Loading...
HomeMy WebLinkAboutDISCOUNT TIRE AT FOSSIL CREEK - PDP/FDP - 26-02 - SUBMITTAL DOCUMENTS - ROUND 2 - REVISIONS (3)Traffic Operations - Transportation 92) Not being designed or constructed with this project. A preliminary design was made to guarantee sufficient right-of-way with vacation/dedication procedure. Dave Stringer with the City OK'd design. Transportation Planning - Transportation 73) Check — exact location of trail not determined at this time. A 20' Public Trail Access Easement has been given. 74) Current design reflects verbal wishes of City entities. A connection to S. College was not requested. 75) Check 76) Check — see site plan Natural Resources - Buffers 107) Check 19) Check 20) Check 21) Check — no stationing required 22) Check — added to plat 23) Check 24) Check - submitted Engineering, — Utility plan 17) Check 70) Check - installed 46) Not available at this time 47) Will coordinate with Light and Power 48) see above 49) see VF Ripley response Right-of-way - General 50) Check Stormwater Utility- Drainage 52) Check 53) Check 54) Check 55) Check 56) Check — The USDCM Modified FAA Method was used to calculate required volumes and release rates. 57) Check 58) Check 59) Check — no erosion control fabric required 60) Check — no off -site easement required 61) Check Stormwater Utility — Erosion/Sedimentation Control 1) Check 2) Pond Data and Basin Data Provided 3) Check — all one phase - see landscape plan 4) will provide directly Stormwater Utility - Floodplain 1) Check 2) Check 3) Check — see storm drainage report 34) Check — Shown as built by Improvements 35) This was an attempt to show ties to new improvements. Fossil Creek Parkway is disturbed in no way by this project thanks to the cooperation of the street oversizing department accommodating our development plans. 36) An attempt has been made to more clearly distinguish the existing and proposed contours for this Submittal. 37) The one wall being placed by this development leaves 8' from Property line to the wall. Exact Utility locations will be designed as part of the future South College expansion project. Site grading restrictions and the City's build -to -line expectations require the placement of this wall. Engineering — Landscape Plan 12) Check 13) Check Engineering — Overall Utility Plan 25) Check 27) Already in place. City was involved during Fossil Creek Improvements. 28) Check 29) Check 30) Check 31) Check 32) Changed plans so no longer requires off -site easement. Terry Farrill agreed to have us use the existing SFCSD to place Storm Drainage outlet pipe. Engineering — Plat 3) Check 4) Check 5) Check 6) Check 7) Check - Please examine Vacation Request to see full description on all dedicated and vacated rights -of -way and property lines. 8) Check 9) Check — see note 7) 10) Check - added 11) Check 67) Check — SFCSD will use future Public Access easement in Tract I. Engineering — Utility plan cover sheet 18) Check RECEIVED COMMENT RESPONSE AU� 2 g 2002 2nd SUBMITTAL DISCOUNT TIRE CURRENT PLANNING AT FOSSIL CREEK 8/27/2002 Prepared by: Franklin D. Blake P.E. & P.L.S. Michael Randolph E.I.T. Stewart & Associates Current Planning - General 64) A sidewalk has been added per discussion with City Planning. Sidewalk is ADA compliant with a 4.6% constant slope. Sidewalk connects to Fossil Creek Parkway instead of South College due to both grading restrictions and lack of existing sidewalk on South College, as per said discussion. The northern entrance to the retail building is directly into the showroom and functions as a secondary main entrance. 69) Through discussion with City Parks and Planning, the future Regional Trail is being given a public utility and trail access easement along the southern boundary. Access to the trail is by sidewalk along Fossil Creek Parkway to the trail's future connection contiguous to this site to the southeast. Current Planning - Transportation - #89 See above response Engineering — General 1) Existing ROW has been ghosted. Please refer to the Vacation Request involving the expansion of South College, the Fossil Creek Parkway Improvements, and the re- alignment of the future Snead Drive connection to Fossil Creek Parkway. Striping on Fossil Creek Parkway and South College is new or freshly painted and not designed by this project. 2) Check 16) Check 26) Please see response to comment #99 from Current Planning. 39) Medians and curb cut for access drive are shown as built by the City's Fossil Creek Improvements completed since IST Submittal. 68) Check Engineering — Grading Plan 33) Check