HomeMy WebLinkAboutTHE LOFTS AT PARK CENTRAL - PDP - 28-02A - CORRESPONDENCE - (5)V e 77 As previously indicated, include a note on the site plan that any work on the water or sewer system which requires removal of decorative surfacing shall be repaired with an asphalt patch and shall be the owner/developers responsibility to repair decorative surfacing. 78 Maintain 10 feet of separation between the mail kiosk and all water/sewer lines. 79 Place the sanitary sewer manhole #2 on the center line of the proposed drive. Label all clean - outs in traffic areas as "traffic rated". See site, landscape and utility plans for other comments. Staff is concerned that if the chimneys are to be galvanized or stainless steel, it would cause glare or contrast with the predominant building materials. Will these chimneys be painted a muted tone? The project is ready for the Type One public hearing, subject to resolution of these issues. If you have any questions regarding these issues or any other issues related to this project, please feel free to call me at (970) 221-6750. Sincerely: Ted Shepard Chief Planner Page 4 Previous comments dated 8/30/02, 9/3/02 and 9/18/02 still pertain to this new proposal with only two additions, a 30 foot fire lane shall be required. FCLUC 3.6.6(D)(3) states: "The minimum unobstructed width shall be thirty (30) feet for access roads serving buildings three (3) stories in height on at least one (1) side of the building. The building height shall be measured from the road access grade." also, instead of 6-inch numerals, 8-inch minimum numerals and letters shall be required for the address. The full address numerals and the name of the street from which this project is addressed off of shall be posted on building 1.Please contact Michael Chavez @ 416-2869 if you have any questions.` Department: Stormwater Utility Issue Contact: Wes Lamarque Topic; Erosion/Sediment Control 68 1. Your calculations reflect completed conditions, and do not indicate whether or not your construction plan BMP's for erosion/sediment control are adequate. Please call Bob Zakely at 221-6700 if you have any questions. Topic: F000dplain 67 1. Sheet 3 and 4, Please add to Note 1 that the lowest HVAC equipment will also be required to be above the regulatory flood protection elevation. 2. Please include the following note on the Sheets 3, 4, 5, and 6 of the plans: The area within the floodway limits cannot be used for equipment storage, material storage, or temporary storage of fill dirt. Failure to comply with such a condition shall result in the stoppage of work on the site, withholding of building permits and/or certificates of occupancy. 3. Please add a note to Sheets 3 and 4 that no fill shall be placed in the City or FEMA floodway. 4. Please submit signed copies of the floodplain use permits for the water quality pond and other infrastructure along with the $25 permit fee for each one. Department: Water Wastewater Issue Contact: Jeff Hill Topic: General 23 Repeat comment: Show proposed locations of gas and electric on the overall utility plans. A utility coordination meeting may be needed for this development. 57 Repeat Comment Has PFA approved 2-inch fire lines? Page 3 Remove flood plan lines and natural resource buffer lines, these are not necessary for plat. These are site and utility plan information lines. Department: Natural Resources Issue Contact: Doug Moore Topic: General 76 The project needs to comply with 3.4.1(I)(1) - Design and Aesthetics, Project Design. Staff would like to set up a meeting with the project architect and applicants to discuss the techniques that may be necessary to satisfy this standard. Possible areas to look at would be building materials, building color, and enhanced landscaping. Department: PFA Issue Contact: Michael Chavez Topic: General 46 Required Access: A fire lane is required. The fire lane shall be visible by painting and signage, and maintained unobstructed. 97 UFC 901.2.2.1; 901.3; 901.4.2; 902.2.1; FCLUC 47 Address Numerals: Address numerals shall be visible from the street fronting the property, and posted with a minimum of 6-inch numerals on a contrasting background. (Bronze numerals on brown brick are not acceptable). 97 UFC 901.4.4 NOTE: An addressing scheme must be submitted to PFA for approval prior to construction. Please indicate from which street the project will be addressed and how individual units will be numbered. 48 Water Supply: No commercial, building can be greater then 300 feet from a fire hydrant. Fire hydrants are required with a maximum spacing of 600 feet along an approved roadway. Each hydrant must be capable of delivering 1500 gallons of water per minute at a residual pressure of 20 psi. 97 UFC 901.2.2.2 49 Sprinkler Required: These proposed buildings shall be fire sprinklered. 97 UFC 1003.2.9 NOTE: Poudre Fire Authority requires a "Knox Box" to be mounted on front of every building equipped with a required fire sprinkler system or fire alarm system. 97 UFC 902.4; PFA Policy 88-20 51 Fire Line:_ A minimum 6-inch fire line is required. 61 Page 2 s STAFF PROJECT REVIEW City of Fort Collins VF RIPLEY ASSOCIATES Date: 1/8/2003 RACHEL LINDER 401 W. MOUNTAIN AVENUE, SUITE 201 FORT COLLINS, CO 80521 Staff has reviewed your submittal for THE LOFTS AT PARK CENTRAL PDP-TYPE I, and we offer the following comments: ISSUES: Department: Advance Planning Issue Contact: Clark Mapes Topic: General 54 Trees in cutouts in front of the 3 buildings facing parking lots any reason not to add.3 strategically located trees, 1 in front of each building? Department: Engineering Issue Contact: Dave Stringer Topic: civil plans 74 Add note to truncated dome detail that contractor has the option to use stamped concrete instead of brick pavers. 75 Define elevations on detail sheet 12/12. Topic: General 53 Engineering Ready. for Mylars, when other departments are satisfied. Engineering okay with project going to hearing Topic: Plat 69 Bearings in legal does not match map. 70 Wrong Range in legal. 71 Need to add subtitle "being a replat of Park Central .......". 72 Add standard easement statement see attached. 73 Page 1