Loading...
HomeMy WebLinkAboutHOWES/CANYON MIXED-USE (CORTINA) - FDP - 45-02A - CORRESPONDENCE - (5)2. Larimer County sediment/erosion control notes should be changed to City of Fort Collins Standard erosion control notes (latest revision). Department: Water Wastewater Issue Contact: Jeff Hill Topic: General Number: 127 Created: 9/22/2003 (11 /3/03) Please provide copies of the site and landscape plans for our review with the next submittal. Coordinate landscape and site plan to reflect the some information shown on the utility plans (i.e. layout of plaza). Number: 130 Created: 9/22/2003 (11 /3/03) There is some concern that the location shown for the fire line and water service is not the location of the mechanical room for this building. Coordinate the location of the fire line and water services with the architect to assure they project into the mechanical room from the street. See site, landscape and utility plans for other comments. Department: Water Wastewater Issue Contact: Roger Buffington Topic: Utility plans Number: 152 Created: 11 /6/2003 (11/6/03) The trench drain at the bottom of the drive entrance to the parking garage may NOT discharge to the sanitary sewer. Redline drawings are available at the Current Planning front desk. Be sure and return all of your redlined plans when you re -submit. If you have any questions regarding these issues or any other issues related to this project, please feel free to call me at (970) 221-6750. Yours Truly, Bob Barkeen City Planner Page 3 Number: 132 Created: 9/22/2003 [11/4/03) A variance request and further detail is still needed for this non-standard driveway approach section. How will the transitions at the pan widening be constructed? What is shown does not match any City of Fort Collins standard, but from what is shown, the variance would be supported. Again, please note on the plans that this curb cannot be altered in the future. Also, FYI, the slopes shown for the driveway are acceptable. Original comment: Since the proposed drive -over curb and gutter does not match a standard detail, please submit a detail drawing and variance request. Also, please note on the plans that this curb can never be altered due to stormwater problems (further elaboration may be needed on the plans). Number: 147 Created: 11 /4/2003 (11/4/03) Please call out the distance from flowline to flowline on Canyon, as well as the distance from the edge of parking stalls to the east flowline on Canyon. Topic: Landscape plan Number: 140 Created: 9/23/2003 (11 /4/03) Now that the outlines have been shown, it appears that one of the existing trees on Canyon will not be outside of this 7' area. Please note on the plans to contact the City Forester regarding tree protection prior to construction. Original comment: Please show the outlines of the underground storage units and note that no excavation will be allowed within 7' of the center of any trees (per the City Forester). Number: 142 Created: 9/23/2003 (11/4/03) Now only one is shown, but it doesn't match the one shown on the utility plans. Please coordinate. Original comment: The landscape plan shows two different stormpipe layouts. Please show only the correct one. Topic: Overall Utility Plan Number: 83 Created: 3/3/2003 (11 /4/03) Repeat of original comment: Please show where the drain that collects the water from the driveway down to the underground parking will drain to. Repeat 4.15.03 Department: Natural Resources Topic: General Number: 151 (11/6/03) No Issues. Department: Stormwater Utility Issue Contact: Doug Moore Created: 11 /6/2003 Issue Contact: Wes Lamarque Topic: Drainage Number: 149 Created: 11 /5/2003 There needs to be more detail and literature for the flood gate as well as detail regarding how this gate will function with the retaining wall and other site characteristics. City staff still has concerns with this issue. Number: 150 Created: 11 /5/2003 There still needs to be clarification on where the drainage from the drive ramp is going to be directed, storm or sanitary sewer. Topic: Erosion/Sediment Control Number: 153 Created: 11 /6/2003 The plan now shows silt fencing in the pavement on Canyon. I don't think you can install silt fencing in asphalt. This silt fencing also appears to be open-ended on the downstream end, which would allow all collected sediments to be transported offsite. Page 2 STAFF PROJECT REVIEW City of Fort Collins VF RIPLEY ASSOC CATHY MATHIS 401 W. MOUNTAIN AVE. #201 FT. COLLINS, CO 80521 Date: 11 /7/2003 Staff has reviewed your submittal for HOWES/CANYON MIXED -USE PDP - TYPE II (LUC) & FINAL COMPLIANCE, and we offer the following comments: Prior to resubmitting the plans, the applicants shall contact the Current Planning Department to set up a meeting with Engineering, Stormwater, and Water/Wastewater to review the floodwall and any other remaining issues. ISSUES: Department: Engineering Topic: Flood Wall Issue Contact: Katie Moore Number: 145 Created: 11 /4/2003 (1114103) Please provide further detail for the flood wall, including dimensions and how it works with the retaining walls. Please provide the manufacturer's information and recommended installation. After reviewing this information it will be determined what else needs to be shown on the plans. How does it get drained? Where will the water drain to? Will there be a groove in the retaining wall for the flood wall and will it be a waterproof seal? What materials is it made from? Is 10" a high enough wall? Etc. Also, call out the concrete thickness of the cross -pan on the cross-section as 8" minimum. Number: 146 Created: 11 /4/2003 (1114103) Please be sure to show the flood wall location on all plans. Topic: General Number: 36 Created: 12/11 /2002 (11 /4/03) Repeat of original comment: Please see redlines and utility plan checklist for any additional comments. 3.3.03 - repeat 4.15.03 - repeat Number: 99 Created: 3/6/2003 (1114103) Repeat of original comment: Where will the roof drains outlet? Please note that they will not be allowed to outlet over a public sidewalk - under -walk drains would be required. 4.15.03 - repeat Number: 100 Created: 3/6/2003 (11/4/031 Please submit a copy of the structural calculations for the storage in the ROW for city files. Also, please add the standard city signature block to the plan sheets and submit the sheets on mylar for signature along with the rest of the mylars (as part of the utility plan set). The final paper copies for City files will need to be signed and stamped by a Colorado PE, just like the rest of the utility plan sheets. Original comment: If under -ROW storage is approved, please provide detailed plans for it, 4.15.03 - A detailed structural design will be required prior to plan approval. 9.22.03 - A very preliminary design was submitted prior to the lease approval going before Council, but this design needs to be completed and resubmitted for review. Number: 117 Created: 5/1/2003 (11 /4/03) Repeat of original comment: Please show where the perimeter drainage system/sump pit will outlet, and show the location of the sump pit. Page 1