Loading...
HomeMy WebLinkAboutINTERSTATE LAND - MODIFICATION OF STANDARD - 49-02 - CORRESPONDENCE - MODIFICATION REQUESTJune 9, 2003 Steve Olt City of Fort Collins Community Planning and Environmental Services P.O. Box 580 Fort Collins, CO 80522 RE: Interstate Land — Cooper Slough Buffer Modification Dear Steve, Co���caa o 0 urban design, inc. 3555 stanford road, suite 105 fort collins, Colorado 80525 (970) 226-4074 fax (970) 226-4196 e@cityscapeud.com �E�FIVED Duty 09 CURRENT PLANlyt,yG Included below are the comments received from City Staff from the first round review of Modification of Standard for the Cooper Slough Buffer on the Interstate Land property. An explanation of how issues have been addressed follows each comment. These comments were initially received on January 9, 2003. ISSUES: Department: Natural Resources Topic: General Number: 3 Comments from Staff Attached Issue Contact: Doug Moore Per several meetings with City Planning Staff and Department of Natural Resources staff, the modification request has been revised. The proposed buffer has been revised to reflect a distance averaging 254' from the agreed upon edge of Cooper Slough. Please see the attached plan, modification request and letter from Wildlands Consultants' Inc. The applicant continues to maintain that a 300' buffer adjacent to this section of Cooper Slough is excessive due to the lack of flowing water, standing water, wildlife habitat and ecological diversity. The applicant agrees that the warm waters of Cooper Slough may have once traveled within this area, but due development, the slough is merely a remnant of its former condition. The applicant is proposing a buffer that is greater than 80% of the minimum allowed but less than the required 300'. Please let me kngw ifbou need any additional information. Carter Cityscape Urban Design Page 1