Loading...
HomeMy WebLinkAboutDISCOUNT TIRE AT FOSSIL CREEK - PDP/FDP - 26-02 - SUBMITTAL DOCUMENTS - ROUND 4 - ROUTING SHEETProject: ��,5Couki(l� Date: Z 19G� Planner: �T—inf-2y Jo net Traffic Operations: Engineer: Items Requested Site I Land I Plat Utility Drainage R t Other Items Required Redlined Items Being Returned Site land I Plat Utility Drainage R t Other Items Being Returned Engineering brmwater Water/Wattewate frafDcOperations Irani. Planning — �tmer� Trant(ort Natural Room Park Planning Iotalt z Other: Note: All redlined items should be returned with the resubmittal/ revicionc. rl % • Revisions Routing Sheet �'> PROECT PLeiNm MIN 1 ' mom 1 ���������smmm BUILDING 1INSPECTIONmm�������mmmm • �msWINN 11 mnmmmm m MINN ®® mmmom= • • �--...---m--_ ADVANCE PLANNING MINIM • ----�-------- • • 1 �mmm WATER CONSERVATION --�-..-5----- • • • .�--.---_ -----.------- PUBLIC SERVICE ----------.-- ----.--m----_ STATE HIGHWAY DEPARTMENT ®®©E�J��������5 -----�----�- ©m ------.------ ----.--.--.-- ..---....-.-- -------------