HomeMy WebLinkAbout419 W. MOUNTAIN AVE. - MAJOR AMENDMENT - 42-02 - SUBMITTAL DOCUMENTS - ROUND 2 - ROUTING SHEETi
Traf he Operations:
�—�c;c, P ,(�k,,
Date: 2-
Items Requested
Site land Plat Utility Drainage R t I Other Items 8c uircd
Redlined Items Being Returned
Site land I Plat Utlllq I Drainage R t Other Items Being Returned
Engineering
Wrmwater,�A
Rattr/Waittwattt
X
Tralic Operations
Trans. Planning
Transfort
—
--
Natural Resources
_
Park Planning
Totals
z
Other:
Note: All redlined items should be returned with the resubmittal/ revisions.
i
Revisions Routing Sheet -
• it
a
1
000�0000�0EN
ENGINEERING: PAVEMENT
Elm
--..-.--.a-
• 1
0m0
0
MEN
1 11 1 •
-IN
IN
------
• •
--�-----.---_
IN
IN
FCLWD/ELCO/BOXELDER
IN
.---..MIN
M_
• •
IN
IN
Elm
IN MEN
MIN
IN
• •
-----.-------
WATERCONSERVATION
IN
IN
-0----_
• • •
--�--��------
-Elm
IN
---.--
PUBUC SERVICE
IN
MmMM
SCHOOLS: • 1RE /THOMPSON-_---...--IM.--
®
0
0INNIE
IN
STATE HIGHWAY DEPARTMENT
IN
MMMMM
1 •
--.-------.-_
1 • 1
----------.-_
' 1 • ...
IN
IN
------_
�IN�M0MM=Ms
iii���MMmMmMMl
MOMMINMEN
WIN
ElmiiiiiilM
��_��NIM__MMMEN