Loading...
HomeMy WebLinkAboutLAKE SHERWOOD WTE - PDP - 40-02 - CORRESPONDENCE -9 Please correct the street name from Lake Park Drive to Parklake Drive on all plan sets. Department: Zoning Issue Contact: Jenny Nuckols Topic: General 1 On the enlarged equipment plan - page Z1.0 - note the height of the fence Be sure and return all of your redlined plans when you re -submit. If you have any questions regarding these issues or any other issues related to this project, please feel free to call me at (970) 221-6750. Yours Truly, BOB BARKEEN City Planner Page 2 6aSTAFF PROJECT REVIEW Citv of Fort Collins SPRINT PCS - STARBRIDGE COMMUNICATIONS Date: 10/21/2002 MIKE O'GRADY/STEVE OLSON 4255 KITTREDGE STREET, #1828 DENVER, CO 80239 Staff has reviewed your submittal for LAKE SHERWOOD WTE, and we offer the following comments: ISSUES: Department: Current Planning Issue Contact: Bob Barkeen Topic: General 10 The enclosed area will need to fully landscaped and screened from view from the adjacent street and any future pedestrian or bicycle trails. Additional landscaping may be needed around the perimeter of the enclosure. Department: Engineering Issue Contact: Dave Stringer Topic: General 2 Lake Park Drive reconstructed in 1998. Cutting of this street will incur substantial street cut fees. Recommend boring street to install needed utilities. If street is cut, then I need to see a plan stating so and showing limits of repair area for street cuts Department: Light & Power Issue Contact: Alan Rutz Topic: General 3 Transformer on Lakeshore Circle is not sized to serve a wireless tower. A new transformer will need to be installed near the tower site. Sprint to provide ROW or easement for the new transformer. Contact Light and Power immediately to coordinate new transformer location. 4 Will need a Commercial Service Form (C-1) to show load requirements. 5 Meter must be placed outside of fence or visible through fence for meter reading 6 Contact Light and Power for charges to install new primary and transformer for the proposed site. Department: PFA Issue Contact: Michael Chavez Topic: General 7 After reviewing PFA has no comment. Department: Transportation Planning Issue Contact: Tom Reiff Topic: General 8 The planned UP Regional Trail is aligned within the utility easement through this stretch between Drake and Horsetooth. Please identify the approximate location to assure that the equipment area doesnl conflict with the trail location. Page 1