HomeMy WebLinkAboutHOWES/CANYON MIXED-USE (CORTINA) - PDP - 45-02 - REPORTS - RECOMMENDATION/REPORT (3)Canyon/Howes, Project Development Plan #45-02
Type II Planning and Zoning Board Review
Page 13
6. The Project Development Plan complies with all applicable development
standards contained within Article 3 of the Land Use Code.
RECOMMENDATION: Staff recommends the Planning and Zoning Board approve
the Canyon/Howes modification request to Section 4.12(E)(1)(a)(1) and the project
development plan, File #45-02, subject to the following conditions:
Grading shall be limited within 7 feet of the center of the trunk of existing
mature trees to remain on the site.
2. A lease agreement for all underground building structures which encroach
within the adjacent public right-of-way shall be subject to approval by City
Council. This agreement must be in place prior to approval of the Final
Compliance and Utility Plans
Canyon/Howes, Project Development Plan #45-02
Type II Planning and Zoning Board Review
Page 12
5. Neighborhood Information Meeting
A neighborhood meeting was held on November 14, 2002 at 215 North
Mason Street. There were approximately 7 neighbors in attendance at this
meeting. Particular items of concern expressed by the neighbors are:
Concern over the increase in on -street parking within the
neighborhood. Would like to explore if Canyon and Howes could be
converted to two-hour parking.
Would like to make sure that Canyon Avenue remains as an open
street.
Would like to see the mechanical building reduced in height if at all
possible.
In general, the neighbors liked the project and believed the mixed -
use aspect would increase the livability of downtown and the safety
of downtown.
FINDINGS OF FACT/CONCLUSIONS
After reviewing the Canyon/Howes Project Development Plan #45-02, staff makes the
following findings of fact and conclusions:
1. The granting of the modification would not be detrimental to the public
good.
2. The request for a modification to the Land Use Code are subject to review
by the Planning and Zoning Board.
3. Granting the requested modification to Section 4.12(E)(1)(a)(1) will
promote the general purpose of the standard for which the modification is
requested equally well or better than would a plan which complies with the
standard because the setback along Howes Street would have to be
setback 21 feet from the back of the right-of-way.
4. The proposed land uses are permitted in the Downtown, Canyon Avenue
Subdistrict.
5. The Project Development Plan complies with all applicable district
standards of Section 4.12 of the Land Use Code, Downtown Zone District.
Canyon/Howes, Project Development Plan #45-02
Type II Planning and Zoning Board Review
Page 11
2. Applicant's Request
A. Applicant's Justification for 4.12(E)(1)(a)(1)
Promote the General Purpose of the Standard.
Both Sections 3.5.3(B)(2)(b) and 4.12(D)(2) encourage buildings to be
located as close to the front right-of-way as possible, especially if the
adjacent street provides on -street parking. The intent of the downtown
zone district is to bring buildings closer to the street, to create a mix of
activity within the area, while providing for quality development that
maintains a sense of history, human scale and pedestrian -oriented
character. Bringing the building to the sidewalk will provide the
character and design that the downtown district is intending to do. The
building itself has been designed to provide pedestrians with a unique
street front experience. This would not be possible if the building
adhered to the strict compliance with this Section.
This project will promote the policies included within City Plan,
including Policy LU-1.1 Compact Urban Form, LU-2.2 Urban Design,
T-5.1 Land Use, T-7.1 Pedestrian Facilities, CAD-1.3 Streetscape
Design, DD-1.5 Housing, DD-1.15 Housing and DD-5.5 Parking Lots.
3. EVALUATION OF MODIFICATION REQUEST
A. Staffs Evaluation of 4.22(D)(2)
Substantial Benefit to the City.
Staff has reviewed the materials submitted as part of the modification
request. The policies within City Plan do promote a pedestrian character
within the downtown area. This block is a transition block that includes
buildings setback from the right-of-way to buildings that face directly onto
the adjacent sidewalk. Had the building been setback from the back of the
sidewalk as suggested by the setback regulation, the pedestrian
environment would not be achieved, resulting in more of a suburban
design, which is inconsistent with the Downtown Plan.
The building has been designed with a staggered setback at the southeast
corner of the building, adjacent to the existing buildings along Howes
Street. This will help to gradually change the setback from the existing
buildings to the new structure and prevent an abrupt change along the
block by transitioning the setback.
Canyon/Howes, Project Development Plan #45-02
Type II Planning and Zoning Board Review
Page 10
2. Section 3.7.3, Adequate Public Facilities
The provision of adequate public facilities for transportation, water,
wastewater, storm drainage, fire and emergency services, and
electrical power will be in place prior to the issuance of a building
permit, or adequate security posted for any such improvement not
in place prior to the issuance of a building permit.
4. Modification Request
1. Division 2.8 Modification of Standards
As specified in the LUC Section 2.8.2 Modification Review Procedures (H)
(Standards), the Planning and Zoning Board shall review, consider, and approve,
approve with conditions, or deny an application for a modification based upon:
"... granting of the modification would not be detrimental to the public
good; and that:
the plan as submitted will advance or protect the public interests and
purposes of the standard for which the modification is requested equally
well or better than would a plan which complies with the standard for
which a modification is requested; or
The granting of a modification from the strict application of any standard
would, without impairing the intent and purpose of this Land Use Code,
substantially alleviate an existing, defined and described problem of city-wide
concern or would result in a substantial benefit to the city by reason of
the fact that the proposed project would substantially address an
important community need specifically and expressly defined and
described in the City's Comprehensive Plan, adopted policy, ordinance or
resolution of the City Council, and the strict application of such a standard
would render the project practically infeasible, or
By reason of exceptional physical conditions or other extraordinary and
exceptional situations, unique to such property, including , but not limited to,
physical conditions such as exceptional narrowness, shallowness or
topography, or physical conditions which hinder the owner's ability to install a
solar energy system, the strict application of the standard sought to be
modified would result in unusual and exceptional practical difficulties, or
exceptional or undue hardship upon the owner of such property, provided
that such difficulties or hardship are not caused by the act or omission of the
applicant"
Canyon/Howes, Project Development Plan #45-02
Type II Planning and Zoning Board Review
Page 9
2. Section 3.5.3, Mixed -Use Institutional and Commercial Buildings.
At least one main entrance to the building shall face and open
directly onto a connecting walkway with pedestrian frontage. Since
the Canyon/Howes building is directly adjacent to the public
sidewalk, all of the public building entrances face directly onto the
sidewalk.
The building has been designed to visually break up the height and
mass of the building. At the top of the first two stories is a horizontal
projection and change of materials. The top of the fifth story
includes another projection. The sixth story is partially setback from
the face of the building, and includes a variety of roof forms and
gable treatments. The building includes a variety of wall
articulations and projections on both the Canyon Avenue, Howes
Street and rear facades.
E. Division 3.6, Transportation and Circulation
Section 3.6.1, Master Street Plan
This PDP is in substantial compliance with the City of Fort Collins
Streets Master Plan.
2. Section 3.6.4, Transportation Level of Service Requirements
The applicant for this project conducted a Transportation Impact
Study. The study concluded that the Canyon/Howes PDP will
generate a total of 38 morning peak hour trips, 39 evening peak
hour trips, and 330 total daily trips. These additional trips will fall
within the accepted ranges of the City's Level of Service Standards.
The report concluded that all intersections impacted by the project
will continue to operate acceptably, and the pedestrian, bicycle and
transit levels of service will operate at acceptable levels of service.
3. Section 3.6.6, Emergency Access
The buildings will be located within 150 feet of the internal street.
The individual residential units will include fire sprinklers.
F. Division 3.7, Compact Urban Growth Standards
1. Section 3.7.2, Contiguity
The project is located within the Infill Area of the City of Fort Collins.
Canyon/Howes, Project Development Plan #45-02
Type II Planning and Zoning Board Review
Page 8
encourage creativity and diversity of architecture and site design
within a context of harmonious neighborhood planning and
coherent environmental design, to protect sunlight, to preserve
desirable views and to define and reinforce downtown and
designated activity centers.
Desirable views of the foothills, mountains or significant landmarks
from public spaces, streets and parks should be maintained. Due to
its downtown location, the Canyon/Howes project will not impact
views to the west, since these views have already disappeared.
The view to the southwest to Horsetooth Rock from the new
Larimer County Office Building will remain. This view corridor is
along Canyon Avenue.
A shadow analysis was completed by the applicant which used the
time frames included in Section 3.2.3 Solar Access, Orientation,
Shading. This Section evaluates impacts on adjacent properties
based on shadow caste at 9:00 am through 3:OOpm, on December
21. This shadow analysis shows the adjacent single story building
west of Canyon Avenue within the shadow of the Canyon/Howes
building at 9:00 am, on December 21. The building completely
leaves the shadow of the proposed building by 11:30 am. No other
buildings are impacts by the building's shadow. Staff is of the
opinion that this limited time the building to the west is within the.
shadow is consistent with the intent of Section 3.5.1(G), which
limits the amount of shadow cast on adjacent properties to no more
than three months of the year.
Building design should limit infringement on the privacy of adjacent
public and private property, particularly adjacent residential areas
and parks. While there are no public parks within the vicinity, there
is a single family residence two lots south of the proposed project.
The south side of the proposed building does include outdoor
balconies. Given the context of the project location, and the
likelihood of the remaining single family residence changing to a
non-residential use, staff is of the opinion that the intent of this
section has been meant by the Canyon/Howes project.
Mechanical equipment for the building is located in a small building
at the southwest corner of the property. This building encloses the
equipment, and limits the amount of equipment which would
otherwise be located on the roof of the building.
Canyon/Howes, Project Development Plan #45-02
Type II Planning and Zoning Board Review
Page 7
D. Division 3.5, Building Standards
1. Section 3.5.1, Building and Project Compatibility
Any new development next to existing developed areas must be
designed to be complimentary with those structures. The use of
repetitive building elements such as building mass, windows, roof
lines, must have a similar relation to the street and materials.
Buildings should also be similar in size and height, or, if larger, be
articulated and subdivided into massing that is proportional to the
mass and scale of other structures on the same block.
The project is located within the downtown of Fort Collins. The
adjacent lots include a variety of building height and mass. The
building to the north of the site is a twelve story building, the
building to the west of the site is eight stories in height, the building
to the east is three stories in height, and the building to the south is
two stories in height. Based on the downtown location, and the
adjacent buildings, staff is of the opinion that the building height
and mass is compatible with the existing development adjacent to
this project.
The building materials will consist of stone, stucco, glass and tile.
(roof). These materials are similar to other buildings within the area.
The architectural style includes Mediterranean forms. Other
buildings within the area are either post-modern in design or
historic, such as the existing buildings south of the site. The
proposed building has generous storefront windows along the
Canyon Avenue and Howes Street.
The PDP is not proposing any outdoor storage or loading areas, all
trash collection areas are greater than 20 feet from public
transportation facilities.
The building color includes natural stone on the lower two floors,
with the upper floors painted an ocher color. The building includes
white and black trim/accent features.
Section 3.5.1(G)(1) Building Height Review
Any new building in excess of four stories in height within the
Downtown district is subject to the criteria within Section 3.5.1
Building and Project Compatibility. Section 3.5.1(G)(1) specifically
addresses building height. The purpose of this section is to
Canyon/Howes, Project Development Plan #45-02
Type II Planning and Zoning Board Review
Page 6
the Land Use Code. Since this is not a surface lot, it does not need
to meet the landscaping standards for parking lots. Residential
uses require a minimum number of off-street parking spaces be
provided within the lot that they are intended to serve, and is based
on the number of bedrooms within each unit. The Canyon/Howes
project includes 20 residential units, 6 of which are one -bedroom
units, 11 two -bedroom units, and three, three bedroom units. With a
ratio of 1.5 spaces for each single room unit, 1.75 spaces for each
two -bedroom unit, and 2 spaces for each three bedroom unit, a
total of 34 spaces are required.
The office and visitor parking is located in the surface lot. This lot
provides eight standard spaces, and has been designed to meet
the dimensional standards required within the Land Use Code. Off-
street parking requirements for office and retail uses is based on a
maximum permitted spaces within a project. The maximum number
of off-street parking spaces for office is three spaces for each 1,000
sq.ft. of floor area. The two lower floor areas total 22,706 sq.ft. This
would yield a maximum number of spaces of 68.
3. Section 3.2.4, Site Lighting
The site plan does not propose any pole mounted exterior lighting.
All exterior lighting will be wall mounted, and will be shielded to
prevent glare or light spillage from the property. All site lighting
within this project must meet City standards for exterior lighting.
C. Division 3.4, Environmental, Natural Area, Recreational and Cultural
Resource Protection Standards
1. Section 3.4.1, Natural Habitats and Features
The property is not located within a mapped natural area, nor does
it contain any natural features.
Due to the nature of the project, on site water quality detention will
not be provided.
2. Section 3.4.7 Historic and Cultural Resources.
The existing building on the site is not eligible for local landmark
designation. This building will be razed prior to development.
Canyon/Howes, Project Development Plan #45-02
Type II Planning and Zoning Board Review
Page 5
1. Section 3.2.1, Landscaping and Tree Protection
Landscaping has been provided in all areas which will not be
included in parking areas, drives or building footprints. The
landscape plan provides a variety of canopy trees, ornamental
trees, shrubs and ground covers. The landscape plan has been
designed to use plants to enhance building design, soften walls and
enhance the urban character of this project. All plant materials are
of adequate size and diversity as required by this section. The
landscape plan is in compliance with the City's water conservation
standards.
There are several existing trees within the existing 'parkway'
adjacent to the lot. All of the mature trees will remain. There are
four smaller hackberry trees along Canyon Avenue which will be
relocated. One of the trees will be moved to the parkway south of
the maintenance building. The other three will be relocated off -site.
The applicant has worked closely with the City Forester to ensure
the existing mature trees remain. A condition has been added to
the PDP which would limit grading around the trees (where the
building is to be located) to within 7 feet of the center of the tree.
This will help maintain the tree's health through the construction
period.
Sight distance will be maintained along all parking lot entrances, as
well as the corner of Canyon Avenue and Howes Street.
A trash enclosures will provide screening of trash collection areas
within the project. This enclosure is located at the southeast corner
of the surface parking lot.
2. Section 3.2.2, Access, Circulation and Parking
The building is accessed directly by the public sidewalks along
Howes Street and Canyon Avenue. Sidewalks connecting the
parking lot to the building and the adjacent public sidewalk also
access the small surface lot. All walkways are of the minimum width
necessary to serve their function.
The parking for the residential units is located below ground and is
accessed off of Canyon Avenue. This lot includes 36 spaces, 34
regular spaces and two handicap spaces. The spaces and drive
aisles have been designed to meet the dimensional criteria within
Canyon/Howes, Project Development Plan #45-02
Type II Planning and Zoning Board Review
Page 4
The maximum building height within the Canyon Avenue subdistrict is 168
feet. The proposed building is six stories, with a total height of 81 feet. Any
building greater than 56 feet in height must be reviewed by the Planning
and Zoning Board, and is subject to the standards within Section 3.5.1.
Building and Project Compatibility.
D. Section 4.12(E)(2) Facades
The street level fagade treatment includes windows, storefronts and
recessed entries. The main entrance to the residential is at the very corner
of Canyon Avenue and Howes Street. The lower level has been integrated
into the upper stories of the building.
The building design includes outdoor balconies and a large public space
at the very front of the building at the corner of Canyon Avenue and
Howes Street. These spaces will promote outdoor activity.
The building includes gabled roof elements. Gabled roofs are prominent
within the area immediately adjacent to the site.
The ground floor display windows are framed by surrounding wall
elements and do not exceed 75% of the total ground level fagade area.
E. Section 4.12(E)(3) Site Design
Parking lots shall be located behind buildings, in the interior of the blocks,
in side yards, under ground or within parking structures. The residential
parking is located below the building within an underground parking lot.
The access to this lot will be from Canyon Avenue. The ramp is located
within the public right-of-way. Parking for the office/retail uses will be
within a small surface lot south of the building. This lot is partially
screened by a small mechanical building and the main building. This lot
will take access off of Canyon Avenue as well.
Outdoor spaces shall be placed next to activity that generates the users.
The site plan includes a new plaza area at the corner of Canyon and
Howes. This is next to the main entrance to the building.
3. Article 3 of the Land Use Code — General Development Standards
The Project Development Plan complies with all applicable General Development
Standards as follows:
A. Division 3.2,1 Site Planning and Design Standards
Canyon/Howes, Project Development Plan #45-02
Type II Planning and Zoning Board Review
Page 3
The PDP meets the applicable Land Use Standards as follows:
A. Section 4.12(D)(1) Floor Area
The total floor area of the building is 98,723 sq.ft. All new buildings greater
than 50,000 sq.ft. of floor area are subject to Planning and Zoning Board
Review.
B. Section 4.12(D)(2) Dimensional Standards
Lot Size — The Canyon/Howes PDP is proposed on an 18,274 sq.ft.
lot. There is no minimum lot size within the Canyon Avenue
subdistrict.
Lot width — The Canyon/Howes PDP is proposed on a triangular
shaped lot, with dimensions of 165 feet (east), 233 feet (west) and
165 feet (south). Staff is of the opinion the minimum lot size has
been satisfied by the project.
Maximum Building coverage — The maximum building coverage
permissible within the Canyon Avenue subdistrict is 75%. The
project proposes a maximum of 67% building coverage, less than
the.
Maximum FAR — The maximum FAR for the Canyon/Avenue
subdistrict is 5. Buildings that include residential uses do not count
floors dedicated for residential uses. The Canyon/Howes PDP has
a FAR of 1.24, which excludes the four upper floors).
C. Section 4.12(E)(1)(a) Building Setback
Setbacks of new buildings shall align with the setback of existing buildings
within the block face in which the new building is being constructed. The
Canyon/Howes PDP proposes a zero foot setback along Howes Street
and Canyon Avenue. While this setback is consistent with the minimum
required in Section 4.12(D)(2), this section requires new buildings to align
with existing buildings. The block on Howes Street includes three existing
buildings. Each of the buildings has a front yard setback from Howes
Street of around 20 feet. This would require the PDP to have a front
setback of 20 feet as well. The applicant has submitted a modification
request to reduce this setback to zero feet, to be more consistent with the
goals of the Downtown district.
Canyon/Howes, Project Development Plan #45-02
Type II Planning and Zoning Board Review
Page 2
EXECUTIVE SUMMARY:
This project has been reviewed in accordance with the applicable requirements of the
Land Use Code (LUC) and was found to be in substantial compliance with the following:
1. The proposed land uses are permitted in the (D) Downtown District, Canyon
Avenue Subdistrict.
2. The Project Development Plan complies with all applicable district standards
of Section 4.12 of the Land Use Code, (D) Downtown District.
3. The Project Development Plan complies with all applicable General
Development Standards contained in Article 3 of the Land Use Code.
FINDINGS and ANLYSIS:
Background
The surrounding zoning and land uses are as follows:
N: D — Office, Financial
S: D — Office
E: D — Office, Financial
W: D — Office, Restaurant
The property was annexed in February 1873 with the original incorporation of the
City of Fort Collins.
2. Division 4.12 of the Land Use Code, Downtown Zone District
The use of multi -family residential, retail establishments and restaurants are
permitted in the D zone district, Canyon Avenue subdistrict, subject to Planning
and Zoning Board Review (Type 11). Office, clinics, galleries and studios are
permitted in the D zone district, Canyon Avenue subdistrict, subject to
Administrative Review (Type 1).
ITEM NO. 3
MEETING DATE 5 i5 03
STAFF Bob Barkeen
Citv of Fort Collins PLANNING AND ZONING BOARD
STAFF REPORT
PROJECT: Canyon & Howes
Project Development Plan - #45-02
[Type II Planning and Zoning Board Review]
OWNER: Howes/Canyon, LLC
C/o Bill Coulson
510 West Magnolia Street
Fort Collins, CO 80521
APPLICANT VF Ripley Associates
401 West Mountain Avenue, Suite 201
Fort Collins, CO 80521
PROJECT DESCRIPTION:
Canyon/Howes is a mixed -use project development plan located at the southwest
corner of Howes Street and Canyon Avenue. The proposed building is six stories in
height. The lower two floors will be for retail/office space, and four upper floors for
residential uses. A total of 20 loft -style multi -family units will occupy the upper four
floors. Off-street parking is provided within the lower level of the building. The lower
level parking lot will encroach under a portion the adjacent lot south of the site (Linden
Press). An easement has been obtained from this adjacent landowner to permit the
underground parking to locate under the existing surface lot for the Linden Press
Building. Additional parking is also provided in a small surface lot south of the building.
Canyon Avenue and Howes Street will also provide additional on -street parking. A
former drive-thru bank is currently on the lot. This building will be razed as part of the
development of this project. Existing canopy street trees along Howes Street and
Canyon Avenue will be preserved as part of the site plan, or relocated elsewhere on the
site or off site. The property is zoned D — Downtown District, and is within the Canyon
Avenue sub -district.
A modification request is accompanying the project development plan. This request is to
vary from the setback requirements within Section 4.12(E)(1)(a)(1) Building Setbacks,
within the D — Downtown zone district. This code section requires new buildings to align
with existing buildings within the same block face. The Canyon/Howes building
encroaches within this contextual setback.
RECOMMENDATION: Approval
COMMUNITY PLANNING AND ENVIRONMENTAL SERVICES 281 N. College Ave. PO. Box 580 Fort Collins, CO 80522-0580 (970) 221-6750