August 11, 2003
Page 2
40. Noted.
Topic: Erosion/Sediment Control
Noted.
2. Noted and added to the Utility Plans.
3. Noted and the erosion control plan calculations have been included in the Final Drainage Report.
Engineering Comments
Topic: General
3. Engineering did receive the entire submittal package. A drainage report and soils report were
submitted along with civil Utility Improvement Plans, Landscape Plan and Site Plan. A Traffic
Impact Study was not required per the direction of Mr. Eric Bracke, CFC Traffic Engineer.
Checklist E-4 is included in this submittal.
36. Poudre School District will coordinate with the City regarding the Right -of -Way vacation and
easement dedication documents.
Topic: Utility Plans
33. Noted. Updated details have been incorporated into the Utility Plans.
35. Redline comments have been addressed and are incorporated into the Utility Plans.
Topic: Variance Request
34. We will prepare and submit a variance request letter for the Poudre School District for the existing
parking condition and minimum set back requirement.
Thank you for your review and approval of these plans and responses. If you need further clarification on
any of the above responses, please call me (419-1316) at your convenience.
Sincerely,
Nolte Assoc' , Inc.
Thomas Ochwat, P.E.
Associate Engineer
N O LT E ASSOCIATES, INC. N:\FCO227UDocwments\Letters\Respsfo20030811.doc
August 11, 2003
FCO22701
Mr. Ted Shepard
Senior Planner - Current Planning Division
City of Fort Collins
281 N. College Ave.
Fort Collins, CO 80524
BEY ON D E N G IN E E R ING
RE: Response to City of Fort Collins Comments dated April 29, May 5 and May 7, 2003
PSD — Centennial High School Expansion and Remodel
Dear Mr. Shepard:
This letter is in response to the comments received from the City of Fort Collins. Specific responses are in
the order of each comment sheet and reference the note number where applicable.
Water/Wastewater Comments
29. Site plan and Landscape plan have the same information.
30. Noted.
31. The existing water service to the site is adequate to service the proposed expansion per the
mechanical engineering consultant for the project. Per the CFC Municipal Code, Chpt. 26-94, the
school expansion meets the criteria for allowing a single water service for the additional building
structure to be serviced from the existing water service. The Utility plans have been revised to reflect
a wet tap being installed from the 6" fire service line connection within Mathews Avenue.
32. Noted. Poudre School District will coordinate with the City regarding the Right -of -Way vacation
and easement dedication documents.
Stormwater Utility Comments
Topic: Drainage
41. Please confer with Glen Schlueter and our meeting notes from our meetings on June 4te and 13'h,
2002. Our calculation regarding water quality was reviewed and acceptable at this meeting.
42. The major water quality feature for this site is the use of grass swales in addition to 100-yr. water
surface ponding and release rate.
Topic: Floodplain
39. Noted. The Activities Building has a finish floor elevation of 4987.83 compared to an existing
ground elevation of 4986.00. The present CFC flood plain limits do not impact the site. The
proposed estimated flood plain as been annotated as being "Shallow flooding of 12" or less above
existing ground."
NOLTE ASSOCIATES, INC.
1901 SHARP POINT DRIVE, SUITE A
FORT COLLINS. CO 80525
970.221.2400 TEL 970.221.2415 FAX
WWW.NOLTE.COM