HomeMy WebLinkAboutHOWES/CANYON MIXED-USE (CORTINA) - PDP - 45-02 - CORRESPONDENCE - (7)REC��V�o
REVISION ���,� o�
C�RR fNT p cni3
COMMENT S HEET�"v"'
DATE: February 12, 2003 TO: Xcel Energy
PROJECT: #.45-02 HOWES/CANYON MIXED -USE PDP -
TYPE II (LUC)
All comments must be received by Bob Barkeen no later than the
staff review meeting:
March 5, 2003
❑ No Comment
Problems or Concerns (see below or attached)
**PLEASE IDENTIFY YOUR REDLINES FOR FUTURE
REFERENCE**
S%tMe coM MEKTT Rrpj y &,i d rnwrD ON //-L2,o2
CHECK HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS
Plat _ site _ DrarW Report Other
Dat�tili��Re<IL Uric �iam>srapr Signature: 4,6W
z-a7-03
Citv of Fort Collins
Department: Water Wastewater Issue Contact: Roger Buffington
Topic: Utility plans
Number: 106 Created: 3/10/2003
The floor drains in the garage area (which also receive precipitation run-off from the drive) must be
connected to the storm sewer.
Department: Zoning Issue Contact: Jenny Nuckols
Topic: ZONING
Number: 78 Created: 2/20/2003
Please make sure project name references are consistent - is it Howes/Canyon or Canyon/Howes
Be sure and return all of your redlined plans when you re -submit.
If you have any questions regarding these issues or any other issues related to this project,
please feel free to call me at (970) 221-6750.
Yours Truly,
Bob Barkeen
City Planner
Page 5
needs to be protected for storms up to the 100-year. For storms greater than the 100-year, no haudroulic
sizing is required, but the flow needs to have an outfall other than the driveway, similar to detention ponds
with the emergency overflow wier. The entrance to the driveway needs to be at a higher elevation than
another point along that stretch of road. Please call Glen Schlueter or Wes Lomarque at 221-6700 to set up a
meeting to discuss.
Number: 104 Created: 3/7/2003
Stormwater that flows into a sanitary sewer is not allowed per City standards. An alternate method needs to
be discussed with the City Utilities Department.
Number: 105 Created: 3/7/2003
A street capacity analysis needs to be included to prove that the building will be protected in the 100-year
storm. This may include an analysis of the entire basin that contributes flow to Canyon and Howes street.
Topic: Erosion/Sediment Control
Number: 65 Created: 12/23/2002
Repeat Comment 3/11/03
1. What is going to happen to protect the area from sediment during construction of the pipelines on the
northwest corner of the site?
Please call Bob Zakely at 221-6700 for any questions
Department: Transportation Planning Issue Contact: Tom Reiff
Topic: Parking
Number: 58 Created: 12/18/2002
Relocate the bike rack along Canyon near the elevator to a more visible and secure location along Canyon.
Also consider locating bike parking facilities in the underground lot for future residents. FOLLOW-UP
COMMENT - According to the landscaping plan the bike rack near the elevator is located in a planter?
Please correct the landscaping plan to account for the bike rack space.
Number: 59 Created: 12/18/2002
Locate a handicap parking stall along Canyon that is conveniently located to the entrances along Canyon
and Howes. FOLLOW-UP COMMENT - Please design the parking stall north of the bulb out and the under
ground driveway ramp as a handicap stall with a loading area and a standard access ramp. Please contact
me if you have any questions.
Department: Water Wastewater Issue Contact: Jeff Hill
Topic: General
Number: 73 Created: 2/18/2003
Include the standard general note to coordinate abandonment's of water and sewer lines with the city
utilities.
Number: 74 Created: 2/18/2003
Provide stationing of proposed sanitary sewer services from the downstream manhole.
Number: 75 Created: 2/18/2003
Provide a complete lowering detail for the proposed fire line and existing 4-inch water main crossing.
Number: 76 Created: 2/18/2003
Show and label concrete encasement of sewer lines which cross above or within 18-inches vertically of water
lines.
Number: 77 Created: 2/18/2003
Correctly show water and sewer services on landscape and site plans.
See site, landscape and utility plans for other comments.
Page 4
3.3.03 - Please provide a letter of intent from the DDA prior to hearing
Number: 16 Created: 12/11 /2002
Please see redlines and landscape plan for further comments.
Repeat 3.3.03
Topic: Storm Drain Profile
Number: 98 Created: 3/6/2003
There has been a change in policy regarding the use of geotextiles when less than 2' of cover is provided:
only concrete pavement will be allowed in these locations, and textiles are no longer allowed.
Topic: Utility Plan Cover Sheet
Number: 79 Created: 3/3/2003
The bonnet bolt survey is no longer in use. Please use COFC vertical control
Number: 91 Created: 3/3/2003
Please include sheet 4a in the index and sheet numbering/totals.
Department: Light & Power Issue Contact: Doug Martine
Topic: General
Number: 72 Created: 2/14/2003
Previous Light & Power comments (#1 & 2) still apply. No additional comments.
Department: PFA Issue Contact: Michael Chavez
Topic: General
Number: 93 Created: 3/5/2003
Address Numerals: Address numerals shall be visible from the street fronting the property, and posted with a
minimum of 6-inch numerals on a contrasting background. (Bronze numerals on brown brick are not
acceptable) 97 UFC 901.4.4
Number: 94 Created: 3/5/2003
Water Supply: No commercial building can be greater then 300 feet from a fire hydrant. Fire hydrants are
required with a maximum spacing of 600 feet along an approved roadway. Each hydrant must be capable
of delivering 1500 gallons of water per minute at a residual pressure of 20 psi. 97 UFC 901.2.2.2
Number: 95 Created: 3/5/2003
This proposed building shall be fire sprinklered. 97 UFC 1003.2.9
Number: 96 Created: 3/5/2003
A local alarm is required to notify all occupants. 97 UFC 1007.2.9.1.1 (Exception #2)
Number: 97 Created: 3/5/2003
Underground Parking Garage: Is there only one-way in and out? Will ventilation for the parking garage be
provided?
Department: Stormwater Utility Issue Contact: Wes Lamarque
Topic: Drainage
Number: 102 Created: 3/7/2003
Please provide a formal variance request for the alternate water quality measures proposed in this PDP. This
can be in a letter format with information regarding required extended water quality volume, why this can
not be achieved, proposed stormceptor information; etc.
Number: 103 Created: 3/7/2003
There is concern that water will flow into the underground parking during the minor and major storms at the
driveway entrance. There is no curb that can handle any amount of volume down the street. The building
Page 3
It appears that the layer showing the proposed bumpout/driveways was turned off for this sheet. Please
show it.
Topic: General
Number: 36 Created: 12/11 /2002
Please see redlines and utility plan checklist for any additional comments.
3.3.03 - repeat
Number: 90 Created: 3/3/2003
Prior to hearing, please provide a letter of intent from the owners of the Linden Press property regarding this
project's use of their property and that they plan on completing any needed easements or other agreements
for that use.
Number: 92 Created: 3/3/2003
It appears that easements for construction of the underground parking structure on the south side of the site
will be needed from the neighboring property owners (south of Linden Press and south of the mechanical
building). Please provide letters of intent prior to hearing.
Where will staging take place?
Number: 99 Created: 3/6/2003
Where will the roof drains outlet? Please note that they will not be allowed to outlet over a public sidewalk -
under -walk drains would be required.
Number: 100 Created: 3/6/2003
If under -ROW storage is approved, please provide detailed plans for it.
Topic: Grading plan
Number: 28 Created: 12/11 /2002
Please show new contour lines.
3.3.03 - It would help to have a more distinctive (thicker?) line type for the new contours. They're currently
difficult to pick out.
Number: 80 Created: 3/3/2003
The southernmost driveway on Canyon should be a Type 2 driveway, with the corresponding ramp type for
the sidewalks, the same as the driveway down to the underground parking.
Number: 81 Created: 3/3/2003
The ramp heading north at the corner of Canyon and Howes should have a width at least equal to the ramp
across the street from it.
Topic: Overall Utility Plan
Number: 39 Created: 12/11 /2002
Please dimension and label property lines/ROW.
3.3.03 - repeat
Number: 82 Created: 3/3/2003
Both driveways need to be concrete to the ROW line.
Number: 83 Created: 3/3/2003
Please show where the drain that collects the water from the driveway down to the underground parking will
drain to.
Topic: Site Plan
Number: 13 Created: 12/11 /2002
Encroachment permits are required for seat walls/columns/steps/etc. in the ROW. Also, an agreement with
the DDA must be provided for the maintenance of these items, and for special paving.
Page 2
(0!;6M
E STAFF PROJECT REVIEW
City of Fort Collins
VF RIPLEY ASSOC Date: 3/12/2003
CATHY MATHIS
401 W. MOUNTAIN AVE. #201
FT. COLLINS, CO 80521
Staff has reviewed your submittal for HOWES/CANYON MIXED -USE PDP - TYPE II (LUC) -
#45-02, and we offer the following comments:
ISSUES:
Department: Current Planning
Topic: Utility plans
Number: 107
Issue Contact: Bob Barkeen
Created: 3/12/2003
The following comments do not address the issue relating to underground storage space that would be
provided within the right-of-way. If this is proposed, a revised set of drawings will need to be submitted and
reviewed prior to scheduling for Planning and Zoning Board review.
The utility drawings show 38 parking spaces rather than 39 spaces. Please change this on the site plan.
Number: 108 Created: 3/12/2003
A modification is needed for the setback along Howes Street.
Department: Engineering Issue Contact: Katie Moore
Topic: Canyon Avenue Profile
Number: 84 Created: 3/3/2003
Not enough data was provided to verify that cross -slopes will be adequate. Please provide elevations on the
centerline profile for this purpose.
Number: 85 Created: 3/3/2003
Centerline stationing is required per LCUASS for all street design.
Number: 86 Created: 3/3/2003
The minimum flowline grade is 0.5%, and there is a large section of curb that does not meet this requirement.
Topic: Detail Sheet
Number: 87 Created: 3/3/2003
Several details are included that are not needed. Please remove.
Also, since the last submittal, Inspection has chosen a different detail (attached) to be used only for the
texture and dimension of the surface to replace the colored concrete square on the City's standard ramp
details.
Number: 89 Created: 3/3/2003
Please use drawing 1101 for the handrail detail.
Number:.101 Created: 3/7/2003
Please provide a detail of the non-standard driveway including ramp transitions for the sidewalk and a cross-
section.
Topic: Drainage
Number: 88
Created: 3/3/2003
Page 1