Loading...
HomeMy WebLinkAboutCLOCK TOWER APARTMENTS - PDP - 37-02A - SUBMITTAL DOCUMENTS - ROUND 2 - ROUTING SHEETProject. C,loc—L owr PAo i'DP Planner: 30 Engineer:N— Traffic Operations: Date: I2/Zyloz. Items Requested Site land Plat Utility Drainage R t Other Items Required Redlined Items Being returned Site land Plat Utility Drainage Rpt Other Items Being Returned Engineering itormwater �C X X _ _ �c x Water/Waitewatc /x x x X x x_ x iraf t Opetationt _ Irani. Planning 'x x lransfort _ — — Natural Rmourcm _ Park Planning Totals 5 `4 Other: Note: All redlined items Should k returned with the resubmittal/ revisions. Item: Date: n % Revisions Routing Sheets, :7 FILE: PROJECT PLANNER ENGINEERING: PAVEMENT ZONING BUILDING INSPECTION LIGHT & POWER MAPPING / DRiF"IING FORESTRY FCLWD/ELCOBOXELDER FIRE POLICE ADVANCE PLANNING STREETS R.O.W. PLANNING WATER CONSERVATION ' POST OFFICE US WEST PUBLIC SERVICE SCHOOLS: POUDRE/THOMPSON CABLE TV STATE HIGHWAY DEPARTMENT DITCH COMPANY RAILROAD: UP or BN/CS REA/DOE/PRPA TOTAL Rey. 5-07-97 ©e o� r .. y -- ✓ V