Please correct the street name from Lake Park Drive ,o P rklcke Drive on ell plan sets
Department: Zoning Issue Contact: Jenny Nuckois
Topic: General
1
On the enlarged equipment plan - page Z 1.0 - note the heignr of the fence
Be sure and return all of your redlined plans when you re -submit.
If you have any questions regarding these issues cr any other issues related to this project,
please feel free to call me at (970) 221-6750.
Yours Truly,
BOB BARKEEN
City Planner
Page 2
Oct-21-02 07:56A
P_02
6aSTAFF PROJECT REVIEW/
laity of Incl (�tlins
SPRINT PCS - STARBRIDGE COMMUNICATIONS Date: 10/21/2002
MIKE O'GRADY/STEVE OLSON
4255 KITTREDGE STREET, ;#1828
DENVER, CO 80239
Staff has reviewed your submittal for LAKE SHERWCOD WTE, and we offer the following
comments:
ISSUES:
Department: Current Planning Issue Contact: Bob Barkeen
Topic: General
10
The enclosed area will need to fully landscaped and screened from view from the adjacent street and any
future pedestrian or blcycie trails. Additional landscaping racy ce needed around the perimeter of the
enclosure.
Department: Engineering Issue Contact: Dave Stringer
Topic: General
2
Lake Park Drhe reconstructed in t998. Cutting of 'this street will incur sutwontiai street cut tees. Recomrner.
baring street to ins,alf needBa Utilities. 14 street is cut, then 1 need io see a plan stating so and showing limits W
repair area for street C,t1tS
Department: Light & Power Issue Contact: Alan Rutz
Topic: General
3
Transformer on Lakeshure Circle is not sized to serve a wireless tower. Anew transformer will need to be
installed neon the tower site. Sprint to provide ROW or easer-ent for -he now transformer. Contact Light ana
Power immediately to coordinare new tronsformer location.
4
Will need a Commercial Service Form (C-1) to show food requirements.
5
Meter must be placed outside of fence or visible through fence for Teter reacing.
6
Contact Light and Power for charges to install new primary and transformer for the proposed site.
Department: PFA Issue Contact: Michael Chavez
Topic: General
7
After reviewing PFA has no comment.
Department: Transportation Planning Issue Contact: Tom Reiff
Topic: General
8
?he planned UP Regional Trail is aligned within the utiiif easement through ihls stretch berween Droke and
Norsetooth. P!eose identify the approximate location to assure Gnct the equipment crea doesn't conflict with
the trail location.
PaF-c I
Transportation Planning
Applicant has moved the equipment area five feet to the west, at the request
and direction of Jeff Lakey, to accommodate the planned UP Regional Trail
alignment as shown on Z1.0. The street name has been corrected from Lake
Park Drive to Parklake Drive on all plan sets.
Zoning
The height of the fence has been noted on the enlarged equipment plan, page
Z1.0.
This concludes the comments made by staff regarding the Lake Sherwood WTE.
12.10.02
TO: Bob Barkeen
FR: Steve Olson/Mike O'Grady
RE: Lake Sherwood WTE — Sprint PCS
Mr. Barkeen —
This letter addresses staff comments, dated 10.21.02, regarding our Lake
Sherwood WTE submittal.
Current Zoning
Existing landscaping provides screening of the enclosed area from the adjacent
street. Additional landscaping has been added to further screen the enclosed
area from the planned pedestrian/bike trail.
Engineering
The recommendation for street boring to install needed utilities has been duly
noted. If street cutting is required, a street cutting plan showing limits of repair
area for street cuts will be submitted.
Light & Power
A new transformer providing power to the site is shown on Z1.0 and Z2.0. A
legal description of the proposed power easement is described on C1.0. Location
and placement of the new transformer will be coordinated with Light and Power.
A Commercial Service Form (C-1) will be submitted with the application for
Building Permit showing load requirements. A meter will be placed outside the
fence for meter reading as shown on Z1.0. Light and Power will be contacted
regarding charges to install new primary and transformer for the proposed site.