HomeMy WebLinkAboutCAMBRIDGE LOFTS APARTMENTS - FDP - 6-03D - CORRESPONDENCE -Project: Date:
Planner: Ot'� Traffic Operations: Engineer: JO
Items Requested
Redline ems Being Returned
in
_
1O
a
v
m
0
Other Items Required
2Other
M
9
a
�
v
m
m �
0
Items being
Returned
-Engineering1
Stormwater
Water Wastewater FCLWD
I
Traffic Operations
Transportation Planning
Transfort
-Engineering Pvmt.
Light & Power
Technical Services
PFA
4�ci
2 '
TOTALS
Other:
LVA
Note: All redlined items should be returned with the resubmittal/revisions.
Please call 221-6750 to schedule a resubmittal
appointment,
2. Show the water and sanitary sewer lines on the Landscape Plan.
Stormwater:
1. A chase detail is needed and must be provided to the City for
review.
This completes staff (and outside reviewing agencies) review and
comments at this time. Red -lined plan from City departments are
included with this comment letter. Additional comments and red -lined
plans may be forthcoming. Another round of staff review is
determined to be necessary. This proposal is subject to the 90-day
revision re -submittal requirement (from the date of this comment
letter, being May 25, 2004) as set forth in Section 2.2.11(A) of the
Land Use Code. Be sure and return all of your red -lined plans when
you re -submit. The number of copies of each document to re -submit is
shown on the attached Revisions Routing Sheet.
If you have any questions regarding these issues or any other issues
related to this project, please feel free to call me at 221-6341.
Yo irrs Truly,
Steve Olt
City Planner
cc: Susan Joy
North Star Design
Architecture West
King Surveyors
Current Planning File #6-03D
Page 8
Department: Water Wastewater Issue Contact: Roger
Buffington
Topic: Plat
Number: 111 Created: 5/21/2004
[5/21/041 Will there be any restaurants in the building? If so,
provide grease interceptor.
Department: Zoning Issue Contact: Jenny Nuckols
Topic: Zoning
Number: 9 Created: 12/19/2003
[4/28/041
[12/19/031 The tree cut-outs don't count as landscaped islands and
don't break up the parking aisles into 15 or fewer spaces in a row.
Please review - also it creates 2 non -conforming spaces that are too
short - but people will still attempt to park in them - but not be
able to pull all the way forward.
Number: 10
[4/28/04]
Created: 12/19/2003
[12/19/031 North end parking aisle shows 16 spaces, south end shows
17, only 15 in a row without an intervening island are allowed
Number: 12
[4/28/041
Created: 12/19/2003
[12/19/031 Plant Notes #4 - add to working - value of landscaping
"and installation"
Number: 89 Created: 4/28/2004
[4/28/041 Please remove the small print referencing landscaping on
the site plan. Does not need to be on site plan and is too small to
read anyway.
The following comments and concerns were expressed at staff review
on May 19, 2004:
Engineering:
1. No new right-of-way is needed at this time for South Shields
Street and Scott Avenue.
2. No new right-of-way is needed at this time for West Plum Street;
however, a public access easement is needed.
Water/Wastewater:
1. Is the proposed 1" water service adequate_ to serve this
development?
Page 7
0
Number: 102 Created: 5/17/2004
Please provide a F.F. elevation for the proposed building.
Number: 103 Created: 5/17/2004
Please provide a project schedule indicating when various BMP's will
be installed within the framework of the construction. You don't
need to use specific dates (months), you can just use project
phases, etc.
Department: Transportation Planning Issue Contact: Tom Reiff
Topic: Transportation
Number: 84 Created: 1/12/2004
[5/18/043 A few additional access ramps still need to be added to
the plans (see red lines).
[1/12/04] Please include all access ramps associated with sidewalks
on all the plan sets including the utility and site plans.
Number: 86 Created: 1/12/2004
[5/18/041 Please remove the proposed new vertical v-shaped curbs
shown on the utility plans along the Scott R.O.W. These vertical
curbs were intended for landscaping that is not longer required.
[1/12/04] Given the planned future connection of Scott Avenue to W.
Elizabeth, please replace the proposed shade trees along Scott
Avenue with ornamental trees.
Number: 87 Created: 1/12/2004
(5/18/041 There are minor discrepancies between the utility plans
and the site and landscape plans. Please clean up the Plum Street
sidewalk configuration between the plan sets. Keep in mind that the
sidewalk needs to continue to the edge of the property line and
connect to the existing sidewalk.
[1/12/041 The sidewalk along Plum Street will need to continue to
the edge of the property line to the east. Please include a sidewalk
that crosses the driveway to the eastern property line (see red
lines for alignment).
Department: Water Wastewater Issue Contact: Jeff Hill
Topic: General
Number: 47 Created: 12/30/2003
(5/20/04] Curb stops must be with in a utility easement and the
meter pit may not be located more than 2 feet from the curb stop.
Provide flow calculation for the sizing of the proposed water
service for the residential portion of this development.
[12/30/031 Curb stop and meter pit may not be located in the
sidewalk or any other traveled way.
See site, landscape and utility plans for other comments.
Page 6
Number: 95
[5/10/041 Sheet 4 - is unscannable
Created: 5/10/2004
Remove landscaping.
Number: 97 Created: 5/10/2004
[5/10/041 Sheet 5 - Remove the landscaping. Block out background
around text. Correct a misspelled word.
Number: 98 Created: 5/10/2004
[5/10/041 Cover Sheet - Please provide the name, address, and phone
number of the Owner and/or Developer.
Number: 99 Created: 5/10/2004
(5/10/041 Sheet 4 - Please provide finish grade elevations for all
lot corners and finish floors/top of foundation of all buildings for
all lots.
Number: 100 Created: 5/10/2004
[5/10/041 Sheet 4 - Please provide the statement: The top of
foundation elevations shown are the minimum elevations required for
protection from the 100-year storm.
Department: Light & Power Issue Contact: Doug Martine
Topic: Light & Power
Number: 1 Created: 12/12/2003
(4/28/04]
[12/12/031 The developer will need to coordinate power
requirements, transformer locations, and electric development
charges with Light & Power Engineering (970)221-6700.
Number: 2
[4/28/041
Created: 12/12/2003
[12/12/031 The existing transformers serving Cambridge apartments
will need to be relocated. The existing wood fence enclosure around
these transformers is not Light & Power approved anyway.
Department: Police Issue Contact: Joseph Gerdom
Topic: Utility Plans
Number: 104 Created: 5/18/2004
(5/18/041 Parking lot lighting levels are below required 1.Ofc.
Also, important in making revisions - evaluate location of plant
materials. Need photometrics for area next to stairs.
Department: Stormwater Utility Issue Contact: Wes Lamarque
Topic: Utility Plans
Number: 101 Created: 5/17/2004
Please provide site specific details for the sidewalk chase and
concrete channel. See redlined plans. Also, provide a valley pan
detail.
Page 5
Number: 109
[5/18/041 From Technical Services
Created: 5/18/2004
Boundary and legal close.
Number: 110 Created: 5/18/2004
(5/18/041 From Technical Services: The need for a block in a 2 lot
subdivision is unnecessary.
Topic: Site Plan
Number: 23 Created: 12/23/2003
[5/10/041 Repeat comment. The site plan is not scannable and will
not be approved until it meets the criteria set forth in appendix
E6. The font is so small in some places that I cannot read it or
review it. More comments could follow when it becomes legible.
[12/23/031 Correct all overlapping labeling and increase font size
to meet the minimum requirement. See appendix E6 for additional
scanability requirements.
Number: 90 Created: 5/10/2004
[5/10/041 Site plan does not match the utility plans.
Topic: Utility Plans
Number: 35 Created: 12/23/2003
[5/10/041 Correction required, see redlines.
[12/23/03) Provide two project bench marks referencing the City's
datum.
Number: 37 Created: 12/23/2003
[5/10/041 Because you've added a horizontal control sheet, you can
put all the dimensioning on there and just show the emergency access
easement on all the other sheets (it should help keep your sheets
legible). Make sure that the EAE is located in an area free of all
obstructions (parking stalls, curb and gutter, etc).
[12/23/03) Show, dimension, and label the fire lane required by
PFA.
Number: 92 Created: 5/10/2004
[5/10/041 Sheet 2 - please be a little more specific on the
variance granted in line 48. Include the section, the actual
requirement, and then the variance itself. Also; include the
variance to the emergency access easement miminum widths and radii
granted by PFA.
Number: 93 Created: 5/10/2004
[5/10/041 Sheet 3 - Label all easements with what the easement is
for (Utility, Emergency Access Easement, etc).
Number: 94 Created: 5/10/2004
[5/10/041 Sheet 3 - Correct all overlapped labeling. Remove the
landscaping.
Page 4
,/
Topic: Landscape Plan
Number: 26 Created: 12/23/2003
[5/10/041 Repeat comment.
[12/23/031 Show all utilities and easements (dimensioned and
labeled).
Number: 28 Created: 12/23/2003
[5/10/041 Repeat comment. The landscape plan will not be approved
until all requirements in Appendix E6 have been met.
(12/23/031 See appendix E6 for scanability requirements.
Number: 91 Created: 5/10/2004
[5/10/041 The landscape plan does not match the utility plan.
Number: 96 Created: 5/10/2004
[5/10/04) Planters along Shields street must be located outside the
existing utility easement or are these tree grates? Please label
accordingly.
Topic: Plat
Number: 29 Created: 12/23/2003
[5/10/041 Repeat comment. Corrections required, see redlines.
[12/23/031 Most of the plat language shown is incorrect. Please
see the attached for the correct plat language.
Number: 31 Created: 12/23/2003
[5/10/04]\ Repeat comment. Labeled incorrectly.
[12/23/03] Change the "Pedestrian Access Easement" along Plum
Street to read "Public Access Easement".
Number: 32 Created: 12/23/2003
[5/10/041 Repeat comment. Labeled incorrectly and missing width
dimensions. Also, the emergency access lane is shown extending into
the parking stalls and over the curb on the utility plans. This,
for obvious reasons, will not work. Please locate the emergency
access lanes out of these areas and in an area free of all
obstructions.
[12/23/031 Dedicate the fire lane on the plat, label as "Emergency
Access Easement".
Nu*nber: 106 Created: 5/18/2004
[5/18/041 Instead of having a 15' utility easement and 24' public
access easement along Plum, just make one combined 24' Public Access
and Utility Easement.
Number: 108 Created:• 5/18/2004
[5/18/04] Label Scott Avenue as 25' ROW.
Page 3
Number: 116 Created: 5/24/2004
[5/24/04] It is difficult to follow the alignment of the existing
(proposed?) sidewalk along the south side of West Plum Street, north
of the 3 buildings in this development.
Number: 117 Created: 5/24/2004
[5/24/041 Please add a scale on this sheet for the Full Landscape
Plan. It should, presumably, be 1" = 30.0'.
Topic: Site Plan
Number: 118 Created: 5/24/2004
[5/24/041 On the Site Plan, eliminate the labeling for plant
material around the new building. The plant material is not shown
but the labeling still is.
Number: 119 Created: 5/24/2004
[5/24/041 Under the Land Use Statistics on the Site Plan, the
Maximum Building Height is shown to be 56'-0". This is inconsistent
with the Exterior Elevations Plan, which shows the building to be
58'-0" high.
Number: 121 Created: 5/24/2004
[5/24/041 The Planning & Zoning Certificate block is not needed on
the Site Plan and should be removed.
Number: 122 Created: 5/25/2004
[5/25/041 There are numerous words misspelled in the General Notes
on the Site Plan (please see red -lined plan).
Department: Engineering Issue Contact: Susan Joy
Topic: General
Number: 41 Created: 12/23/2003
[5/18/041 It was agreed that a Public Access Easement would be
dedicated to the back of walk in lieu of dedicating the additional
ROW at this time_ Please dedicate this easement on the plat.
(12/23/031 This project is responsible for dedicating their half of
the current local street width (51' total) and for the design and
construction of Scott Avenue. There is currently 20' of ROW for
Scott Avenue. That means that this project needs to dedicate an
additional 15.5', or (51-20)/2. However, you may dedicate the
additional width as a Public Access, Utility, and Drainage Easement
instead so that the applicant still retains the use of the property
as currently shown.
In addition, this project is responsible for dedicating their half
of a minor collector with parking along Plum. There is currently
40' of ROW and a total of 76' is needed. That means that this
project must dedicate an additional 18' of ROW on Plum. They do NOT
need to dedicate the utility easement along Plum.
No additional ROW along Shields is required.
Page 2
STAFF PROJECT REVIEW
City of Fort Collins
Eastpoint Studio Date: 05/25/2004
c/o Donald Brookshire
3207 Kittery Court
Fort Collins, CO. 80526
Staff has reviewed your submittal for CAMBRIDGE LOFTS, Final
Compliance - TYPE I (LUC), and we offer the following comments:
ISSUES:
Department: Current Planning Issue Contact: Steve Olt
Topic: Building Elevations
Number: 120 Created: 5/24/2004
[5/24/041 The Exterior Elevations Plan shows the building to be
58'-0" high. This is inconsistent with the Site Plan, which
indicates a Maximum Building Height of 56'-0" under the Land Use
Statistics.
Topic: Landscape Plan
Number: 112 Created: 5/24/2004
[5/24/041 The (Final Compliance) Landscape Plan does not
necessarily satisfy the City Forester's requirement for tree
mitigation for the loss of 4 existing significant trees. Based on
the previous Landscape Plan, Tim Buchanan stated that 12 new trees
need to be upsized to 3.0" caliper for adequate mitigation. The
current plan shows 7 new deciduous trees to be upsized to 3.0"
caliper and 5 new ornamental trees to be upsized to 2.5" caliper.
Mr. Buchanan must determine if the current plan satisfies the Land
Use Code requirement for tree mitigation.
Number: 113 Created: 5/24/2004
[5/24/041 The proposed "Fallgold" Ash at the northwest corner of
the site is too close to the west edge of the driveway into the
development. It must be a minimum of 8' from edge of driveway. The
"Fallgold" Ash is not shown in the Plant Legend. Also, this proposed
tree may be in conflict with a future Scott Avenue extension.
Number: 114 Created: 5/24/2004
[5/24/041 There are 3 Ash trees shown in the planting island just
west of the existing church. The assumption is that they are to be
"Summit" Ash and should be labeled as such on the plan.
Number: 115 Created: 5/24/2004
[5/24/041 Plan Note #4 must be revised to include the reference to
1250 of the "materials & labor" for the landscaping.