HomeMy WebLinkAboutHOWES/CANYON MIXED-USE (CORTINA) - FDP - 45-02A - SUBMITTAL DOCUMENTS - ROUND 3 - ROUTING SHEETProJect: weJ/Cunu6r) % iy-d u (AK- - ObrhLc) Date: 12.17- o3
Planner: �bTratlic Operations:
Engineer: �_�- fin -ooze.,
Items Requested
Site land Plat Utility Drainage fl t Other Items Required
Redlined Items Being Returned
Site land Plat Utility Drainage R t Other Items Being Returned
Engineering
_
itormwater
Water/Wastewate
j
f
xnA
TrafDc Operations
Trans. Planning
_
Tranilbrt
Natural Resources
_
Park Planning
Totals
Other:
Note: All redlined items should be returned with the resubmlttal/ revislons.
Project Name: ( ` C\' cu ) � File #:
(mmicaftwaft-4 WX4A•,(\k7e >
City of Fort
Collins FINAL COMPLIANCE ROUTING SHEET tAkak","
THIS PROJECT HAS BEEN SCHEDULED FOR PUBLIC HEARING ON . THE FOLLOWING TABLE LISTS
SUBMITTAL REQUIREMENTS FOR FINAL COMPLIANCE FOR THIS PROJECT.
A FINAL COMPLIANCE FEE OF $1000.00 IS REQUIRED AT THE TIME OF SUBMITTAL UNLESS OTHERWISE WAIVED OR REDUCED
FEE WAIVER/REDUCTION APPROVAL AMOUNT DATE
d
F-
w
%O
�a�z�'
wQOPP,
ztr
O
W r
i x
r
FZ
ww
FILE: PROJECT PLANNER
ENGINEERING
�-
ZONING
BUILDING INSPECTION
LIGHT & POWER
TECHNICAL SERVICES
STORMWATER
WATER & WASTEWATER/FCLD
TRAFFIC OPERATIONS
TRANSPORTATION PLANNING
NATURAL RESOURCES
ADVANCE PLANNING
TOTAL
CITY PLANNER: DATE
' C
Z
DEVELOPMENT REVIEW ENGINEER: DATE