HomeMy WebLinkAboutTHE LOFTS AT PARK CENTRAL - PDP - 28-02A - CORRESPONDENCE - REVISIONS (3)• be working with PFA for approval of the residential sprinkler systems. 58 No concrete encasement is required with the new layout of the site. Park Planning — Craig Foreman: I. Because the scope of the project has changed, the trail will not be re -aligned with this project. The Fort Collins Club may choose to expand their parking lot at a later time. If they do this they will go through the planning process and propose vegetation in that area. 2. The trail is not going to be re -aligned with this project. The right-of-way will not change. 3. There will be no need for an approved detour plan for the trail because it is not going to be relocated. Thank you for your consideration. Sincerely, Rachel Linder Lee VF Ripley Associates (970)224,-5828_-: s December 17, 2002 Ted Shepard City of Fort Collins Planning Department 281 North College Avenue PO Box 580 Fort Collins, CO 80522 RE: Response to comments letter, for PARK CENTRAL PDP Dear Ted, The comments below address the issues raised by city staff regarding The Lofts at Park Central Project. Since the last round of review, the site plan has significantly changed. During the planning process, the Fort Collins Club became concerned about the loss of parking spaces. To avoid a conflict, it was necessary to negotiate changes to the site plan. The Fort Collins Club will ultimately own all of the land in their northern and eastern parking areas. This project change was coordinated with the consent and at the request of the Fort Collins Club. Stormwater— Wes Lamarque: 60 PS and EFF Calculations have been added to the report and meet requirements. 59 The permits will be submitted with mylars for the project. Engineering — Dave Stringer: 52 Parking has been modified. There is now more backing space 53 Acknowledged. 40. The site has been redesigned in this area. there is now more room for backing. Utilities — Jeff Hill: 15 Tap size should be adequate with the small amount of landscaping ro osed. 16 The water service has been noted on the plans to be located and removed at the main. There is no curb stop apparent in the field and a chance that this service may not have been installed. 23 No utility coordination meeting is required for this site; there have been no power or gas comments requesting one. Gas and power do not prepare designs until after the plat is recorded. All of the areas around the buildings are blanket utility easements to maximize the areas for dry utilities to be routed to the project. 56 Removal areas are no longer shown on the utility plan. 57 Curb stops have been added to the fire lines. The owner andsprinkler design consultant will