HomeMy WebLinkAboutGERRARD ROADWAY DEDICATION - 29-02 - CORRESPONDENCE - TRAFFIC STUDYTed Shepard - Re: Gerrard Roadway Deg `ion Page 1
From: Eric Bracke
To: Dave Stringer; Rob Irish; Ted Shepard
Date: 8/16/02 9:24AM
Subject: Re: Gerrard Roadway Dedication
On item 42, 1 do not believe there will be anything that will prevent cut -through traffic. It is being built as a
recirculation roadway and some cut= -through traffic should be expected. It is however, unlikely that the
traffic will be high enough to be considered a problem.
Eric
>>> Ted Shepard 08/16/02 09:15AM >>>
I have received a phone call from an abutting property owner of the Gerrard Roadway. This is not the
property owner who brought the zoning complaint and entered into mediation last year.
This particular property owner has two questions.
1. Will the new roadway feature street lights? (Keep in mind this is located in the Urban Estate zone.)
2. What will prevent cut -through traffic from southbound Timberline over to westbound Harmony? How
will Gerrard control trespassing through his parking lot, especially during the evening? Barricade?
Chain/bollard?
I would appreciate your timely response as I promised this owner a response today. I am leaving for 2.5
weeks vacation after today. Thanks for your help, Ted.