HomeMy WebLinkAboutUNIVERSITY CENTER FOR THE ARTS - SITE PLAN ADVISORY REVIEW - 34-02 - CORRESPONDENCE - (3)J
Department: Transportation Planning
Topic: General
8
Please separate landscape from site plan for easier review.
9
Identify handicapped parking spaces
Issue Contact: Mark Jackson
10
Provide ramps per ADA standards at appropriate sidewalk locations (see redline comments)
11
Provide formal bicycle parking near main entrances
12
Consider designated drop off/pick up area near main entrance on Remington Street?
Department: Water Wastewater
Topic: General
15
Issue Contact: Roger Buffington
Field locate water main which passes through the site from Pitkin to Lake and show the water main and
services on the site, landscape and utility plans. Maintain required separation distances from water lines with
all new landscaping (frees - 10 feet; Shrubs - 4 feet).
Department: Zoning
Topic: zoning
Issue Contact: Peter Barnes
This is the first and only site plan I've ever reviewed that didn't show one single dimension. Without such
details, there are numerous things that cant be reviewed.
3
The parking lot that was constructed a couple of years ago along Pitkin was done so without complying with
the City's parking lot design standards. Since they are making revisions there now, this would be a good time
to bring it further into compliance. Landscape islands are being shown that screening between the parking
lot and the street as required in Sections 3.2.1(E)(4) and 3.2.2(J). Also, 289 parking spaces require a minimum
of 7 handicap parking spaces (3.2.2(IQ(5)(d). Need bike racks (3.2.2(C)(4).
Be sure and return all of your redlined plans when you re -submit.
If you have any questions regarding these issues or any other issues, please feel free to call
me at (970) 221-6750.
Sincerely,
CAMERON GLOSS
Current Planning Director
Page 2
STAFF PROJECT REVIEW
City of Fort Collins
BRIAN FAGERSTROM Date: 7/31/2002
SLATER PAULL ARCHITECTS
1515 ARAPAHOE STREET, SUITE 400
DENVER, CO 80201
Staff has reviewed your submittal for UNIVERSITY CENTER FOR THE ARTS - SITE PLAN
ADVISORY REVIEW, and we offer the following comments:
ISSUES:
Department: Current Planning Issue Contact: Cameron Gloss
Topic: General
16
The proposal is being reviewed as a Site Plan Advisory Review pursuant to State Statute Section 31-23-209
which limits the City's review to the location, character and extent of the improvements. The Planning and
Zoning Board will conduct a public hearing on August 1, 2002 evaluating the project based on these criteria.
Should the Board disapprove the application, an appeal may be made to the State Board of Governors.
Department: Engineering Issue Contact: Dave Stringer
Topic: General
5
Only received site, landscape and Final Schematic Plan were submitted. Need Civil Engineered design plans
for all work impacting public rights -of -way
6
A street cut permit is required for excavations in public rights -of -way (typical).
7
Additional comments will follow after we have a civil plan to review
Department: Light & Power Issue Contact: Doug Martine
1
No comments
Department: Natural Resources
Topic: General
17
Please preserve existing trees.
Department: PFA
Topic: General
18
After reviewing the site plan PFA has no comments.
Issue Contact: Doug Moore
Issue Contact: Michael Chavez
Department: Stormwater Utility Issue Contact: Wes Lamarque
Topic: Drainage
13
Please provide grading and drainage plans as well as a drainage report for review.
14
Water quality 40-hour extended detention is required for all the new impervious area.
Page 1