail locations will be
determined with future PDP's and FCP's.
8. Advance Planning:
a. A 30 foot buffer is provided between the railroad tracks and
residential lots.
b. The neighborhood center is illustrated on the ODP.
c. We have been in contact with the Park Planning Office regarding
the location of the public neighborhood park. We will gladly locate
the public park on this property if needed.
d. The developer will coordinate trail crossings of the rail road with the
railroad company.
e. We understand the grading considerations for the connection of
Greenfields to East Vine Drive.
9. Current Planning:
We understand these comments, and no response is necessary.
Explanation of how Conceptual Review Issues have been Addressed
Whitham Property
Zoning:
It is understood that this project will be subject to a Type II review
process.
2. Engineering:
a. The existing ROW width for East Vine Drive is 60 feet. This project
will dedicate an additional 27.5 feet of ROW to accommodate the
southern half of the street section.
b. Connectivity locations are illustrated.
c. A Transportation Impact Study (TIS) is included with this submittal
3. Water/Wastewater:
a. We understand that sanitary sewer service will be provided by the
Boxelder Sanitation District and that water will be provided by the
East Lorimer County Water District. We will contact them to
coordinate these services.
4. Stormwater Utility
We understand these comments, and no response is necessary.
5. Light and Power:
We understand these comments, and no response is necessary.
6. Natural Resources:
a. Landscaping treatments have not been developed at this time. We
will address the use of native plants and grasses with preparation of
the PDP(s) and FCP(s).
b. If prairie dogs exists they will be relocated or humanely eradicated
per the Land Use Code requirements.
c. An Ecological Characterization Study is included with this submittal.
d. A wetland boundary study will be prepared and submitted to the
City.
e. A 260 foot buffer has been provided for the Cooper Slough.
f. A fugitive dust control permit will be submitted at the appropriate
time.
g. The bicycle/pedestrian trail will be located outside of the 260 foot
buffer zone.
h. The Redtail Hawk nest does not impact development of this
property.
i. We will work with Natural Resources to develop drainage schemes
that will minimize the rise of water temperatures in Cooper Slough.