Loading...
HomeMy WebLinkAboutGLOBAL VILLAGE ACADEMY II - SITE PLAN ADVISORY REVIEW - SPA150001 - CORRESPONDENCE - TRANSPORTATION ISSUE�oir\ Vo\ v nR_ 1 t-A Lk` ( r� \� *�rj o` n V7 H m rn v C � X 7 x � W Ir Y m W V) in a U U Q a� Required I A& � rl N Existing I + Bronson Street L I�jL Co I Fvq S c7L- Site Access I Requiri Existing / Horsetooth Road �To��1 voltu E WL Existing �4 1,;�� LNr i�PSQ�w� 15Z \S Inert Sc � 1,o1 Required or5�1'� SHORT RANGE (2019) GEOMETRY Figure 9 -�//LDELiCH Global Village Academy, Phase 2 TIS, January 2015 7 1 f ASSOCIATES Page 20 Global Village Academy — Fort Collins '< Learning through language and culture 2130 W. Horsetooth, Fort Collins, CO 80526 www.elobalvillageacademy.ore An Intermatumal Charter school 970-402-6898 February 3, 2015 Ted Shepard City of Fort Collins Fort Collins, CO 80522 Dear Ted; We have received your city staff s recommendation that our plans for Phase Two of Global Village Academy be approved by the Planning & Zoning Board with a new requirement that we pay for the construction of a right turn lane at on southbound Taft Hill Road at its intersection with West Horsetooth Road. We are very disappointed in this eleventh -hour condition and ask that the staff review their recommendation taking into account the full perspective of our program and our good faith efforts to work with the City. Here are the primary factors that we believe need serious consideration before the City requires that our school pay entirely for the right turn lane: 1. Prior to GVA, Phase 1, the right -turn lane did exist It was sometime after GVA, Phase 1 was opened that the City changed the function of the subject lane. The current function is to have both through traffic and right -turning traffic in this lane. It was after this change that the threshold volumes requiring a right -turn lane were exceeded. Some of the existing right - turning traffic in the morning peak hour and afternoon peak hour is comprised of GVA parents. 2. Global Village Academy - Fort Collins is a public charter school that is expanding a previously approved facility and was not legally bound to repeat the City review process. Nevertheless, as good community members we have worked with multiple City departments in good faith. 3. Early in the review process there were verbal statements made by members of the City s traffic engineering staff indicating that a right hand turn lane probably would not be required for this addition. 4. The cost of this project was not in our budget due to prior City comments and good faith belief it would not be required. We do not believe it's appropriate to take this amount of money from children's education. S. Despite working with the City staff regarding this project since November of last year this condition did not arise from City staff until this past week, 6. Global Village Academy has made numerous modifications to our landscaping, traffic, and site plan to accommodate Staff requests; even though the requests extend well beyond the requirements set by the State for public schools. And most recently Global Village has been pushed into changing its core facility color scheme - an architectural feature fully approved in phase one and a part of the Global Village branding. Even on this issue we have capitulated to the City's request Despite these factors, which we consider significant, we recognize that parents and buses bringing children to GVA-FC has increased the morning traffic volume. Traffic engineering reports indicate that it is only the morning