Loading...
HomeMy WebLinkAboutIN-SITU - MODIFICATION OF STANDARDS - 46-02 - REPORTS - RECOMMENDATION/REPORTIn -Situ, Inc., 105 East Lincoln Avenue, Request for Modification of Two Standards, #46-02 December 19, 2002 P&Z Meeting Page 7 6. Findings of Fact and Specific Findings as per Section 2.8.2(H)(a The Code requires that for each Modification, there shall be specific findings showing how the plan will promote the general purpose of the standard for which the Modification is requested equally well or better than would a plan which complies with the standard for which the Modifications are requested. A. "Section 3.4.1(E) Establishment of Buffer Zones." The granting of the Modification would not be detrimental to the public good; and 2. The preliminary plan will promote the general purpose of the standard equally well or better than would a plan which complies with the standard for which a modification is requested. This is because the plan provides for a significant restoration within the buffer area that, while reducing the quantitative aspect of the standard, demonstratively exceeds the qualitative aspect of the standard beyond level required in the buffer zone performance standards. B. "Section 4.16(D)(3)(a)3. — Frequent Views/Access 1. The granting of the Modification would not be detrimental to the public good; and 2. The preliminary plan will promote the general purpose of the standard equally well or better than would a plan which complies with the standard for which a modification is requested. This is because the high quality of the building's architecture, combined with the ecological restoration in the buffer zone, create a healthy and compatible relationship with the river that exceeds mere compliance with the standard. RECOMMENDATION Staff recommends approval of the two Requests for Modification of Standard for In -Situ, Inc. to allow an encroachment into the Poudre River buffer area (Section 3.4.1(E)) and for the south elevation of the building to exceed 125 feet along the axis of the river (Section 4.16(D)(3)(a)3.). In -Situ, Inc., 105 East Lincoln Avenue, Request for Modification of Two Standards, #46-02 December 19, 2002 P&Z Meeting Page 6 3. The site will continue to allow 115 feet of clear vision between the river and Lincoln Avenue. 4. The relationship to the river is enhanced by the connecting walkway between the building and Poudre River Trail. This connection will encourage bicycle commuting, bike and walking trips to downtown, thus promoting alternative modes of travel. 5. The location of the building between Lincoln Avenue and the Poudre River will act as a buffer element for the benefit of the riparian ecology. The noise, fumes and activity associated with an arterial street are considered more onerous to the wildlife corridor than the relatively benign attributes of a one-story building. C. Staff Analysis 1. There are nine specific development standards in the C-C-R designed to promote sensitive development with respect to the naturalistic qualities found along the Poudre River. Taken together, these standards envision an accommodation between quality development and the ecological character of a riparian area. Staff finds that the proposed P.D.P. meets all but one of these standards and that 130 feet of additional building along the axis of the river does not impair the view or access to or from the Poudre River. 2. The south elevation of the proposed building is found to be of high quality with articulated features that contribute to a positive relationship between the built environment and the Poudre River. The view from the river to the building will be respectful. 3. The length of the south building wall continues to accomplish the main purpose of the C-C-R zone which 'is stated as follows: "The main purpose of the District is to foster a healthy and compatible relationship between the River, the Downtown and surrounding urban uses." In -Situ, Inc., 105 East Lincoln Avenue, Request for Modification of Two Standards, #46-02 December 19, 2002 P&Z Meeting Page 5. 2. As an urban infill project, the proposed employment use promotes compact urban growth without costly extension of utilities and services. The future employees would be within one -quarter mile (1,320 feet) of a variety of retail, office, services, recreational land uses. Bicycle commuting is promoted with adjacency to the Poudre River Trail. Such proximity fulfills the vision of the C-C-R zone as a walkable, mixed -use district as envisioned in City Plan. 5. Modification to Frequent Views/Access: A. Citation — "Section 4.16(D)(3)(a)3. — Frequent Views/Access This section of the Code is a development standard in Community Commercial — Poudre River zone district. The applicant is requesting a Modification to the following standard: "Buildings. Massing and Placement. Frequent View/Access. No building wall shall exceed one hundred twenty-five (125). feet on the axis along the river." The proposed building has a south elevation that is 255 feet along the axis of the Poudre River thus exceeding the standard by 130 feet. B. Applicant's Justification The applicant has provided written and graphic justification which are attached. Briefly, the justification is summarized as follows: 1. Because the operation includes light assembly of components, the building needs to be on one story for efficient work flow. If the building's axis to the river were limited to 125 feet, its shape would be a long rectangle that would be perpendicular to river resulting in a further encroachment into the buffer zone. 2. The purpose of the standard is to establish an aesthetic relationship between buildings and the Poudre River. This building is not turning its back to the river. Rather, as a company that manufacturers water testing and monitoring devices, the building is designed to embrace the river. The south elevation features windows, doors, patios and walkways that are intended to foster a harmonious relationship between employees and the Poudre River. In -Situ, Inc., 105 East Lincoln Avenue, Request for Modification of Two Standards, #46-02 December 19, 2002 P&Z Meeting Page 4 River Trail. These improvements would be a significant enhancement over the present hard -packed, weedy and denuded land that is the result of years of neglected outside storage. B. Applicant's Justification: The applicant has provided written and graphic justification which are attached. Briefly, the justification is summarized as follows: The proposal is to mitigate the loss of buffer distance required by the standard (240 — 300 feet) by enhancing the remaining buffer area to level of quality that exceeds the normal landscape requirements such as full -tree stocking, foundation shrubs, parking lot screening and other provisions of Section 3.2.1. The P.D.P. would implement the performance standards called for in Section 3.4.1(E) by restoring the old outside storage/salvage yard in a manner that is sensitive to wildlife and the riparian habitat of the Poudre River. 2. The applicant commits to removing non-native and weedy species and planting new native groundcovers, shrubs and trees that are drought - tolerant and promote wildlife activity in sufficient quality and quantity that exceeds normal requirements. 3. The applicant commits to creating a wetland that will contribute to the wildlife habitat of the Poudre River corridor. No such requirement exists in the Code. This wetland can be combined with the requirement to provide on -site extended stormwater detention to create a larger naturalistic feature that would otherwise not be required. C. Staff Analysis The P.D.P. proposes to trade low value buffer distance for high value wildlife and ecological enhancement. In evaluating this design, Staff finds that the site is in such a state of sterility that merely complying with the standard buffer distance and normal landscaping requirements would be a disservice to the riparian ecology of the Poudre River. The high level of naturalistic enhancement constitutes a significant restoration effort that goes above and beyond normal development practice. In -Situ, Inc., 105 East Lincoln Avenue, Request for Modification of Two Standards, #46-02 December 19, 2002 P&Z Meeting Page 3 4. . Modification to Buffer Zone Performance Standards: A. Citation - "Section 3.4.1(E) Establishment of Buffer Zones." The applicant is requesting a Modification to the following standard: Section 3.4.1(E) — Establishment of Buffer Zones For every development subject to this Division, the applicant shall propose, and the decision maker shall approve, on the project development plan buffer zone(s) surrounding natural habitats and features. The purpose of the buffer zones is to protect the ecological character of the natural habitat or natural feature from the impacts of the ongoing activity associated with the development. The standard requires a buffer zone of 300 feet from the Poudre River, as measured from top of bank. The applicant, however, is proposing to reduce the buffer area in a manner such that the buffer ranges from 220 feet on the east property line to 150 feet on the west on the west property line. The encroachment ranges, therefore, from 80 feet on the east to 150 feet on the west. The standard allows a 20% reduction in the buffer distance. Using 240 feet as the buffer distance, the encroachment ranges from 20 feet on the east to 90 feet on the west. Buffer East Encroach- % West Encroach- % Std. P.L. ment P.L. ment 300' 220' 80' 27% 150' 150' 50% 240' 220' 20' 7% 150' 90, 30% As mitigation for reducing the buffer, the applicant proposes to establish a naturalistic zone between the building and the top of bank. This area will feature a variety of native groundcover, shrubs and trees. In addition, a small wetland will be created. A connecting walkway would link the building to the Poudre In -Situ, Inc., 105 East Lincoln Avenue, Request for Modification of Two Standards, #46-02 December 19, 2002 P&Z Meeting Page 2 COMMENTS: 1. Background: The surrounding zoning and land uses are as follows: N: R-L; Existing Single Family Neighborhood (Buckingham) S: P-O-L; Poudre River Trail, Poudre River and Udall Natural Area E: C-C-R; Existing Office and Outside Storage for a Construction Company W: C-C-R; Existing Office and Outside Storage for an Oil Company The site was long used by Poudre Valley Creamery as an outside storage yard. A 1984 aerial photograph reveals that about 40 semi -trailers and old milk trucks were stored on the site in a salvage yard type manner. Over the years, abandoned vehicles and miscellaneous equipment have been removed. The area is presently vacant and largely denuded with the exception of two young Cottonwood trees. 2. Preliminary Ecological Characterization Study: A Preliminary Ecological Characterization Study was performed in September of this year (see attached). The site does not support any natural communities, habitats, or native vegetation except for two young Cottonwoods along the southern edge. The remaining vegetation consists of non-native grasses and annual weedy species. No vegetation, soils, or hydrologic evidence of wetlands are present. The site does not provide any suitable habitat for Ute Ladies' - Tresses Orchid or Preble's Jumping Mouse. 3. Preliminary Plan: The Modification Requests are accompanied by a preliminary plan that indicates a 41,625 square foot, one-story building, designated for office and custom small industry. These are permitted uses in the C-C-R zone subject to administrative review. The building layout respects the build -to line along Lincoln and the proposed parking is under the maximum allowed. A sidewalk would connect the south side of the building to the Poudre River Trail. ITEM NO. 5 MEETING DATE 12/19/02 STAFF Ted Shepard Citv of Fort Collins PLANNING AND ZONING BOARD STAFF REPORT PROJECT: In -Situ, Inc., 105 East Lincoln Avenue, Request for Modification of Two Standards, #46-02 APPLICANT: Craig and Chris McKee c/o V-F Ripley and Associates 401 West Mountain Avenue Fort Collins, CO 80521 OWNER: Craig and Chris McKee In -Situ, Inc. P.O. Box I Laramie, WY 82073 PROJECT DESCRIPTION: This is a Request for a Modification of Two Standards: Section 3.4.1(E)(2), Buffer Zone Performance Standards and Section 4.16(D)(3)(a)(3.) and Buildings — Frequent Views/Access. The proposed structure encroaches into the Poudre River buffer zone more than the allowable 20%. The length of the structure parallel to the Poudre River exceeds the maximum of 125 feet. The site is approximately four acres in size located at 105 East Lincoln Street on the south side of the street, between Alliance Construction and Team Petroleum. The site is directly north of the Poudre River and zoned C-C-R, Community Commercial - Poudre River. RECOMMENDATION: Approval EXECUTIVE SUMMARY: This is a "stand-alone" Request for Two Modifications as allowed by Section 2.8.2. The Modifications are accompanied by a preliminary plan and a preliminary Ecological Characterization Study for background and clarification purposes only. The applicant has provided a justification for the Modifications. Staff has analyzed the two requests and justifications and finds that the Modifications comply with the criteria for granting such requests. COMMUNITY PLANNING AND ENVIRONMENTAL SERVICES 281 N. College Ave. PO. Box 580 Fort Collins, CO 80522-0580 (970) 221-6750 PLANNING DEPARTMENT