HomeMy WebLinkAboutCSU SOUTH DORMITORY - SITE PLAN ADVISORY REVIEW - 50-02A - CORRESPONDENCE -Since the building is taller than 40', the Building Height Review standards within Section 3.5.1(G) should be followed. Be sure and return all of your redlined plans when you re -submit. If you have any questions regarding these issues or any other issues related to this project, please feel free to call me at (970) 221-6750. Yours Truly, Bob Barkeen City Planner Page 6 There is a discrepancy between the site / landscape and the utility plan on the driveway cut onto James Court. One plan has it Identified for emergency access only, while the utility plan has it open for public access. It is requested that the drive be open to both emergency vehicles and the public. Number: 47 Created: 2/19/2003 Please dedicate the required right of way (ROW) for James Court and Shields St. with this submittal. James Court is a local street which consists of a 51-foot total ROW, and Shields St. is a 4-Lane Arterial with a 115-foot total ROW from centerline. A sidewalk (detached preferred) will need to be constructed along the frontage of James Court from Shileds St. and connect to the existing attached sidewalk along Burton Court. Department: Water Wastewater Issue Contact: Jeff Hill Topic: General Number: 34 Created: 2/18/2003 Show and label all fittings, thrust blocks, gate valves, etc on water mains. Number: 35 Created: 2/18/2003 Provide utility easement for proposed water mains, fire hydrants, curb stops and sewer mains. Number: 36 Created: 2/18/2003 Show and label location of proposed 4-inch meter vault. Number: 37 Created: 2/18/2003 Include profiles of proposed sanitary sewer mains. Number: 38 Created: 2/18/2003 Include all appropriate standard details for water and sewer appurtenances. Number: 39 Created: 2/18/2003 Include standard general notes on utility plans pertaining to depth of bury of water lines and polywrapping of D.I.P. Number: 40 Created: 2/18/2003 Provide anticipated water demands and sanitary sewer flow data for review. This information is needed to evaluate the alternate sanitary sewer routes. Number: 41 Created: 2/18/2003 Plans as submitted are insufficient to provide a detailed review. More detailed comments will be provided when more detailed plans are submitted. Department: Zoning Issue Contact: Peter Barnes Topic: zoning Number: 3 Created: 1 /30/2003 Without a more detailed and dimensioned site plan, it's hard to tell if they comply with the front setback requirement found in Sec. 4.24(D)(2)(C). Based on what I assume to be the front lot line as shown on the utility plan, it looks like they donl comply with the minimum setback. Number: 5 Created: 1 /30/2003 Need sidewalk ramps at the Handicap parking spaces. Need at least one van accessible handicap parking space. Number: 6 Created: 1 /30/2003 Their narrative states that the City will accept off -site parking since they donl provide the minimum on -site that is required. That is true, but they need to provide a vicinity plan or something showing where the alternative parking location is. Number: 7 Created: 1 /30/2003 Page 5 Please provide 40-hour extended detention water quality calculations in the report, including volume required and orifice sizing. Number: 56 Created: 2/24/2003 Please provide a water quality outlet structure detail on the plans showing all dimensions and structural components. Number: 57 Created: 2/24/2003 Please provide storm sewer plan and profiles for all storm sewers. Due to this project being a site plan advisory review, the most critical area that needs to be shown is the connection to the City storm sewer in Pitkin Street and any pipe in the right-of-way. Tailwater effects from the City storm sewer do not need to be applied to this ouffall, thus the HGL of the ouffall pipe does not need to be calculated or shown on the profiles. Number: 58 Created: 2/24/2003 Please provide any details that are applicable to this site. (Inflow curb and gutter for Pitkin st., manholes, sidewalk chases, curb cuts, etc.) Number: 59 Created: 2/24/2003 Please provide cross -sections for the proposed grading to ensure that the offsite flows can pass through the site as suggested. This should be done at the west and east ends. These cross -sections should be on the plans as well as the report and include all elevations. Also, please provide pond spillway cross -sections labeled with elevations and WSEL. Number: 60 Created: 2/24/2003 If the retaining wall or any other improvements, including grading, is to be located off -site, a drainage easement will be required. If access to any off -site properties is required to construct any of the on -site improvements, a temporary construction easement will be required. Number: 61 Created: 2/24/2003 Please provide at least 10-feet separation between center -line of storm sewer and any trees. Topic: Sediment/Erosion Control Number: 62 Created: 2/26/2003 Please submit an erosion control plan with the next submittal for review. Department: Transportation Planning Issue Contact: Tom Reiff Topic: General Number: 42 Created: 2/19/2003 The site/landscape plan is different than the submitted utility plan. It is unclear which proposal is correct and should be reviewed. Please clarify which proposed plan is correct. Number: 43 Created: 2/19/2003 It is recommended that a fence not prohibit students that may be walking to CSU from James Court. Consider placing bollards at the edge of the development and James Court to allow direct pedestrian access to CSU. Number: 44 Created: 2/19/2003 A meeting is requested to discuss the pedestrian and bicycle porosity in this area as discussed in the West Central Neighborhood subarea plan. Number: 45 Created: 2/19/2003 Will the doors located near the bike racks be accessible to residents and visitors from the outside? Number: 46 Created: 2/19/2003 Page 4 A sidewalk, detached if possible, is required along James Court out to Shields. Number: 52 Created: 2/19/2003 Unless a variance request is applied for and approved, the required driveway entrance type onto James Court is the standard driveway cut (angular, not radial). Department: Natural Resources Topic: General Number: 54 No Issues Issue Contact: Doug Moore Created: 2/24/2003 Department: PFA Issue Contact: Ron Gonzales Topic: Fire Number: 9 Created: 2/5/2003 A 30-foot permanent fire lane is required for this project due to the heighth of the building. Design criteria is stipulated in LCUASS. A second point of emergency access is required. A temporary fire lane for the construction site shall be submitted prior to beginning construction for approval Number: 10 Created: 2/5/2003 A fire hydrant is required within 300 feet of the building. The required fire flow=1500 gpm @ 20 psi. A letter from the water purveyor is required stating whether or not the fire flow Is available. Number: 11 Created: 2/5/2003 Due to access from the lowest level of fire department access, this edifice is being treated as a 4-story building due to height Number: 12 Created: 2/5/2003 Standpipes shall be required with 100 psi to be available at the roof. A booster pump may be necessary to achieve this. Number: 13 Created: 2/5/2003 A commercial fire sprinkler system (NFPA 13) shall be required due to building height and the type of construction in attic. Number: 14 A building fire alarm system may be required. Created: 2/5/2003 Number: 15 Created: 2/5/2003 A Knox Box shall be required to be located at the main lobby entry on the southwest side. Number: 16 Created: 2/5/2003 The security system shall fail-safe when the building fire alarm system is activated. Number: 17 Created: 2/5/2003 The address for this building shall be visible from the street on which it fronts. Department: Police Issue Contact: Joseph Gerdom Topic: General Number: 53 Created: 2/21/2003 No Comments Department: Stormwater Utility Topic: Drainage Number: 55 Issue Contact: Wes Lamarque Created: 2/24/2003 Page 3 Number: 49 Created: 2/19/2003 All plan sheets need to be 24" by 36. Number: 50 Created: 2/19/2003 Please see redlines for any additional comments. Number: 51 Created: 2/19/2003 It is recommended that the driveway connection to James Court be on open connection, not just limited to Emergency access. Topic: Grading plan Number: 48 Created: 2/19/2003 If on attached sidewalk is proposed along James Court, a minimum width of 7' would most likely be accepted under a variance request, Topic: Site/Landscape plan Number: 29 Created: 2/7/2003 Please show all utilities on the landscape plan. They need to meet landscape separation requirements. Number: 30 Created: 2/7/2003 The labeled scale does not appear to be correct. Number: 31 Created: 2/7/2003 Will the sidewalk in front of the row of handicapped parking spaces be flush with the asphalt? Number: 32 Created: 2/7/2003 Burton Court is the north -south portion of the street system north of the proposed parking lot area. Both streets running east -west and intersecting Burton are named James Court. They are labeled correctly on the Utility plans. Topic: Utility Plan Number: 23 Created: 2/7/2003 Please show existing features (parking lots, buildings, streets, etc.) offsite for a minimum of 150' beyond project limits in all directions. Number: 24 Created: 2/7/2003 Please clearly Indicate the location of the emergency access lane, labeling radii around curves. Number: 25 Created: 2/7/2003 Please label the existing ROW along both Shields and James Court. If either streets are lacking in ROW to meet the Master Street Plan, please dedicate ROW to standards as required by the Land Use Code. James Court is a Residential Local needing a total width of 51'- this development would be responsible for half that width from the centerline of the existing road, or 25.5 feet. Shields is a 4-lane arterial, with a total ROW requirement of 115 feet. This development is also responsible for improvements to these streets to bring them up to current standards. Number: 26 Created: 2/7/2003 Please dedicate any needed easements. For example, the standard utility easement along local street ROW Is 9 feet, while along arterials it is 15 feet wide. Number: 27 Created: 2/7/2003 Please show all street arts onto city streets and add the note: Limits of street cut are approximate. Final limits are to be determined in the field by the City Engineering Inspector. All repairs are to be in accordance with City street repair standards. Number: 28 Created: 2/7/2003 Page 2 STAFF PROJECT REVIEW City of Fort Collins — COLORADO STATE UNIVERSITY Date: 2/26/2003 TOMMY H. MOSS FACILITIES MANAGEMENT FT. COLLINS, CO 80523-6063 Staff has reviewed your submittal for CSU SOUTH DORMITORY SITE PLAN ADVISORY REVIEW #50-02A, and we offer the following comments: ISSUES: Department: Current Planning Issue Contact: Bob Barkeen Topic: General Number: 63 Created: 2/26/2003 The landscape and site plan will need to be consistent. There are discrepancies among the two plans, Would it be possible to provide a building entrance along the north elevation that is central to the building? The proposed entrance onto Pitkin Avenue is secondary, and does not provide an emphasis along the north building facade. Number: 64 Created: 2/26/2003 A six-foot fence is shown along Burton Court. If an access point is located off of Burton Court, this fence may pose a safety concern with sight distance. It could be possible to end the fence at the houses along James Court then provide low growing shrubs in this area for parking lot screening. Additional parking lot screening should be provided at the western edge of the lot, adjacent to Shields Street. Pedestrian connections could occur from the parking lot to Burton Court with the fence removed. Number: 65 Created: 2/26/2003 There are two islands within the southern portion of the parking lot that appear to missing canopy trees. Department: Engineering Issue Contact: Katie Moore Topic: General Number: 18 Created: 2/7/2003 The utility plan is highly conceptual at best. Please submit utility plans according to the Lorimer County Urban Area Street Standards, as well as a completed utility plan checklist (LCUASS appendix E), a soils report, etc. Number: 19 Created: 2/7/2003 The site and utility/grading plans do not match. Please ensure that these match on future submittals. Number: 20 Created: 2/7/2003 There are new ADA requirements for pedestrian ramp texturing. Please see the attached handout for the detail to use. Number: 21 Created: 2/7/2003 Any proposed work to be done offsite will require letters of intent from affected property owners and completed offsite easements submitted to the City prior to final City signoff of the plans. Number: 22 Created: 2/7/2003 Gray lines on the plans are too light to be reproducible. Please darken them so that they are. Number: 33 Created: 2/7/2003 Please submit all documents relating to this project at the some time (i.e. the TIS and grading plans, etc., should have been submitted along with all other plans and reports). Page 1