Loading...
HomeMy WebLinkAboutGLOBAL VILLAGE ACADEMY II - SITE PLAN ADVISORY REVIEW - SPA150001 - CORRESPONDENCE - STAFF'S PROJECT COMMENTS (2)Topic: Site Plan Comment Number: 8 Comment Originated: 01/20/2015 02/10/2015: There are still line over text issues. See redlines. 01/20/2015: There are line over text issues. See redlines. Department: Traffic Operation Contact: Martina Wilkinson, 970-221-6887, mwilkinson@fcqov.com Topic: Site Plan Comment Number: 1 Comment Originated: 01/23/2015 01/23/2015: Please add directional ramps at the sidewalk across the new parking lot north of the school. Topic: Traffic Impact Study Comment Number: 2 Comment Originated: 01/23/2015 01/23/2015: The TIS shows that four auxiliary turn lanes are warrented but not constructed within the study area. One lane (NB right at Taft/Horsetooth) is not impacted by this proposal. One lane (WB right at Horsetooth and Silver Trails) will be done by the City with striping after the overlay project this summer. The two remaining lanes (SB rights from Taft onto Bronson and Horsetooth) are impacted by school traffic. If GVA proposes to not build the lanes, please provide a variance request with narrative and justification. Thanks. Department: Water -Wastewater Engineering Contact: Wes Lamarque, 970-416-2418, wiamargue@fcgov.com Topic: General Comment Number: 1 Comment Originated: 01/23/2015 01/23/2015: A swivel tee is required for the connection with the fire line. Comment Number: 2 Comment Originated: 01/23/2015 01/23/2015: Please provide all water details that are being proposed. Department: Zoning Contact: Noah Beals, 970416-2313, nbeals@fcgov.com Topic: General Comment Number: 1 Comment Originated: 01/20/2015 01/20/2015: Along the south side on new south parking area there should beat least two trees include in the landscaped setback. Comment Number: 2 Comment Originated: 01/20/2015 01/20/2015: The mechanical equipment both on the ground and on the rooftop should be screen? Please provide screening. Comment Number: 4 Comment Originated: 01/21/2015 y 01/21/2015: PUBLIC -SAFETY RADIO AMPLIFICATION SYSTEM New buildings or building additions require a fire department, emergency communication system evaluation after the core/shell but prior to final build out. For the purposes of this section, fire walls shall not be used to define separate buildings. Where adequate radio coverage cannot be established within a building, public -safety radio amplification systems shall be designed and installed in accordance with criteria established by the Poudre Fire Authority. Poudre Fire Authority Bureau Admin Policy #07-01 Department: Stormwater Engineering Contact: Jesse Schlam, 970-218-2932, ischlam@fcgov.com Topic: Erosion Control Comment Number: 1 Comment Originated: 01/13/2015 02/10/2015: Repeat - Saw note. 01/13/2015: The site disturbs more than 10,000 sq-ft, therefore Erosion and Sediment Control Materials need to be submitted for FDP. The erosion control requirements are in the Stormwater Design Criteria under the Amendments of Volume 3 Chapter 7 Section 1.3.3. Current Erosion Control Materials Submitted does not meet requirements. Please submit; Erosion Control Plan, Erosion Control Report, and an Escrow / Security Calculation. If you need clarification concerning this section, or if there are any questions please contact Jesse Schlam 970-218-2932 or email @ jschlam@fcgov.com Contact: Wes Lamarque, 970-416-2418, wlamargue@fcgov.com Topic: General Comment Number: 2 Comment Originated: 01/23/2015 01/23/2015: Please provide a drainage letter describing the drainage improvements and showing conformance with the approved drainage report for Global Village Academy. Comment Number: 3 Comment Originated: 01/23/2015 01/23/2015: Please provide a grading plan. Comment Number: 4 Comment Originated: 01/23/2015 01/23/2015: Please provide all storm water and LID details that are proposed. Department: Technical Services Contact: Jeff County, 970-221-65885 icounty@fcgov.com Topic: Landscape Plans Comment Number: 11 Comment Originated: 02/10/2015 02/10/2015: IRRIGATION PLANS: There are line over text issues. See redlines. Comment Number: 12 Comment Originated: 02/10/2015 02/10/2015: IRRIGATION PLANS: The lighter text & linework marked is not acceptable. It will not scan or reproduce. Please darken it up. See redlines. ,i Department: Light And 1-- .ar Contact: Rob Irish, 970-224-6167, rirish@fcgov.com Topic: General Comment Number: 1 Comment Originated: 01/20/2015: Light & Power installed anew 3-phase 277/480v transformer with the construction of Global Village Academy 1. Any relocation or modification to the existing electric facilities will be at the owners expense. Comment Number: 2 Comment Originated: 01/20/2015: If the applicant anticipates a need to increase/change there existing electric load please contact Rob Irish w/Light & Power Engineering at 970-224-6167. Any change to existing electric load would require submittal of a C-1 Form and One -line diagram to Light & Power Engineering. Department: PFA Contact: Jim Lynxwiler, 970416-2869, ilynxwiler@poudre-fire.orq Topic: General Comment Number: 1 01/20/2015 01/20/2015 Comment Originated: 01/21/2015 01/21/2015: HYDRANT Another hydrant is required to meet minimum coverage. Site plans show a new hydrant located just north of new addition. This is an acceptable location. Comment Number: 2 Comment Originated: 01/21/2015 01/21/2015: FIRE LANES Fire lanes shall be provided to within 150' of all portions of the building. This requirement will have been met with the addition of the drive aisle on the north side of the building being dedicated as an Emergency Access Easement. No other access issues remain unless the building addition is to exceed 30' in height. Fire lane specifications are provided below. Comment Number: 3 Comment Originated: 01/21/2015 01/21/2015: FIRE LANE SPECIFICATIONS A fire lane plan shall be submitted for approval prior to installation. In addition to the design criteria already contained in relevant standards and policies, any new fire lane must meet the following general requirements: > Shall be designated on the plat as an Emergency Access Easement. > Maintain the required 20 foot minimum unobstructed width & 14 foot minimum overhead clearance. > Be designed as a flat, hard, all-weather driving surface capable of supporting 40 tons. > Dead-end fire access roads in excess of 150 feet in length shall be provided with an approved area for turning around fire apparatus. > The required turning radii of a fire apparatus access road shall be a minimum of 25 feet inside and 50 feet outside. Turning radii shall be detailed on submitted plans. > Be visible by painting and/or signage, and maintained unobstructed at all times. > Additional access requirements exist for buildings greater than 30' in height. Refer to Appendix D of the 2012 IFC or contact PFA for details. International Fire Code 503.2.3, 503.2.4, 503.2.5, 503.3, 503.4 and Appendix D; FCLUC 3.6.2(B)2006 and Local Amendments. Comment Number: 5 Gomment Originated: 01/21/2015 01/21/2015: A DCP or excavation permit will need to be obtained prior to starting any work on the site. Comment Number: 6 Comment Originated: 01/21/2015 01/21/2015: Please add the following note to the Utility plan and site plan: Any damaged curb, gutter and sidewalk existing prior to construction, as well as streets, sidewalks, curbs and gutters, destroyed, damaged or removed due to construction of this project, shall be replaced or restored to City of Fort Collins standards at the Developer's expense prior to the acceptance of completed improvements. Comment Number: 7 Comment Originated: 01/21/2015 01/21/2015: Please add our standard signature block to the utility and drainage plans and our standard LCUASS notes to the utility plan set. Please contact me for a copy of our standard utility plan set notes. Department: Forestry Contact: Tim Buchanan, 970-221-6361, tbuchanan@fcgov.com Topic: Landscape Plans Comment Number: 1 Comment Originated: 01/21/2015 01/21/2015: The two north most street trees along Taft Hill Road have not been installed or cannot be accurately identified as existing. there is space for only one street tree in this area but there is an open space for another street tree to the south. Please indicate on these phase to plans that these two missing street trees will be planted and show the locations where they will be planted. Contact the City Forester to obtain a permit for the planting of these two street trees. Comment Number: 2 Comment Originated: 01/21/2015 01/21/2015: The Iseli Fastigiate Spruce are shown on the plan as 5 gallon size. Specifying them as 6 foot B&B would be consistent with Fort Collins LUC standards. Comment Number: 3 Comment Originated: 01/21/2015 01/21/2015: The existing street trees planted in phase one are showing varying amounts of transplant stress. City Forestry staff will inspect the street trees in the spring to determine if the development will need to replace any of the existing street trees planted in 2014. If replacements need to occur the development will be notified to replace dead or dying street trees. Please contact the City Forester, Tim Buchanan at 2216361 or tbuchanan @fcgov.com with any question about the City inspection and acceptance process for City Street Trees. City of F6rt Collins Community Development and Neighborhood Services 281 North College Avenue PO Box 580 Fort Collins, CO 80522 970.221.6750 970.224.6134 - fax tcgov. com/developmentreview February 11, 2015 RE: Global Village Academy II, SPA150001, Round Number 2 Please see the following summary of comments from City staff and outside reviewing agencies for your submittal of the above referenced project. If you have questions about any comments, you may contact the individual commenter or direct your questions through the Project Planner, Ted Shepard, at 970-221-6343ortshepard@fcgov.com. Comment Summary: Department: Engineering Development Review Contact: Tyler Siegmund, 970-221-6501, tiegmund@fcgov.com Topic: General Comment Number: 1 Comment Originated: 01/21/2015 01/21/2015: Does the bus lane need to extend towards Bronson this close to the drive approach? It appears that if you end the bus lane further into the property you will reduce the amount of new pavement added to the site and minimize the bus and car conflict at the drive approach off of Bronson. Comment Number: 2 Comment Originated: 01/21/2015 01/21/2015: With the addition of the paved lanes interior to the property and the new curb and gutter along the private drive a grading plan will need to be submitted for review as part of the project. Will the existing inlet (near Bronson) be relocated? Comment Number: 3 Comment Originated: 01/21/2015 01/21/2015: Please submit the temporary access easement vacation documents and the new emergency access dedication documents (legal description and exhibits for both easements). There will be an additional TDRFee due to vacate and dedicate easements by separate document. You can contact me or visit http://www.fcgov.com/engineering/devrev.php for additional information on the process to vacate and dedicate easements by separate document. Comment Number: 4 Comment Originated: 01/21/2015 01/21/2015: Please remove the approximate patching limits on Bronson and Silver Trails from the Utility plan. This is existing from phase I.