Loading...
HomeMy WebLinkAboutPOUDRE SCHOOL DISTRICT, CENTENIAL HIGH SCHOOL EXPANSION & REMODEL - SITE PLAN ADVISORY REVIEW - 39-02 - CORRESPONDENCE - REVISIONS (3)Mr. Ted Shepard August 11, 2003 Page 2 40. Noted. Topic: Erosion/Sediment Control Noted. 2. Noted and added to the Utility Plans. 3. Noted and the erosion control plan calculations have been included in the Final Drainage Report. Engineering Comments Topic: General 3. Engineering did receive the entire submittal package. A drainage report and soils report were submitted along with civil Utility Improvement Plans, Landscape Plan and Site Plan. A Traffic Impact Study was not required per the direction of Mr. Eric Bracke, CFC Traffic Engineer. Checklist E-4 is included in this submittal. 36. Poudre School District will coordinate with the City regarding the Right -of -Way vacation and easement dedication documents. Topic: Utility Plans 33. Noted. Updated details have been incorporated into the Utility Plans. 35. Redline comments have been addressed and are incorporated into the Utility Plans. Topic: Variance Request 34. We will prepare and submit a variance request letter for the Poudre School District for the existing parking condition and minimum set back requirement. Thank you for your review and approval of these plans and responses. If you need further clarification on any of the above responses, please call me (419-1316) at your convenience. Sincerely, Nolte Assoc' , Inc. Thomas Ochwat, P.E. Associate Engineer N O LT E ASSOCIATES, INC. N:\FCO227UDocwments\Letters\Respsfo20030811.doc August 11, 2003 FCO22701 Mr. Ted Shepard Senior Planner - Current Planning Division City of Fort Collins 281 N. College Ave. Fort Collins, CO 80524 BEY ON D E N G IN E E R ING RE: Response to City of Fort Collins Comments dated April 29, May 5 and May 7, 2003 PSD — Centennial High School Expansion and Remodel Dear Mr. Shepard: This letter is in response to the comments received from the City of Fort Collins. Specific responses are in the order of each comment sheet and reference the note number where applicable. Water/Wastewater Comments 29. Site plan and Landscape plan have the same information. 30. Noted. 31. The existing water service to the site is adequate to service the proposed expansion per the mechanical engineering consultant for the project. Per the CFC Municipal Code, Chpt. 26-94, the school expansion meets the criteria for allowing a single water service for the additional building structure to be serviced from the existing water service. The Utility plans have been revised to reflect a wet tap being installed from the 6" fire service line connection within Mathews Avenue. 32. Noted. Poudre School District will coordinate with the City regarding the Right -of -Way vacation and easement dedication documents. Stormwater Utility Comments Topic: Drainage 41. Please confer with Glen Schlueter and our meeting notes from our meetings on June 4te and 13'h, 2002. Our calculation regarding water quality was reviewed and acceptable at this meeting. 42. The major water quality feature for this site is the use of grass swales in addition to 100-yr. water surface ponding and release rate. Topic: Floodplain 39. Noted. The Activities Building has a finish floor elevation of 4987.83 compared to an existing ground elevation of 4986.00. The present CFC flood plain limits do not impact the site. The proposed estimated flood plain as been annotated as being "Shallow flooding of 12" or less above existing ground." NOLTE ASSOCIATES, INC. 1901 SHARP POINT DRIVE, SUITE A FORT COLLINS. CO 80525 970.221.2400 TEL 970.221.2415 FAX WWW.NOLTE.COM N:XFCO2271DocmnentslLetteMRespcfo-2003081 Ldoc