HomeMy WebLinkAboutPOUDRE VALLEY HOSPITAL A-WING REPLACEMENT - PDR - PDR130009 - CORRESPONDENCE -Comment NumL._.. 4 _.,mment Originated: 11/20/2013
11/20/2013: Traffic Op's will internally discuss the possibilities of some level of emergency
control of the Robertson and/or Doctor's Lane signals to help facilitate ambulance movement in
& out of (hot call) the Garfield/ER access. Traffic staff will provide more as the item is
discussed. There are some initial hurdles in attaining the preemptive control desired, such as
normal preemption causes the lights to go green N & S but the additional control would want
Red and limited Green lights N & S, and how to get the system to do that effectively and without
error. Other issues may just be the time involved in waiting for the stoppage of vehicles by the
signals and ultimately serving the ambulance versus the time the Ambulance might be able to
gain control of its desired movement with just its lights and siren.
Department: Water -Wastewater Engineering
Contact: Roger Buffington, 970-221-6854, rbuffington@fcgov.com
Topic: General
Comment Number: 1 Comment Originated: 11/19/2013
11/19/2013: Existing water mains and sanitary sewers in this area include a 12-inch water main
in Lemay and an 8-inch sewer in Doctors Lane east of Lemay.
Comment Number: 2 Comment Originated: 11/19/2013
11/19/2013: There is an existing fire line and an existing domestic water service extending east
from Lemay in the area of the proposed project.
Comment Number: 3 Comment Originated: 11/19/2013
11/19/2013: In addition, there is an existing fire hydrant east of Lemay and south of Doctors
Lane that will need to be abandoned/relocated with the project.
Comment Number: 4
Comment Originated: 11/19/2013
11/19/2013: More information is needed to determine how the new addition will receive water
and sewer service and if any new connection will be needed.
Comment Number: 5
Comment Originated: 11/19/2013
11/19/2013: The water conservation standards for landscape and irrigation will apply.
Information on these requirements can be found at: http://www.fcgov.com/standards
Department: Zoning
Contact: Peter Barnes, 970-416-2355, pbarnes@fcgov.com
Topic: General
Comment Number: 1 Comment Originated: 11/18/2013
11/18/2013: The proposed parking lot is outside of the boundaries of the approved Poudre
Valley Hospital PUD. This will require that the project be processed as a major amendment to
the Poudre Valley Hospital PUD - as a Type 2 review.
Contact: Jesse Schlam, ,10-218-2932,
9schlam@fcgov.com
Topic: Erosion Control
Comment Number: 1
Comment Originated: 11/19/2013
11/19/2013: The site disturbs more than 10,000 sq-ft and in a sensitive area, therefore Erosion
and Sediment Control Materials need to be submitted for FDP. The erosion control
requirements are in the Stormwater Design Criteria under the Amendments of Volume 3 Chapter
7 Section 1.3.3. Current Erosion Control Materials Submitted does not meet requirements.
Please submit; Erosion Control Plan, Erosion Control Report, and an Escrow / Security
Calculation. If you need clarification concerning this section, or if there are any questions
please contact Jesse Schlam 970-218-2932 or email @ jschlam@fcgov.com
Department: Technical Services
Contact: Jeff County, 970-221-6588,
Topic: General
Comment Number: 1
11/19/2013: No comments.
Department: Traffic Operation
Contact: Ward Stanford, 970-221-68209
Topic: General
Comment Number: 1
0county@fcgov.com
wstanford@fcqov.com
Comment Originated: 11/19/2013
Comment Originated: 11/19/2013
11/19/2013: Traffic Op's does not support another signal in this area of Lemay. It would have to
be a full signal operating 24/7 just the same as any other traffic signal. An emergency signal will
not work at this location due to the signal to stopping Lemay traffic does not control Garfield
traffic. Garfield traffic will use the opportunity to move onto Lemay while Lemay traffic is
stopped. The signal would need to be a full signal to control the ER access, Garfield and
Lemay. Three signals so closely spaced, plus their spacing is imbalanced, will only result in a
traffic progression problem for all other traffic traveling on Lemay Avenue.
Comment Number: 2 Comment Originated: 11/19/2013
11/19/2013: Traffic Op's prefers the ER/ambulance access to exit back onto Lemay instead of
Doctors Lane. The Doctors lane exit, as shown, is too close to the Lemay intersection and
would be in conflict with Doctors Lane traffic queued on Dr's Lane. It is also a possible hazard
for right turning traffic from northbound Lemay. It will also experience frequent/periodic
blockage due to the queued westbound traffic on Dr's Lane.
Comment Number: 3 Comment Originated: 11/20/2013
11/20/2013: As the site plan and operational characteristics continue to take shape, the parking
issue on Doctor's Lane will be discussed further. Upon discussion at the PDR, the
understanding is that PVH would like to begin transforming the Doctor's Lane roadway area
adjacent to the hospital into a more hospital oriented street with lower volumes and speeds. In
time PVH may look into the possibilities of requesting the vacation of the right of way and Dr's
Lane becomes more of an internal drive for the larger campus needs. The effort to get there is
to begin getting motorists to shift from Doctors Lane to the Robertson access. Further
development of the near term plans that would effectively initiate that traffic volume shift from
Doctor's to Robertson is what the City needs to make decisions on restriping Doctors Lane
towards that more "calmed" street section, including the reapplication of on -street parking.
grandfathered.
Comment Number: 5 Comment Originated: 11/19/2013
11/19/2013: Fifty percent of the site runoff is required to be treated using the standard water
quality treatment as described in the Fort Collins Stormwater Manual, Volume 3 - Best
Management Practices (BMPs).
(http://www.tcgov.com/utilities/business/builders-and-developers/development-forms-guideline
s-regulations/stormwater-criteria) Extended detention is the usual method selected for water
quality treatment; however the use of any of the BMPs is encouraged.
Comment Number: 6 Comment Originated: 11/19/2013
11/19/2013: Low Impact Development (LID) requirements went into effect March 11, 2013.
These require a higher degree of water quality treatment for 50% of the new impervious area
and 25% of new paved areas must be pervious. Please contact Basil Hamdan at 224-6035 or
bhamdan@fcgov.com for more information. There is also more information on the EPA web
site at: http://water.epa.gov/polwaste/green/bbfs.cfm?
goback=. gde_4605732_m ember_219392996.
LID design information can be found on the City's web site at:
http://www.fcgov.com/utilities/business/builders-and-developers/development-forms-guidelines
-regu lations/sto rmwater-criteria.
Comment Number: 7
Comment Originated: 11/19/2013
11/19/2013: The drainage outfalls for the site are the curb and gutter of the adjacent streets or
there is a portion of an abandoned Emigh irrigation lateral that has a manhole near the
intersection of Doctors Land and Prospect. This pipe could possibly be used if the pipe is in
good condition. The City may have camera inspection documentation available or the City
could inspect it again with a camera if there is a desire to use it.
Comment Number: 8
Comment Originated: 11/19/2013
11/19/2013: The city wide Stormwater development fee (PIF) is $6,390.00/acre ($0.1467/sq.-ft.)
for new impervious area over 350 sq.-ft., and there is a $1,045.00/acre ($0.024/sq.-ft.) review
fee. No fee is charged for existing impervious area. These fees are to be paid at the time
each building permit is issued. Information on fees can be found on the City's web site at
http://www.fcgov.com/utilities/business/builders-and-developers/plant-investment-development-
fees or contact Jean Pakech at 221- 6375 for questions on fees. There is also an erosion
control escrow required before the Development Construction permit is issued. The amount of
the escrow is determined by the design engineer, and is based on the site disturbance area,
cost of the measures, or a minimum amount in accordance with the Fort Collins Stormwater
Manual.
Comment Number: 9 Comment Originated: 11/19/2013
11/19/2013: The design of this site must conform to the drainage basin design of the Spring
Creek Basin Master Drainage Plan as well the Fort Collins Stormwater Manual.
following locatio,,.,.
1. New buildings or building additions that cause the building to be greater than 50,000 square
feet will require a fire department, emergency communication system evaluation after the
core/shell but prior to final build out. For the purposes of this section, fire walls shall not be
used to define separate buildings.
2. All new basements greater than 10,000 square feet where the designed occupant load is
greater than 50, regardless of the occupancy classification.
3. Existing buildings meeting the criteria of Items 1 and 2 of this section undergoing alterations
exceeding 50 percent of the aggregate area of the building.
When required, public -safety radio amplification systems shall be designed and installed in
accordance with criteria established by the Poudre Fire Authority.
Comment Number: 7 Comment Originated: 11/19/2013
11/19/2013: KNOX BOX
It may be determined at time of building permit that one or more additional Knox Boxes are
required.
061FC 506.1 and Poudre Fire Authority Bureau Policy 88-20: Poudre Fire Authority requires at
least one key box ("Knox Box") to be mounted in approved location(s) on every new building
equipped with a required fire sprinkler or fire alarm system. The top shall not be higher than 6
feet above finished floor.
Comment Number: 8
Comment Originated: 11/19/2013
11/19/2013: 2012 IFC CODE ADOPTION
Be advised, the Poudre Fire Authority and the City of Fort Collins are currently in the process of
reviewing the 2012 International Fire Code in preparation for its adoption in 2014. Building plan
reviews shall be subject to the adopted version of the fire code in place at the time of plan
review submittal and permit application.
Department: Stormwater Engineering
Contact: Glen Schlueter, 970-224-6065, gschlueter@fcgov.com
Topic: General
Comment Number: 2
Comment Originated: 11/19/2013
11/19/2013: It is important to document the existing impervious area since drainage
requirements and fees are based on new impervious area. An exhibit showing the existing
and proposed impervious areas with a table summarizing the areas is required prior to the time
fees are calculated for each building permit.
Comment Number: 3
Comment Originated: 11/19/2013
11/19/2013: A drainage letter should be sufficient to document the existing and proposed
drainage patterns and to discuss the water quality measures being provided. The drainage
letter needs to address the four -step process for selecting structural BMPs. Also standard
operating procedures (SOPs) must be prepared for each of the BMPs being used on the site.
They must be prepared by a Professional Engineer registered in Colorado.
Comment Number: 4
Comment Originated: 11/19/2013
11/19/2013: Onsite water quantity detention will need to be provided for any additional
impervious area that is added. The existing system does not meet present standards but it is
clearance (see s,-_..ial requirements for buildings exceeding & 1 height).
> Be designed as a flat, hard, all-weather driving surface capable of supporting 40 tons.
> The required turning radii of a fire apparatus access road shall be a minimum of 25 feet inside
and 50 feet outside. Turning radii shall be detailed on submitted plans.
> Be visible by painting and/or signage, and maintained unobstructed at all times.
2006 International Fire Code 503.2.3, 503.2.4, 503.2.5, 503.3, 503.4 and Appendix D; FCLUC
3.6.2(B)2006 and Local Amendments.
Comment Number: 3 Comment Originated: 11/19/2013
11/19/2013: STRUCTURES EXCEEDING 30' (OR) THREE OR MORE STORIES IN HEIGHT
Plans for the first phase, two-story addition will be compliant with the fire code, however the
addition of a third and forth story will create an out -of -access condition in the future. The IFC
code related to aerial apparatus access is provided for your reference. Further review and
discussion is recommended.
061FC Appendix D; Poudre Fire Authority Administrative Policy 85-5: In order to accommodate
the access requirements for aerial fire apparatus (ladder trucks), required fire lanes shall be 30
foot wide minimum on at least one long side of the building. At least one of the required
access routes meeting this condition shall be located within a minimum of 15 feet and a
maximum of 30 feet from the building, and shall be positioned parallel to one entire side of the
building.
Comment Number: 4
Comment Originated: 11/19/2013
11/19/2013: FIRE STANDPIPE SYSTEM
Standpipes will be required at such time that the forth story is added and should be planned for
during the initial design phase.
061FC Sections 905 and 913: Standpipe systems shall be provided in new buildings and
structures in accordance with Section 905 or the 2006 International Fire Code. Approved
standpipe systems shall be installed throughout buildings where the floor level of the highest
story is located more than 30 feet above the lowest level of fire department vehicle access.
The standpipe system shall be capable of supplying at minimum of 100 psi to the top habitable
floor. An approve fire pump may be required to achieve this minimum pressure.
Comment Number: 5 Comment Originated: 11/19/2013
11/19/2013: ROOF ACCESS
Roof access will be required at such time that the forth story is added and should be planned
for during the initial design phase.
061FC 504.3: New buildings four or more stories in height shall be provided with a stairway to
the roof. Stairway access to the roof shall be in accordance with IFC 1009.12. Such stairways
shall be marked at street and floor levels with a sign indicating that the stairway continues to the
roof.
Comment Number: 6 Comment Originated: 11/19/2013
11/1912013: PUBLIC -SAFETY RADIO AMPLIFICATION SYSTEM
A Bi-Directional Antennae evaluation will be required.
Poudre Fire Authority Bureau Admin Policy #07-01: Where adequate radio coverage cannot be
established within a building, public -safety radio amplification systems shall be installed in the
landscaping ano .:,duce bluegrass lawns as much as possible.
Department: Light And Power
Contact: Rob Irish, 970-224-6167, rirish@fcgov.com
Topic: General
Comment Number: 1 Comment Originated: 11/13/2013
11/13/2013: Light & Power currently has 3-phase primary and 3-transformers existing between
the Central Utility Plant and the PVHS A -Wing. Also, primary lines along Doctor's Ln. and along
the North edge of the proposed parking lot. Any relocation or modification to the existing
electric facilities will be at the owners expense.
Comment Number: 2
Comment Originated: 11/13/2013
11/13/2013: PVH Building A -Proposed Concept does not appear to leave any access to the
existing electric transformers. Transformer locations must be within 10' of an all weather
drive -over surface accessible by a line truck.
Comment Number: 3
Comment Originated: 11/13/2013
11/13/2013: Owner will be responsible for Electric Capacity Fee and Building Site charges.
Credit will be given for existing electric service.
Comment Number: 4 Comment Originated: 11/13/2013
11/13/2013: A C-1 form and One -line diagram will need to be submitted to Light & Power
Engineering showing your load requirements. Coordination early on of your power
requirements is recommended due to lead times of ordering large transformers.
Contact Light & Power Engineering @ 970-221-6700 to coordinate electric facilities.
Department: PFA
Contact: Jim Lynxwiler, 970-416-2869, ilynxwiler@poudre-fire.orq
Topic: General
Comment Number: 1 Comment Originated: 11/19/2013
11/19/2013: WATER SUPPLY
Currently, there is one hydrant located on the north side of the hospital (and on the north side of
Doctors Lane). As a critical facility, fire access shall be maintained and where appropriate,
improved upon. So as not to block access off of Doctors Lane, the PFA is requesting another
hydrant be added to the south side of Doctors Lane in the general area of the drive entry to the
"ED Walk-in Entrance."
Comment Number: 2
11/19/2013: FIRE LANES
Comment Originated: 11/19/2013
As fire apparatus will be utilizing the ambulance and ED "walk-in" entrances, these drive aisles
shall be designed and constructed to fire lane standards and specifications. Turning radii are
very important and covered entryways shall be of a height to allow fire apparatus to pass under
and through. Further details are needed and discussion is recommended. Fire lane
specifications are provided for your information.
FIRE LANE SPECIFICATIONS
Any new fire lane must meet the following general requirements:
> Shall be designated on the plat as an Emergency Access Easement.
> Maintain the required 20 foot minimum unobstructed width & 14 foot minimum overhead
scoping meeting —.,d determine if a traffic study is needed for t,..., project. In addition, please
contact Transportation Planning for their requirements as well.
Comment Number: 5
Comment Originated: 11/20/2013
11/20/2013: Any public improvements must be designed and built in accordance with the
Larimer County Urban Area Street Standards (LCUASS). They are available online at:
http://www.larimer.org/engineering/GMARdStds/UrbanSt.htm
Comment Number: 6 Comment Originated: 11/20/2013
11/20/2013: A Development Construction Permit (DCP) will need to be obtained prior to starting
any work on the site.
Comment Number: 7
Comment Originated: 11/20/2013
11/20/2013: Engineering is not in support of a full movement intersection onto Doctor's lane
and the preference would be to have a dedicated right out only onto Lemay Avenue from the
ambulance drive.
Comment Number: 8 Comment Originated: 11/20/2013
11/20/2013: Doctor's lane as it exists does not appear to be configured to allow on street
parking, it is Engineering's preference to not have parking along Doctors lane.
Comment Number: 9 Comment Originated: 11/20/2013
11/20/2013: With the parking lot to the north that will be serving the ER there should be across
walk across Doctors lane.
Comment Number: 10 Comment Originated: 11/20/2013
11/20/2013: In conversations in the past it was mentioned that the hospital might like to vacate
the right of way on Doctors lane and have it as a private street. Maybe not with this submittal
but is there plans for future development that might allow for this to be vacated?
Comment Number: 11 Comment Originated: 11/20/2013
11/20/2013: This project will be responsible for dedicating any easements that are necessary
for the project. These will most likely all be done by separate document which is $250 per
dedication.
Comment Number: 12 Comment Originated: 11/20/2013
11/20/2013: Utility plans will be required for this project.
Department: Environmental Planning
Contact: Lindsay Ex, 970-224-6143, Iex@fcaov.com
Topic: General
Comment Number: 1 Comment Originated: 11/21/2013
11/21/2013: The applicant should make note of Article 3.2.1(C) that requires developments to
submit plans that "...(4) protects significant trees, natural systems, and habitat". Note that a
significant tree is defined as a tree having DBH (Diameter at Breast Height) of six inches or
more. As several of the trees within this site may have a DBH of greater than six inches, a
review of the trees shall be conducted with Tim Buchanan, City Forester (221 6361) to
determine the status of the existing trees and any mitigation requirements that could result from
the proposed development.
Comment Number: 2 Comment Originated: 11/21/2013
11/21/2013: With respect to landscaping and design, the City of Fort Collins Land Use Code, in
Article 3.2.1 (E)(2)(3), requires that you use native plants and grasses in your landscaping or re
Comment NumL,.;r: 4 imment Originated: 11/20/2013
The perimeter rows of parking for the proposed lot north of Doctors Lane should be upgraded
with shade structures that support solar panels. This design was done successfully along East
Vine Drive for the Innosphere Building. There are several benefits associated with combining
parking lot shading, screening and photo -voltaic panels that are worth exploring. Norm Weaver
at Light and Power, 221-6700 can provide assistance in designing these structures and
providing information regarding economic incentives.
Comment Number: 5 Comment Originated: 11/20/2013
Are there any public entrances associated with the bed tower addition? If so, they should be
connected to the public sidewalks with highly visible walkways that are attractive, landscaped
and properly illuminated.
Comment Number: 6 Comment Originated: 11/20/2013
Parking lot interior and exterior landscaping will be required.
Comment Number: 7 Comment Originated: 11/20/2013
For the basement lab, be sure to provide light wells or courtyards so the work area can benefit
from natural light.
Comment Number: 8 Comment Originated: 11/20/2013
Will there be convenient access from the E.D. to the new respite garden on the east side of the
campus?
Comment Number: 9 Comment Originated: 11 /22/2013
Please note that institutional buildings are required to have a distinct base, middle and top. For
a flat roof, be sure that the roofline is characterized by a feature that clearly distinguishes the
roof from the wall.
Comment Number: Comment Originated: 11/22/2013
11 /22/2013:
Department: Engineering Development Review
Contact: Andrew Gingerich, 970-221-6603, agingerich@fcgov.com
Topic: General
Comment Number: 1 Comment Originated: 11/20/2013
11/20/2013: Larimer County Road Impact Fees and Street Oversizing Fees are due at the time
of building permit. Please contact Matt Baker at 224-6108 if you have any questions.
Comment Number: 2 Comment Originated: 11/20/2013
11/20/2013: The City's Transportation Development Review Fee (TDRF) is due at the time of
submittal. For additional information on these fees, please see:
http://www.fcgov.com/engineering/dev-review.php
Comment Number: 3 Comment Originated: 11/20/2013
11/20/2013: Any damaged curb, gutter and sidewalk existing prior to construction, as well as
streets, sidewalks, curbs and gutters, destroyed, damaged or removed due to construction of
this project, shall be replaced or restored to City of Fort Collins standards at the Developer's
expense prior to the acceptance of completed improvements and/or prior to the issuance of
the first Certificate of Occupancy.
Comment Number: 4 Comment Originated: 11/20/2013
11/20/2013: Please contact the City's Traffic Engineer, Joe Olson (224-6062) to schedule a
�cClty�o`��
November 22, 2013
Angela Milewski
BHA Design, Inc.
1603 Oakridge Dr.
Fort Collins, CO 80526
RE: Poudre Valley Hospital A -Wing Replacement PDR, PDR130009, Round Number
Community Development and
Neighborhood Services
281 North College Avenue
PO Box 580
Fort Collins, CO 80522
970.221.6750
970.224.6134 - fax
fcgov. com/deveiopmentreview
Please seethe following summary of comments from City staff and outside reviewing agencies for your
submittal of the above referenced project. If you have questions about any comments, you may contact the
individual commenter or direct your questions through the Project Planner, Ted Shepard, at 970-221-6343 or
tshepard@fcgov.com.
Comment Summary:
Department: Current Planning
Contact: Ted Shepard, 970-221-6343, tshepard@fcgov.com
Topic: General
Comment Number: 1 Comment Originated: 11/20/2013
The moving of the Emergency Department from the south, off the extension of Robertson Drive,
to along Lemay Avenue makes the operational and institutional aspects of the Emergency
Department much more highly visible. These aspects will need to be mitigated by high quality
architecture and generous landscaping. Otherwise, given the choice, Current Planning would
prefer that Doctors Lane be the primary access for the E.D. Has any consideration been given
to the risk of distracting drivers along Lemay by placing the E.D. in such a visible location?
There would be less driver distraction with placement along Doctors Lane. Please consider
effective screening so that arterial traffic is not distracted by the activities and the illuminatinon of
the E.D.
Comment Number: 2 Comment Originated: 11/20/2013
Exterior materials should be brick to match the existing buildings.
Comment Number: 3 Comment Originated: 11/20/2013
As you are aware, several large, mature trees were recently removed along Lemay Avenue as
part of an approved Minor Amendment. This Minor Amendment established that mitigation for
these trees is to be a part of the subject plan. Please be sure to show the quantity, size,